TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Final Approval of Plans and Specifications for Dubuque Intermodal
Transportation Center
DATE: March 10, 2014
Parking Division Manager Tim Horsfield recommends City Council final approval of the
plans, specifications and estimated cost of $14,835,000, which is $1,521,655 higher
than the previous estimate of Phase 1 of the Dubuque Intermodal Transportation Center
Project.
The City of Dubuque was awarded an $8,000,000 State of Good Repair grant to be
used for an Intermodal Center adjacent to the Historic Millwork District. The Intermodal
Center has three components; parking, terminal and bus storage. The parking and the
terminal are the main priorities for the grant funds with any remaining funds for the bus
storage facility. Based on the parking needs for the Historic Millwork District and the
terminal portion of the Intermodal facility the City had planned to utilize 75% of the
$8,000,000 State of Good Repair funding for the Intermodal Center and shift the
remaining funds to the Bus Storage and Maintenance Facility, which is the second
phase of the project. If the remaining State of Good Repair funds are not shifted to the
Bus Storage and Maintenance Facility after the Intermodal is constructed, the funds will
be recaptured by the FTA and reallocated to other projects.
The Intermodal Center is designed to improve access to transportation services in and
around the City of Dubuque, as it will provide a center at which all modes of
transportation will be accessed including: pedestrian, bicycle, Park -n -Ride, intercity
buses (Burlington -Trailways and Lamers), taxis, hotel shuttles, and area public transit
service (The Jule and the Regional Transit Authority or "RTA"). The parking ramp
component, 3 levels - 92 transit dependent and 200 non -transit dependent spaces, will
provide parking for users of public transit, staff based in the intermodal center and the
general public. The facility will also provide bicycle storage to support commuter travel
or recreational use. The approved feasibility study by Federal Transit Authority (FTA)
accommodates all improvements listed above with the City contributing $ 6,526,545 in
local funds toward the 200 general public parking and FTA State of Good Repair Grant
contributing $6,263,105 million to complete the project. There is also an IDOT Intercity
Bus Grant in the amount of $199,916 for the project.
Over the past 12-16 months the design of the facility has been reviewed by the Federal
Transportation Administration, State Historic Preservation Officials, and local review
boards and has met approval from all of the reviewing bodies. The City has also
conducted value engineering in which some non -architectural components of the facility
were adjusted or eliminated in order to work within budget guidelines without
compromising the efficiency or operability of the facility.
On December 2, 2013, a presentation was made to the City Council providing budget
information and an engineer's estimates of cost available at that time. This was
presented when the design documents were in the construction document phase and
were at 60% completion. At the current time, all of the cost estimates are based on
90% construction document completion.
There are two main reasons for the $1,521,655 increase in projected costs. First of all,
having come closer to finalizing all of the plans and specifications, design adjustments
were made, specific materials and quantities were better established along with
anticipated market cost for materials, caused a projected increase of $1,161,850. In
addition to this cost, it was decided that the contingency for the project needed to be
increased from $500,000 to 10% of the estimated project cost due in large part to the
project site. This represents an increase of $709,805 in contingency. Also there is an
adjustment in the Architect/Engineering cost, this is an adjustment from estimated to
actual cost per contract.
The estimated project costs have increased a total of $1,521,655. Of this amount, The
Federal Transportation Administration share will be $232,759 (92 spaces) and the City's
portion will be $1,288,896 (200 spaces). Regarding the City's additional responsibility,
Budget Director Jennifer Larson indicates that there is sufficient capacity in the Greater
Downtown Urban Renewal District TIF to cover the cost.
Phase III of this project will be the construction of the Bus Storage and Maintenance
Facility. This project is not schedule to begin design until all budgetary items are
established on the intermodal project. At the current time, there is an estimated budget
shortfall in that project of $626,000.
In the near future, staff will be recommending the construction of an additional parking
lot just to the north of the transit center on the east side of Elm Street. The current
engineer's estimate on that project is $550,000 with that funding being part the Historic
Millwork District Parking CIP which is separate from the funding source for the
intermodal center.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
2
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Tim Horsfield, Parking Division Manager
3
THE CITY OF
DUB
Masterpiece on the Mississippi
Dubuque
kiAtZidi
AO -America City
1111 r
2007 - 2012 - 2013
March 7, 2014
To: Michael C. Van Milligen, City Manager
From: Tim Horsfield, Parking Division Manager
Parking Division
830 Bluff Street
Dubuque, IA 52001
563-589.4267
www. cityofdubuque. org/parking
Subject: Final Approval Plans and Specifications for Dubuque Intermodal Transportation
Center
Background
The City of Dubuque was awarded an $8,000,000 State of Good Repair (SGR) grant to be
used for an Intermodal Center adjacent to the Historic Millwork District. The Intermodal
Center has three components; parking, terminal and bus storage. The parking and the
terminal are the main priorities for the grant funds with any remaining funds for the bus
storage facility. Based on the parking needs for the Historic Millwork District and the terminal
portion of the Intermodal facility the City had planned to utilize 75% of the $8,000,000 SGR
funding for the Intermodal Center and shift the remaining funds to the Bus Storage and
Maintenance Facility (BSMF), which is the second phase of the project. If the remaining SGR
funds are not shifted to the BSMF after the Intermodal is constructed, the funds will be
recaptured by the FTA and reallocated to other projects.
The Intermodal Center is designed to improve access to transportation services in and
around the City of Dubuque, as it will provide a center at which all modes of transportation
will be accessed including: pedestrian, bicycle, Park -n -Ride, intercity buses (Burlington -
Trailways and Lamers), taxis, hotel shuttles, and area public transit service (The Jule and the
Regional Transit Authority or "RTA"). The parking ramp component, 3 levels - 92 transit
dependent and 200 non -transit dependent spaces, will provide parking for users of public
transit, staff based in the intermodal center and the general public. The facility will also
provide bicycle storage to support commuter travel or recreational use. The approved
feasibility study by Federal Transit Authority (FTA) accommodates all improvements listed
above with the City contributing $ 6,526,545 in local funds toward the 200 general public
parking and FTA State of Good Repair Grant contributing $6,263,105 million to complete the
project. There is also an IDOT Intercity Bus Grant in the amount of $199,916 for the project.
1
Discussion
Following the site selection process, architectural firm Neumann Monson from Iowa City/Des
Moines was awarded the design of the intermodal facility. Over the past 12-16 months the
design of the facility has been reviewed by the Federal Transportation Administration, State
Historic Preservation Officials, and local review boards and has met approval from all of the
reviewing bodies. We have also been through sessions of value engineering in which some
non -architectural components of the facility have be adjusted or eliminated in order to work
within budget guidelines without compromising the efficiency or operability of the facility. The
value engineering is also a required process by FTA.
