DICW Middle Road Sanitary Sewer
~``
~L can C7F
Dui E
`~,~~
City of Dubuque
Engineering Department
50 W. 13th Street
Dubuque, IA 52001
(563) 589-4270
(563) 589-4205 FAX
CITY OF DUBUQUE, IOWA
SHORT FORM
PUBLIC IMPROVEMENT CONTRACT
THIS PUBLIC IMPROVEMENT CONTRACT (the Contract), made in triplicate, between the City of
Dubuque, Iowa (City), by its City Manager, through authority conferred upon the City
Manager by its City Council and Horsfield Construction, Inc. (Contractor)
of the City of P.O. Box 305, Epworth, Iowa 52045( ontrector Name)
(Contractor Address -City and State)
PROJECT TITLE: Dubuque Industrial Center West 3rd Addition -Sanitary Sewer Construction
across Middle Road
For and in consideration of the mutual covenants herein contained, the parties hereto agree as
follows:
CONTRACTOR AGREES:
1. To furnish all material and equipment and to perform all labor necessary for (the Project):
a.) Contractor shall use pipe and manholes provided by the City which are stored on site
b.) Contractor shall install sanitary sewer in accordance with the plans and specifications
for the Dubuque Industrial Center West 3rd Addition - Contract B dated May 18, 2005.
c.) Contractor agrees to using the unit prices as contracted under Contract B.
d.) Contractor agrees to reducing the unit prices, by the material costs, for those items that
the City is providing the materials for, (as itemized on proposal dated Nov. 20, 2006.
The work described above shall be completed at the following location(s):
From SMH 2-24(STA 194+25) to SMH 2-26 as shown on sheets C3.2 & C3.3 for the
Dubuque Industrial Center West 3rd Addition - Contract B project drawings.
The Project shall be constructed to the existing grades and to any revised grades as described
in this Project contract; in strict accordance with the requirements of the laws of the State of
Iowa and ordinances of the City of Dubuque relating to public works, and in accordance with the
Contract Documents which provisions and documents are each and all hereby referred to and
made a part of this Contract just as much as if the detailed statements thereof were repeated
herein.
Page 1 of 4
2. Contract Documents shall mean and include the following: This Improvement Contract; all
ordinances and resolutions heretofore adopted by the City Council having to do with the
Project; the Contractor's Proposal; and the conditions described in the Contract, including any
Special Conditions, Plans and Specifications and General Requirements as adopted by the
City Council for the Project.
3. All materials used by the Contractor in the Project shall be the best of their several kinds and
shall be put in place to the satisfaction of the City Manager.
4. The Contractor shall remove any materials rejected by the City Manager as defective or
improper, or any of said work condemned as unsuitable or defective, and the same shall be
replaced or done anew to the satisfaction of the City Manager at the cost and expense of the
Contractor.
5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30)
days after final completion and acceptance of the Project by the City Manager to pay any claim
that may be filed within said time for labor and materials done and furnished in connection with
the performance of this Contract and for a longer period if such claims are not adjusted within
that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to
protect itself against any claim that has been filed against it for damages to persons or property
arising through the prosecution of the work and such sums shall be held by the City until
suchclaims have been settled, adjudicated or otherwise disposed of.
6. The Contractor has read and understands the City of Dubuque Standard Specifications
including General Requirements and has examined and understands the project description
described in Section 1 and any attached Special Conditions herein referred to and agrees not
to plead misunderstanding or deception because of estimates of quantity, character, location or
other conditions surrounding the same.
7. The Contractor shall guarantee for a period two years and make good any other defect in any
part of the Project due to improper construction or material performance notwithstanding the
fact that said Project may have been accepted and fully paid for by the City. The guarantee
shall commence on the date that the City pays full compensation for the complete performance
of this contract.
8. The Contractor shall fully complete the Project under this Contract on or before
March 1, 2007
(DATE)
9. To the fullest extent permitted by law, the Contractor shall indemnify and hold harmless the City
from and against all claims, damages, losses and expenses, including but not limited to
attorneys' fees, arising out of or resulting from performance of the Contract, provided that such
claim, damages, loss or expense is attributable to bodily injury, sickness, disease or death, or
injury to or destruction of property (other than the Project itself) including loss of use resulting
there from, but only to the extent caused in whole or in part by negligent acts or omissions of
the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the
Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the
Contractor's subcontractor may be liable, regardless of whether or not such claim, damage,
loss or expense is caused in part by a party indemnified hereunder.
Page 2 of 4
~"
10. Unless otherwise specified in the Contract Documents, prior to the commencement of any work
on the Project and at all times during the performance of this Contract, the Contractor shall
provide evidence of insurance which meets the requirements of the City's Insurance Schedule
for Artisan Contractors or General Contractors.
THE CITY AGREES:
Upon the completion of the Contract, and the acceptance of the Project by the City Manager,
the City agrees to pay the Contractor as full compensation for the complete performance
of this Contract, the amount determined for the total number of units completed at the unit prices
stated in the Contractor's Proposal and less any liquidated damages provided for in the Contract
Documents. The number of units stated in the contract, special conditions and contractors
proposal is approximate only and the final payment shall be made by the work covered by the
Contract.
CONTRACT ESTIMATED AMOUNT $ 19,557.80
THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF 15 % OF THE ABOVE
LISTED ESTIMATED AMOUNT.
CITY OF DUBUQUE, IOWA
Michatsl C. Van Milligen ate
City Manager
PRINCIPAL:
Horsfield Construction Inc.
Contractor
By' t2-2.2 -~
Signature Date
MgTT'HE~ t-=1
Printed Name
Vl C-G- P~2.>/s~ ;D EST
Title
ACKNOWLEDGEMENT OF ATTACHED
SPECIAL CONDI O
By' 12 T z ~ot.~
Signature Date
IM ~4TT1-FE~r.L 1-1 ofLSl=1 ELA
Printed Name
V 1 CE 'PS2ES~ ~E~.ST
Title
Page 3 of 4
The following special conditions shall apply to this Project:
1.) The City agrees to provide and coordinate required traffic control on Middle Road during
construction.
2.) The City agrees to reimburse the contractor for any erosion stabilization measures
requested by the City, that are not included in the Dubuque Industrial Center West 3rd Addition
Contract B project documents.
REV. 12.1 /06