On December 2, 2013, a presentation was made to the City Council providing budget
information and an engineer's estimates of cost available at that time. This was presented
when the design documents were in the construction document phase and were at 60%
completion. At the current time, all of the cost estimates are based on 90% construction
document completion. Below, you will find a table that indicates the differences between cost
estimates at 60% (December 2, 2013) and this meeting.
The table below shows the Intermodal Center modified budget that was approved by City
Council on December 2, 2013 as compared to the modified budget being recommended at
the March 3, 2014 City Council Meeting.
Project Cost
Modified Budget
Approved
(12/2/13 & 2/3/14)
Modified Budget
Recommendation
(3/3/14)
Difference
Terminal
$4,645,188
$4,725,550
$ 80,362
Parking Facility
$6,291,012
$7,372,500
$1,081,488
Contingency
$ 500,000
$1,209,805
$ 709,805
Architect/Engineering
$1,132,894
$ 782,894
$ (350,000)
Property Acquisition*
$ 495,000
$ 495,000
$ -
Construction Admin
$ 125,000
$ 125,000
$ -
ECIA — Admin Cost
$ 65,000
$ 65,000
$ -
City - Admin Cost
$ 60,000
$ 60,000
$ -
Total
$13,314,094
$14,835,749
$ 1,521,655
*The property acquisition budget was approved at the February 3, 2014 City Council meeting.
The table below shows how the increased budget will be funded.
Funding
Difference
FTA
$ 232,759
City GDTIF
$1,288,896
Total
$1,521,655
2
There are two main reasons for the increase. First of all, having come closer to finalizing all
of the plans and specifications, design adjustments were made, specific materials and
quantities were better established along with anticipated market cost for materials, caused a
projected increase of $1,161,850. In addition to this cost, it was decided that the contingency
for the project needed to be increased from $500,000 to 10% of the estimated project cost
due in large to the project site. This represents an increase of $709,805 in contingency. Also
on the table, you will notice an adjustment in the Architect/Engineering cost, this is an
adjustment from estimated to actual cost per contract.
So, as the table represents, our estimated project costs have increased a total of $1,521,655.
Of this amount, The Federal Transportation Administration share will be $232,759 (92
spaces) and the City's portion will be $1,288,896 (200 spaces). Regarding the City's
additional responsibility, Budget Director Jennifer Larson indicates that there is sufficient
capacity in the Greater Downtown Urban Renewal District TIF to cover the cost.
Phase III of this project will be the construction of the Bus Storage and Maintenance Facility.
This project is not schedule to begin design until all budgetary items are established on the
intermodal project. At the current time, there is an estimated budget shortfall in that project of
$626,000.
In the near future, we will be bringing to you for your approval, the construction of an
additional parking lot just to the north of the transit center on the east side of Elm Street. The
current engineer's estimate on that project is $550,000 with that funding being part the
Historic Millwork District Parking CIP which is separate from the funding source for the
intermodal center.
Modified Budget Impact
City of Dubuque Funding $ 7,815,441
Federal Department of Transportation
Grant # IA -04-0124-00 $ 6,325,392
IDOT Intercity Bus Grant $ 199,916
Historic Millwork Parking CIP $ 495,000
Total: $ 14,835,749
This funding projection is based off of the current architects and engineers cost estimate.
3
Project Schedule
March 3, 2014
March 7, 2014
March 7, 2014
March 17, 2014
March 25, 2014
April 8, 2014
April 21, 2014
Completion Date
Initiate Bidding Process/Set Public Hearing
Publish Notice to Bidders, Advertise for Bids
Publish Public Hearing on Plans and Specs
Public Hearing on Plans and Specifications
Pre -Bid Meeting
Receipt of Bids (Bid Letting)
Award of Bid by City Council
365 Calendar Days from Notice to Proceed
Recommendation
I recommend that the City Council give final approval to the construction plans and
specifications for the Dubuque Intermodal Transportation Center.
4
RESOLUTION NO. 94-14
APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND
ESTIMATED COST FOR DUBUQUE INTERMODAL TRANSPORTATION CENTER
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That the proposed plans, specifications, and form of contract now on file in the Office
of the City Clerk and the estimated cost for the Dubuque Intermodal Transportation
Center in the estimated amount, $14,430,944 is hereby approved.
Passed, adopted and approved thisl7th day of March, 2014.
Roy D. Buol, Mayor
Attest:
F:\USERS\Parking Division\Iowa & Locust Parking Ramp Repair Project\Resolution Adopting Plans and Specifications Iowa Locust Ramps Repair
Project.docx
THE CITY OF
DUB
Masterpiece on the Mississippi
Dubuque
bfril
All -America City
11
1'
2007 • 2012 • 2013
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Initiate Bidding for the Dubuque Intermodal Transportation Center
DATE: February 20, 2014
Parking System Supervisor Tim Horsfield is recommending approval of the plans,
specifications and estimated cost of $14,835,000, which is $1,521,655 higher than the
previous estimate, of Phase 1 of the Dubuque Intermodal Transportation Center
project, authorize advertisement of bids and set a public hearing for March 17, 2014.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Pirti
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Maurice Jones, Economic Development Director
Tim Horsfield, Parking Division Manager
THE CITY OF
Dui
Masterpiece on the Mississippi 2007.2012 2013
Dubuque
kinarld
All -America City
'1111'
Parking Division
830 Bluff Street
Dubuque, IA 52001
563-589.4267
www.cityofdubuque.org/parking
February 26, 2014
To: Michael C. Van Milligen, City Manager
From: Tim Horsfield, Parking Division Manager
Subject: Initiate Bidding for the Dubuque Intermodal Transportation Center
Background
The City of Dubuque was awarded an $8,000,000 State of Good Repair (SGR) grant to be
used for an Intermodal Center adjacent to the Historic Millwork District. The Intermodal
Center has three components; parking, terminal and bus storage. The parking and the
terminal are the main priorities for the grant funds with any remaining funds for the bus
storage facility. Based on the parking needs for the Historic Millwork District and the terminal
portion of the Intermodal facility the City had planned to utilize 75% of the $8,000,000 SGR
funding for the Intermodal Center and shift the remaining funds to the Bus Storage and
Maintenance Facility (BSMF), which is the second phase of the project. If the remaining SGR
funds are not shifted to the BSMF after the Intermodal is constructed, the funds will be
recaptured by the FTA and reallocated to other projects.
The Intermodal Center is designed to improve access to transportation services in and
around the City of Dubuque, as it will provide a center at which all modes of transportation
will be accessed including: pedestrian, bicycle, Park -n -Ride, intercity buses (Burlington -
Trailways and Lamers), taxis, hotel shuttles, and area public transit service (The Jule and the
Regional Transit Authority or "RTA"). The parking ramp component, 3 levels - 92 transit
dependent and 200 non -transit dependent spaces, will provide parking for users of public
transit, staff based in the intermodal center and the general public. The facility will also
provide bicycle storage to support commuter travel or recreational use. The approved
feasibility study by Federal Transit Authority (FTA) accommodates all improvements listed
above with the City contributing $ 6,526,545 in local funds toward the 200 general public
parking and FTA State of Good Repair Grant contributing $6,263,105 million to complete the
project. There is also an IDOT Intercity Bus Grant in the amount of $199,916 for the project.
1
Discussion
Following the site selection process, architectural firm Neumann Monson from Iowa CitylDes
Moines was awarded the design of the intermodal facility. Over the past 12-16 months the
design of the facility has been reviewed by the Federal Transportation Administration, State
Historic Preservation Officials, and local review boards and has met approval from all of the
reviewing bodies. We have also been through sessions of value engineering in which some
non -architectural components of the facility have be adjusted or eliminated in order to work
within budget guidelines without compromising the efficiency or operability of the facility. The
value engineering is also a required process by FTA.
On December 2, 2013, a presentation was made to the City Council providing budget
information and an engineer's estimates of cost available at that time. This was presented
when the design documents were in the construction document phase and were at 60%
completion. At the current time, all of the cost estimates are based on 90% construction
document completion. Below, you will find a table that indicates the differences between cost
estimates at 60% (December 2, 2013) and this meeting.
The table below shows the Intermodal Center modified budget that was approved by City
Council on December 2, 2013 as compared to the modified budget being recommended at
the March 3, 2014 City Council Meeting.
Project Cost
Modified Budget
Approved
(12/2/13 & 2/3/14)
Modified Budget
Recommendation
(3/3/14)
Difference
Terminal
$4,645,188
$4,725,550
$ 80,362
Parking Facility
$6,291,012
$7,372,500
$1,081,488
Contingency
$ 500,000
$1,209,805
$ 709,805
Architect/Engineering
$1,132,894
$ 782,894
$ (350,000)
Property Acquisition*
$ 495,000
$ 495,000
$ -
Construction Admin
$ 125,000
$ 125,000
$ -
ECIA — Admin Cost
$ 65,000
$ 65,000
$ -
City - Admin Cost
$ 60,000
$ 60,000
$ -
Total
$13,314,094
$14,835,749
$ 1,521,655
*The property acquisition budget was approved at the February 3, 2014 City Council meeting.
The table below shows how the increased budget will be funded.
Funding
Difference
FTA
$ 232,759
City GDTIF
$1,288,896
Total
$1,521,655
2
There are two main reasons for the increase. First of all, having come closer to finalizing all
of the plans and specifications, design adjustments were made, specific materials and
quantities were better established along with anticipated market cost for materials, caused a
projected increase of $1,161,850. In addition to this cost, it was decided that the contingency
for the project needed to be increased from $500,000 to 10% of the estimated project cost
due in large to the project site. This represents an increase of $709,805 in contingency. Also
on the table, you will notice an adjustment in the Architect/Engineering cost, this is an
adjustment from estimated to actual cost per contract.
So, as the table represents, our estimated project costs have increased a total of $1,521,655.
Of this amount, The Federal Transportation Administration share will be $232,759 (92
spaces) and the City's portion will be $1,288,896 (200 spaces). Regarding the City's
additional responsibility, Budget Director Jennifer Larson indicates that there is sufficient
capacity in the Greater Downtown Urban Renewal District TIF to cover the cost.
Phase III of this project will be the construction of the Bus Storage and Maintenance Facility.
This project is not schedule to begin design until all budgetary items are established on the
intermodal project. At the current time, there is an estimated budget shortfall in that project of
$626,000.
In the near future, we will be bringing to you for your approval, the construction of an
additional parking lot just to the north of the transit center on the east side of Elm Street. The
current engineer's estimate on that project is $550,000 with that funding being part the
Historic Millwork District Parking CIP which is separate from the funding source for the
intermodal center.
Modified Budget Impact
City of Dubuque Funding $ 7,815,441
Federal Department of Transportation
Grant # IA -04-0124-00 $ 6,325,392
IDOT Intercity Bus Grant $ 199,916
Historic Millwork Parking CIP $ 495,000
Total: $ 14,835,749
This funding projection is based off of the current architects and engineers cost estimate.
3
Project Schedule
March 3, 2014
March 7, 2014
March 7, 2014
March 17, 2014
March 25, 2014
April 8, 2014
April 21, 2014
Completion Date
Initiate Bidding Process/Set Public Hearing
Publish Notice to Bidders, Advertise for Bids
Publish Public Hearing on Plans and Specs
Public Hearing on Plans and Specifications
Pre -Bid Meeting
Receipt of Bids (Bid Letting)
Award of Bid by City Council
365 Calendar Days from Notice to Proceed
Recommendation
I recommend that the City Council give preliminary approval to the construction plans and
specifications and establish March 17th as the date of public hearing and hereby authorize the
City Clerk to advertise for bid proposals for the project.
4
a regional response to local needs
February 21, 2014
Memo EC
TO:
FROM: Chandra Ravada, Transportation Director, ECIA
CC:
Michael Van Milligen, City Manager
Maurice Jones, Economic Development Director
Kelley Deutmeyer, Executive Director, ECIA
Teri Goodmann, Assistant City Manager
Tim Horsfield, Parking Division Manager
Jenny Larson, Finance Director
Candace Eudaley, Jule Transit Manager
SUBJECT: Dubuque Intermodal Center Budget Update
PURPOSE
To provide an update on the budget for the Dubuque Intermodal Center, potential savings options based on
Value Engineering options, and the estimated remaning funds for the Bus Storage and Maintenance Facility
based on estimates provided by Neumann Munson Architects (NMA) for the Dubuque Intermodal Center.
BACKGROUND
The City of Dubuque was awarded an $8,000,000 State of Good Repair (SGR) grant to be used for an
Intermodal Center adjacent to the Historic Millwork District. The Intermodal Center has three components;
parking, terminal and bus storage. The parking and the terminal are the main priorities for the grant funds with
any remaining funds for the bus storage facility. Based on the parking needs for the Historic Millwork District
and the terminal portion of the Intermodal facility the City had planned to utilize 75% of the $8,000,000 SGR
funding for the Intermodal Center and shift the remaining funds to the Bus Storage and Maintenance Facility
(BSMF), which is the second phase of the project. If the remaining SGR funds are not shifted to the BSMF
after the Intermodal is constructed, the funds will be recaptured by the FTA and reallocated to other projects.
The Intermodal Center is designed to improve access to transportation services in and around the City of
Dubuque, as it will provide a center at which all modes of transportation will be accessed including: pedestrian,
bicycle, park'n'ride, intercity buses (Burlington -Trailways and Lamers), taxis, hotel shuttles, and area public
transit service (The Jule and the Regional Transit Authority or "RTA"). The parking ramp component, 3 levels -
92 transit dependent and 200 non -transit dependent spaces, will provide parking for users of public transit, staff
based in the intermodal center and the general public. The facility will also provide bicycle storage to support
1 Dubuque Metropolitan Area Transportation Study 1 Eastern Iowa Development Corporation 1
1 Eastern Iowa Regional Utility Services System 1 Eastern Iowa Regional Housing Authority 1 ECIA Business Growth, Inc.
1 Region 1 Employment and Training 1 ECIA Regional Planning Affiliation 1 Region 8 Regional Transit Authority 1
1 7600 Commerce Park, Dubuque, IA 52002 1 www.ecia.org 1 ecia@ecia.org 1
1 563.556.4166 1 Iowa only: 800.942.4648 1 Relay Iowa 800.735.2943 1 f: 563.556.0348 1
commuter travel or recreational use. The approved feasibility study by Federal Transit Authority (FTA)
accommodates all improvements listed above with the City contributing $ 652 million in local funds toward the
200 general public parking and and FTA State of Good Repair Grant contributing $5.69 million to complete the
project.
The second portion of the project, the BSMF will provide housing for The Jule's brand-new fleet of clean diesel
buses that were purchased with federal and state grant funds during 2011-2012, as well as reduce long term
maintenance costs by replacing the existing 100 year old facility. The BSMF will also provide options for future
expansion; reduce deadhead travel and potential delays of the service. The BSMF will be located on the
Intermodal Campus at the site of the old City garage and will compliment the services provided at the
Intermodal Center. The City hired IIW and Conlan Construction to develop a plan to construct the BSMF in
multiple phases using any left over funding from the SGR grant. The City programed $ 433,307 in FY 14 and
$939,206 in FY 15 for local match to the BSMF and Intermodal Center project. The BSMF remains a priority
for the FTA in Kansas City.
DISCUSSION
As part of final design process, The City conducted two Value Engineering (VE) studies to reduce the cost of
Dubuque Intermodal Center and Neumann Manson Architects (NMA) provided 90% Construction Drawing
(CD) cost estimates. However, the 90% CD cost estimates
increased from VE estimates as the estimators informed
NMA that the project costs have been climbing at a more
escalated rate than previously anticipated. The costs 90%
CD cost also increased due to change in scope.
The proposed location of the Intermodal Facility will be on
a portion of properties that are currently owned by the State
of Iowa. The City initiated discussions with the Iowa DOT
regarding the disposal of the excess State of Iowa property.
The Iowa DOT acknowledged they had no remaining
interest in said property and agreed to dispose of said public
property as permitted by Iowa Code. The three (3) State of
Iowa properties that are impacted by the Intermodal
Transportation Center project are identified as Parcel 254
(former Jacobson Steel), Parcel 293 (former Interstate
Power) and Parcel 293A (former Pine Street, City of
Dubuque).
The following is a summary of the three (3) State of Iowa
properties and the associated Offer to Buy amounts which
are based on the appraised valuation:
Parcel Summary
Offered Purchase Price
Parcel 254 (former Jacobson Steel)
$400,000
Parcel 293 (former Interstate Power)
$70,000
Parcel 293A (former Pine Street, City of Dubuque)
$25,000
Total Acquisition Cost
$495,000
Dubuque Intermodal Transportation Center
Initially, the Intermodal Transportation Center budget included $100,000 for property acquisition based on the
assumption that the State would dispose of the property at a reduced cost due to the "Transportation" purpose of
the intermodal facility. However, based on a ruling by the Office of the Attorney General, since the property is
not for a highway or bridge project, the dispose of said public property would need to follow the process per
Iowa Code.
Feasibility Study Budget
The original 25% Design Drawing opinion of probable cost was done in December of 2011 as part 1 of our
NMA scope. NMA used the RS Means (RS Means is a trusted name in construction costs for more than 70
years, RS Means offers annually updated construction cost information available in convenient online,
eBook, book, or CD format — it is one of the construction industry's most dependable cost estimating solutions)
to gauge the cost of escalation and used this criteria (and added a 2% inflation rate) to establish the project
budget estimate to the FTA in the Spring of 2013.
Table 1 below provides the original budget submitted to FTA in the Spring of 2013. This budget estimated a
savings of $2.18 million in FTA funds that could be transferred to Bus Storage and Maintenance Facility.
However, these changes in costs add $117,006 in local funds to the Dubuque Intermodal Facility. The City will
pay $495,000 for Property Acquisition through Historic Millwork Parking Improvements funds.
Table 1: Budget for Intermodal Center (Feasibility Study)
Terminal
Contingency (10%)
Parking Facility
Contingency (10%)
Consultant - Architect / Engineering Services
Consultant - Construction Admin Services
ECIA - Administrative Cost
City - Administrative Cost
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
Summary:
FTA Grant
Iowa DOT Intercity Bus Grant
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements
$ 4,459,078
$ 445,907.8
$ 5,891,100
$ 589,110.0
$ 1,132,894
$ 75,000
$ 65,000
$ 60,000
SUBTOTAL: $ 12,718,090
$ 495,000
$ 550,000
TOTAL: $ 13,763,090
$ 5,814,623
$ 199,916
$ 6,526,545
$ 1,045,000
FUNDING TOTAL: $
13,586,084
SHORTFALL: $
177,006
Budget Scenarios for Dubuque Intermodal Transportation Center
Page 3
Feasibility Study + Additional Scope Bucket
During the design process of the BSMF changes were made to the design to accommodate the needs of green
space next to the parking structure. There were also changes in cost due to the foundation and an escalation of
construction costs since the projects construction date moved from Fall 2013 to Spring 2014.
The list below provides the changes and costs associated with them:
• Adding restrooms in the parking ramp to accommodate the usage of green spaces + $61,500.
• The cost of foundations and structural slab based on the soils testing + $300,000.
• 2.5% Escalation Fall 2013 bid (per last estimate) to spring 2014 + $270,000.
Overall the changes increase the cost of project by $784,462. Table 2 below provides the budget submitted to
FTA + additional scope. This budget provides a savings of $1.89 million in FTA funds that could be transferred
to the Bus Storage and Maintenance Facility. However, these changes in costs add $705, 910 in local funds to
the Dubuque Intermodal Facility. The City will pay $495,000 for Property Acquisition through Historic
Millwork Parking Improvements funds. The City will pay $495,000 for Property Acquisition through Historic
Millwork Parking Improvements funds.
Table 2: Budget for Intermodal Center (Feasbility Study+ additional scope)
Terminal
Contingency (10%) $ 462,479.0
Parking Facility
Contingency (10%) $ 644,188.8
Consultant - Architect / Engineering Services $ 1,161,814
Consultant - Construction Admin Services $ 75,000
ECIA - Administrative Cost $ 65,000
City - Administrative Cost $ 60,000
SUBTOTAL: $ 13,535,160
$ 4,624,790
$ 6,441,888
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
$
495,000
550,000
TOTAL: $ 14,580,160
Su mm arv:
FTA Grant $ 6,102,789
Iowa DOT Intercity Bus Grant $ 199,916
City Funds - Intermodal Facility CIP 71111Trirr
Historic Millwork Parking Improvements $ 1,045,000
FUNDING TOTAL: $ 13,874,250
SHORTFALL: $ 705,910
100% Desijin Drawinji (DD) Bucket
In mid-October NMA issued a 100% DD pricing set and received the opinion of probable cost from their
estimators for the Intermodal Center. The estimators informed NMA that the project costs have been climbing
Budget Scenarios for Dubuque Intermodal Transportation Center Page 4
at a more escalated rate than previously anticipated which has now increased the Intermodal Center by $1.04
million from the Feasibility Study + Additional Scope Budget.
Table 3 below provides the budget for 100% DD. This budget provides a savings of $954,114 million in SGR
funds that can be transferred to the Bus Storage and Maintenance Facility but causes a shortfall of $1,097,647
that would have to come from local funds to complete the Dubuque Intermodal Center. The City will pay
$495,000 for Property Acquisition through Historic Millwork Parking Improvements funds.
Table 3: Budget for Intermodal Center (100% Design Drawing Budget)
Terminal
Contingency (10%) $ 565,518.8
Parking Facility
Contingency (10%) $ 660,581.2
Consultant - Architect / Engineering Services $ 1,132,894
Consultant - Construction Admin Services $ 125,000
ECIA - Administrative Cost $ 65,000
City - Administrative Cost $ 60,000
SUBTOTAL: $ 14,869,994
$ 5,655,188
$ 6,605,812
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
$ 495,000
$ 550,000
TOTAL: $ 15,914,994
Su mm ary:
FTA Grant $ 7,045,886
Iowa DOT Intercity Bus Grant $ 199,916
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements $ 1,045,000
$ 6,526,545
FUNDING TOTAL: $ 14,817,347
SHORTFALL: $ 1,097,647
First Round VE Modifications Bucket
City Staff and NMA staff worked together to reduce costs to get them closer to the original costs estimates
submitted to the FTA for the project. The following are the list of line items that are discussed as part of first
round of value engineering:
Delete the Public Restrooms in the Parking Ramp ($61,500).
• Using perforated steel in lieu of glass at the north walkway saves ($113,000).
• Eliminating the roof at the bridge, reducing the width to 6'-8" and using perforated steel guardrails,
saves ($292,000).
• Redesigning the terminal saves ($880,000).
Budget Scenarios for Dubuque Intermodal Transportation Center Page 5
Table 4 below provides the budget for first round VE modifications. This budget provides a savings of $2.04
million in FTA funds that could be transferred to Bus Storage and Maintenance facility but the city needs to add
$670,076 in local funds to complete the Dubuque Intermodal Center. The City will pay $495,000 for Property
Acquisition through Historic Millwork Parking Improvements funds.
Table 4: Budget for Intermodal Center (First Round VE Modifications Budget)
Terminal
Contingency (10%) $ 448,318.8
Parking Facility
Contingency (10%) $ 639,951.2
Consultant - Architect / Engineering Services $ 1,132,894
Consultant - Construction Admin Services $ 125,000
ECIA - Administrative Cost $ 65,000
City - Administrative Cost $ 60,000
SUBTOTAL: $ 13,353,864
$ 4,483,188
$ 6,399,512
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
$ 495,000
$ 550,000
TOTAL: $ 14,398,864
Summary:
FTA Grant $ 5,957,327
Iowa DOT Intercity Bus Grant $ 199,916
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements
$ 1,045,000
FUNDING TOTAL: $ 13,728,788
SHORTFALL: $ 670,076
Second Round VE Modifications Budget
The City staff and NMA staff continue to look for cost savings measures and came up with more reductions in
addition to the first set of Value Engineering (VE) to reduce the costs and get them more in line with the
original esitmates submitted to the FTA.
The following is a list of line items that were discussed as part of the second round of value engineering in
addition to first round of value engineering:
• Reduce the terracotta 25% we could save ($130,000).
• IPE cladding at lower portion of terminal ($50,000).
• Further reduce height at one story mass ofterminal - by one foot ($10,000).
Table 5 below provides the budget for second round VE modifications in addition to first round VE
modifications. This budget provides a savings of $2.08 million in FTA funds that could be transferred to the
Bus Storage and Maintenance Facility but the City needs to add $563,119 in local funds to complete the
Budget Scenarios for Dubuque Intermodal Transportation Center Page 6
Dubuque Intermodal Center. The City will pay $495,000 for Property Acquisition through Historic Millwork
Parking Improvements funds.
Table 5: Budget for Intermodal Center (Second Round VE Modifications Budget)
Terminal
Contingency (10%)
Parking Facility
Contingency (10%)
Consultant - Architect 1 Engineering Services
Consultant - Construction Admin Services
ECIA - Administrative Cost
City - Administrative Cost
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
$ 4,483,188
$ 448,318.8
$ 6,269,512
$ 626,951.2
$ 1,132, 894
$ 125,000
S 65,000
$ 60,000
SUBTOTAL: $ 13,210,864
495,000
550,000
TOTAL: $ 14,255,864
Summary:
FTA Grant $ 5,921,284
Iowa DOT Intercity Bus Grant $ 199,916
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements
$ 6,526,545
$ 1,045,000
FUNDING TOTAL: $ 13,692,745
SHORTFALL: $ 563,119
VE Items After City Meeting
The City staff and NMA presented VE 1 and VE 2 options and savings to City management. City management
excluded some of the options including: deleting the public restrooms in the parking ramp and eliminating the
roof at the bridge and added options including: removing the east elevator shaft and modifying the stair towers
and using precast planks with a topping slab.
The following are the list of line items that are under consideration and are left for future discussion after the
meeting with City management:
• Using perforated steel in lieu of glass at the north walkway saves ($113,000).
• Redesigning the terminal saves ($880,000).
• Reduce the terracotta 25% we could save ($130,000).
• IPE cladding at lower portion of terminal ($50,000).
• Further reduce height at one story mass ofterminal - by one foot ($10,000).
• Removing the east elevator shaft and modifying the stair towers ($170,000).
• Using precast planks with a topping slab ($30,000).
• Change terra-cotta on the south to perforated metal panels - Deduct $60,000.
Budget Scenarios for Dubuque Intermodal Transportation Center Page 7
• Change glass on the north to perforated metal panels — Deduct $39,000.
• Taking the second floor off the terminal facility. This is not recommended because it changes the
elevation of the structure and will necessitate reopening the feasibility study and resubmitting to SHPO
for them to reopen their process. This could cause at least a 90 day delay in the project.
Table 6 below provides the budget after meeting with City management. This budget provides a savings of $1.9
million in FTA funds that could be transferred to Bus Storage and Maintenance Facility but the city needs to
add $616,448 in local funds to complete Dubuque Intermodal Center. The City will pay $495,000 for Property
Acquisition through Historic Millwork Parking Improvements funds.
Table 6: Bud2et for Intermodal Facility (VE items after City meeting)
Terminal
Contingency (10%)
Parking Facility
Contingency (10%)
Consultant - Architect / Engineering Services
Consultant - Construction Admin Services
ECIA - Administrative Cost
City - Administrative Cost
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
Summary:
FTA Grant
Iowa DOT Intercity Bus Grant
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements
$ 4,645,188
$ 464,518.8
$ 6,291,012
$ 629,101.2
$ 1,132,894
$ 125,000
$ 65,000
$ 60,000
SUBTOTAL: $ 13,412,714
$ 495,000
$ 550,000
TOTAL: $ 14,457,714
$ 6,069,805
$ 199,916
$ 6,526,545
$ 1,045,000
FUNDING TOTAL: $
13,841,266
SHORTFALL: $
616,448
90% Construction Drawinji (CD) Bud2et
First week of February 2014 NMA issued a 90% CD pricing set and received the opinion of probable cost from
their estimators for the Intermodal Center. The estimators informed NMA that the project costs have been
climbing at a more escalated rate than previously anticipated which has now increased the Intermodal Center
Budget when compared to Value Engineering.
The following are the list of line items that contributed to the cost increase:
• The overall foundations/structural slab designs for the 90% drawings have increased the costs for the
parking structure. The final steel reinforcing design increased from DD to 90%. It should also be noted
that the poor soils are contributing to approx. $450,000 in deep foundations and/or structure slab costs.
Budget Scenarios for Dubuque Intermodal Transportation Center Page 8
• The stair towers have increased to account for the additional reinforcing for the soils classification for
this site.
• The curtain wall unit costs we believe to be a little higher than our experience would indicate however
this is the conservative opinion of the pricing consultant.
• There has also been an increase in costs for the additional camera locations.
• There has also been an increase in costs for the additional access control points for the doors.
• There has also been an increase in costs for the additional security intrusion system.
• The construction contingency has been increased from 500,000 to 1,300,000 (roughly 10%) of the
project cost.
Table 7 below provides the budget after meeting with City management. This budget provides a savings of
$1.67 million in FTA funds that could be transferred to Bus Storage and Maintenance Facility and $1.29 million
deficit in local funds for the City. The City will pay $495,000 for Property Acquisition through Historic
Millwork Parking Improvements Funds.
Table 7: Budget for Intermodal Facility (90% CD)
Terminal
Contingency (10%)
Parking Facility
Contingency (10%)
Consultant - Architect / Engineering Services
Consultant - Construction Admin Services
ECIA - Administrative Cost
City - Administrative Cost
Iowa DOT Property Acquisition
Terminal Parking Lot "Estimate"
Summary:
FTA Grant
Iowa DOT Intercity Bus Grant
City Funds - Intermodal Facility CIP
Historic Millwork Parking Improvements
$ 4,725,550
$ 472,555.0
$ 7,372,500
$ 737,250.0
$ 782,894
$ 125,000
$ 65,000
$ 60,000
SUBTOTAL: $ 14,340,749
$ 495,000
$ 550,000
TOTAL: $ 15,385,749
$ 6,325,392
$ 199,916
$ 6,526,545
$ 1,045,000
FUNDING TOTAL: $ 14,096,853
SHORTFALL: $ 1,288,896
Budget Scenarios for Dubuque Intermodal Transportation Center
Page 9
CONCLUSION
The design team wants to provide the City information on change in costs of DITC and reasons for change.
Overall the City will be short $1.29 million for DITC and $627,300 short for the Bus Storage Facility. Staff is
advising not to use DMATS funds to fill $1.29 million short fall for DITC. Using DMATS funds will make the
200 parking spaces come under FTA regulations and will have impact on usage that the city is planning for. The
$627,300 shortfall for Bus Storage Facility can be covered by DMATS funds as the project is 100% FTA
proj ect.
The other major change in the budget is the funding for property acquisition. Initially, the Intermodal
Transportation Center budget included $100,000 for property acquisition based on the assumption that the State
would dispose of the property at a reduced cost due to the "Transportation" purpose of the intermodal facility.
However, based on a ruling by the Office of the Attorney General, since the property is not for a highway or
bridge project, the dispose of said public property would need to follow the process per Iowa Code and City
need to pay $495,000 based on the appraised evaluations.
Please see attached final design images from Newman Munson Architects.
Thank you for your consideration.
Budget Scenarios for Dubuque Intermodal Transportation Center Page 10
HCSNOA Fal V r] 02 0
SildIAIVD TVCIOVIL131N13nonana
project
The site of the Dubuque Intermodal Transportation Campus is bounded by Washington Street, 9th Street, 11th Street, and the US 61/151 overpass and encompasses an area
of approximately 120,000 square feet of new construction. The City of Dubuque has envisioned the facilities to accommodate the arrival of a passenger train connection
between Dubuque and Chicago. Other components of the project include the construction of an elevated parking structure with a capacity for approximately 290 vehicles,
with the potential of expanding it to a 450 car facility in the future; a Terminal building providing local and inter -state bus service, ticketing services for the Amtrak railway
system, City transit office spaces, and public restrooms. The facilities within the Campus will also incorporate aspects that are pedestrian friendly and would be accessible
via bike lanes.
While technically only the parking facility falls within the historic Millwork District footprint, the overall design of the new Intermodal Transportation Campus adheres to the
principles of the Secretary of the Interior's Standards for the Treatment of Historic Properties, specifically items dealing with new construction in historic districts: Item 3.
Each property shall be recognized as a physical record of its time, place, and use. Changes that create a false sense of historical development, such as adding conjectural
features or elements from other historic properties, shall not be undertaken. Item 9. New additions, exterior alterations, or related new construction shall not destroy
historic materials, features, and spatial relationships that characterize the property. The new work shall be differentiated from the old and shall be compatible with the
historic materials, features, size, scale and proportion, and massing
to protect the integrity of the property and its environment.
Item 10. New additions and adjacent or related new construction shall be undertaken in such a manner that, if removed in the future, the essential form and integrity of the
historic property and its environment would be unimpaired.
The design strategy for the Intermodal Campus seeks to make reference to the historic setting while consciously avoiding literal resemblance or directly working within
other historic styles found in the district. It attempts to create an urban edge to the historic Millwork District and also create venues for open public spaces in the void
spaces between the surrounding buildings. This approach also seeks to balance differentiation and compatibility of the new building within a historical context.
The bay spacing of the parking structure has been minimized to attempt to resemble the uniform alignment, rhythm and width of the surrounding facades and also re-
establish a strong edge to the street, reflecting the historic siting patterns of the district. The base of the parking structure provides the desire to minimize the visual impact
of vehicles while also referencing the loading dock datum line of the adjacent buildings that helps express the distinction of floor heights between the street level and the
upper levels of the structure.
This referencing to context is also suggested by the reduction of composite form to abstract shapes with the building materials and making connections through massing,
size, materials, and a restricted articulation of the facade, allowing the facility to be both "modern" and "contextual" at the same time. The selection of terracotta baguettes
at the Parking facility and terracotta rainscreen wall systems at the Terminal building are utilized to complement the traditional brick construction of the district while also
addressing the openness requirements of a parking structure and integrating advanced building technologies within the Intermodal Campus as strategies used to provide a
contemporary interpretation of traditional design and detailing that are encouraged by the Downtown Design Guidelines. The proposed design of the Campus seeks to meet
the City of Dubuque's goals of providing architectural aspects that enhance the overall aesthetics of the Millwork District and further contribute to the overall vitality of the
area.
DUBUQUE INTERMODAL CAMPUS NEUMANN MONSON ARCHITECTS
NORTH ELEVATION
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
SOUTH ELEVATION
W..
E.
7k.
-1 4
k- II, 16 175E 11.1 g15, gr„
PI Nil lis gEt
- -
IIT.=== , dr
FLU 13 "."
pm,
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHI
EAST ELEVATION
IN El El II PS 11.0
MI .11V
1■ 1 ■ 1 1 BIN
1 11 1 11
at}_ ail , I *pop
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
EAST ELEVATION_TERMINAL
DUBUQUE INTERMODAL CAMPUS NEUMANN MONSON ARCHITECTS
WEST ELEVATION
11 111 111 11 11
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
WEST ELEVATION_TERMINAL
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
AERIAL VIEW FACING WEST
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
AERIAL VIEW FACING SOUTH WEST
Mil RI IR 9M
IME'
111111 Nil 1111 NC IN I■ A 11
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
AERIAL VIEW FACING SOUTH
mad liPM /ME NEE Litit:.
g nFITE:'� :'�' V.i.W i'iiT'Zig r!iniii
:r. W W a NE Will
i ., e. e:.;r".L. Wmm i1i;:ii:. ........
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
AERIAL VIEW FACING NORTH WEST
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
SOUTH WEST CORNER OF RAMP
It
t
If 11! 1111111111! Y 11111 nn Im UIIInq n
1111111 Ini1111J11M111111 II 111,11
II I IIIII I ill l 1111� Ill 1111'
111111 1111111 1 11111 III 11
111 1/111111111 It
111 1 1 111 11
1111111111111111111
111 III 1 1111111 1 II II 111 11
118I11111
nim or --
A
1 1.. 1: 1 41 b 1 14' t.,. Y.
, 1:...1.. 11::'1 1111 1 1 ' 1'
NEUMANN MONSON ARCHITECTS
DUBUQUE INTERMODAL CAMPUS
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
PEDESTRIAN BRIDGE_SOUTH TERMINAL
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
MATERIAL PRECEDENT _IPE WOOD
DUBUQUE INTERMODAL CAMPUS
NEUMANN MONSON ARCHITECTS
MATERIAL PRLCEDENT_PERFORATED METAL
DUBUQUE INTERMODAL CAMPUS
NcumAwwwowsomARCHITECTS
MATERIAL PRFCFnFNT TFRRACCTTA
DUBUQUE INTER MODAL CAMPUS
NEUMANN MONSON ARCHITECTS
RESOLUTION NO. 62-14
DUBUQUE INTERMODAL TRANSPORTATION CENTER
PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT,
AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS,
SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND
ORDERING THE ADVERTISEMENT FOR BIDS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
The proposed plans, specifications, form of contract and estimated cost for the
Dubuque Intermodal Transportation Center in the estimated amount of $14,430,944, are
hereby preliminarily approved and ordered filed in the office of the City Clerk for public
inspection. This project is partially funded by the Federal Transit Administration.
A public hearing will be held on the 17th day of March, 2014, at 6:30 p.m. in the
Historic Federal Building Council Chambers at which time interested persons may
appear and be heard for or against the proposed plans and specifications, form of
contract and estimated cost of said Project, and the City Clerk be and is hereby directed
to cause the attached notice of the time and place of such hearing to be published in a
newspaper having general circulation in the City of Dubuque, Iowa, which notice shall
be published not less than four days nor more than twenty days prior to the date of such
hearing. At the hearing, any interested person may appear and file objections to the
proposed plans, specifications, form of contract, or estimated cost of the Project.
The Dubuque Intermodal Transportation Center Project is hereby ordered to be
advertised for bids for construction.
The amount of the security to accompany each bid shall be in an amount which shall
conform to the provisions of the Notice to Bidders hereby approved.
The City Clerk is hereby directed to advertise for bids for the construction of the
improvements herein provided, by publishing the attached Notice to Bidders to be
published in a newspaper having general circulation in the City of Dubuque, Iowa, which
notice shall be published not less than four but not more than forty-five days before the
date for filing bids before 2:00 p.m. CST, on the 8th day of April, 2014. Bids shall be
opened and read by the City Clerk at said time and will be submitted to the City Council
for final action at 6:30 p.m. on the 21st day of April, 2014, in the Historic Federal
Building Council Chambers (second floor), 350 West 6t" Street, Dubuque, Iowa.
Passed, adopted and approved this 3rd day of March, 2014.
Attest:
/ / />
Kevin irnstahl, C C, y Clerk
oy D. Buol, Mayor
NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF
CONTRACT, AND ESTIMATED COST FOR DUBUQUE INTERMODAL
TRANSPORTATION CENTER
NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque,
Iowa will hold a public hearing on the proposed plans, specifications, form of
contract and estimated cost for the Dubuque Intermodal Transportation Center,
in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on
the 17 day of March, 2014, in the Historic Federal Building Council Chambers
(second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans,
specifications, form of contract and estimated cost are now on file in the office of
the City Clerk. At said hearing any interested person may appear and file
objections thereto.
The scope of the Project is as follows:
The Dubuque Intermodal Transportation Center will consist of a 3 level
parking ramp consisting of 292 spaces along with an intermodal transportation
center with offices for inter -city bus personnel, waiting areas for intra/inter-city
public transportation.
The parking facility will be considered an open structure, in conformance with
International Building Code, containing sufficient openings to provide natural
ventilation of all parking areas. Two stair towers on the east and west end and
only the west tower will have an elevator.
Vehicle entrances and exits will be on 9th Street on the south side and
Washington Street on the west side of the ramp. Main entrances will be on the
east side of Elm Street with a connected walkway between the ramp and transit
center office/public area.
Any visual or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City Clerk's office at (563)
589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting.
2014.
Published by order of the City Council given on the day of
Kevin S. Firnstahl, CMC, City Clerk
NOTICE TO BIDDERS
CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT
DUBUQUE INTERMODAL TRANSPORTATION CENTER
Time and Place for Filing Sealed Proposals. Sealed bids for the work
comprising the improvement as stated below must be filed before 2:00 p.m.
Central Time on April 8th, 2014, in the Office of the City Clerk, City Hall - First
Floor, 50 West 13th Street, Dubuque, Iowa.
Time and Place Sealed Proposals Will be Opened and Considered. Sealed
proposals will be opened and bids tabulated at 2:00 p.m. Central Time on April
8th, 2014, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa,
for consideration by the City Council at its meeting on April 21, 2014. The City of
Dubuque, Iowa, reserves the right to reject any and all bids.
Time for Commencement and Completion of Work. Work on this public
improvement shall be commenced within 10 days after the Notice to Proceed has
been issued and shall be fully completed within 365 calendar days.
Bid Security. Each bidder shall accompany its bid with a bid security as security
that the successful bidder will enter into a contract for the work bid upon and will
furnish after the award of contract a corporate surety bond, acceptable to the
governmental entity, for the faithful performance of the contract, in an amount
equal to one hundred percent of the amount of the contract. The bid security
shall be in the amount of ten percent (10%) of the amount of the contract and
shall be in the form of a cashier's check or certified check drawn on a state -
chartered or federally chartered bank, or a certified share draft drawn on a state -
chartered or federally chartered credit union, or the governmental entity may
provide for a bidder's bond with corporate surety satisfactory to the governmental
entity. The bid bond shall contain no conditions excepted as provided in this
section.
Contract Documents. Copies of the bidding documents may be obtained at Tri-
State Blue Print & Framing Company (also known as Technigraphics), 696
Central Avenue, Dubuque, IA 52001. (Voice: (563) 556-3030.There is no plan
deposit and the plans and specifications are available electronically by going to
the City of Dubuque website at cityofdubuque.org.
Statement of Federal Participation. This project will be partially funded with
federal funds from the Federal Department of Transportation, Award # IA -04-
0124-00 and therefore is subject to the federal laws and regulations associated
with that program.
Federal Prevailing Wage Rate. This project will be partially funded with federal
funds from the Federal Transit Administration based on grant approval and
therefore is required to comply with all provisions of the Davis -Bacon Federal
Prevailing Wage Act and related labor requirements and regulations.
Buy America Provision. Equipment or products authorized to be purchased
with federal funding awarded for this contract must be American-made to the
maximum extent feasible, in accordance with Public Law 103-121, Sections
606(a) and (b).
Administration. Each bid shall be accompanied by a satisfactory Bid Bond
executed by the Bidder and an acceptable surety; or a cashier's or certified
check payable to the City Treasurer, City of Dubuque, drawn on a bank in Iowa
or a bank chartered under the laws of the United States, in the amount of ten
percent (10%) of the bids submitted as security that the bidder will enter into a
contract for doing the work and will give bond with proper securities for the
faithful performance of the contract in the form attached to the construction
documents.
The successful bidder (Contractor) will be required to furnish a Performance
Bond in an amount equal to one hundred percent (100%) of the contract price.
Said bond is to be issued by a responsible surety company approved and
acceptable to the City Council, and shall guarantee the faithful performance of
the contract and terms and conditions therein contained, and shall guarantee the
prompt payment of all materials and labor and protect and save harmless the
City of Dubuque, Iowa, from claims and damages of any kind caused by the
operations of the Contractor.
The successful bidder (Contractor) will also be required to furnish a Payment
Bond in the amount of 100% of the contract price that will guarantee the prompt
payment of all subcontractors, suppliers, materials, labor and protect and save
harmless the City of Dubuque, Iowa, from claims and damages of any kind
caused by the operations or non-payment on behalf of the Contractor.
The successful bidder (Contractor) will also be required to furnish a Maintenance
Bond that will guarantee the material, workmanship and maintenance of the
improvements) constructed for a minimum period of two (2) years from and after
its acceptance of the work under the Contract by the City Council of the City of
Dubuque, Iowa, by reason of defects in workmanship or materials used in
construction of said work.
Sales Tax. The Contractor and approved subcontractors will be provided a
Sales Tax Exemption Certificate to purchase, or withdraw from inventory,
materials furnished for this project.
No bid submitted by any Contractor which contains a condition or qualification
shall be recognized or accepted by the City Council and any letter or
communication accompanying the bid which contains a condition or qualification
upon the bid which has the effect of qualifying or modifying any provision of the
specifications in any manner will be rejected by the City Council as not
responsive.
All proposals must be made on blanks furnished by the City of Dubuque and
each bidder will be required to state his prices for doing all the items in each
section on which he makes a bid and for all things necessary to make a complete
job.
The Bidder's attention is directed to the City of Dubuque's Affirmative Action
Program which is included in the Contract Specifications and the provisions
thereof and hereby made a part of the Contract Documents by reference and
incorporated therein.
The Contractor, when requested by the City of Dubuque, will furnish a statement
of his financial and practical qualifications as provided for in the General
Requirements of the Specifications.
The City Council reserves the right to reject any and all bids or to waive
any technical ties and irregularities.
General Nature of Public Improvement.
The Dubuque Intermodal Transportation Center will consist of a 3 level parking
ramp consisting of 292 spaces along with an intermodal transportation center
with offices for inter -city bus personnel, waiting areas for intra/inter-city public
transportation. The parking facility will be considered an open structure, in
conformance with International Building Code, containing sufficient openings to
provide natural ventilation of all parking areas. Two stair towers on the east and
west end and only the west tower will have an elevator.
Vehicle entrances and exits will be on 9th Street on the south side and
Washington Street on the west side of the ramp. Main entrances will be on the
east side of Elm Street with a connected walkway between the ramp and transit
center office/public area.
Pre -Bid Construction Conference.
Attendance by all prospective general contractor bidders and the attendance of
sub -contractor bidders is not mandatory, but highly recommended. The pre-bid
construction conference is to be held at 1:00 PM Central Time on March 25th,
2014, at the Five Flags Civic Center — Majestic Room (Locust Street entrance,
second level) at 405 Main Street, Dubuque, IA 52001.
Published in the Telegraph Herald, March 7, 2014.
IN THE DISTRICT COURT OF IOWA IN AND FOR DUBUQUE COUNTY
Certification of Publication
See attached
Document
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of
the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of
Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on
the following date(s): iark, 01 t and for which the charge is $ V Z a (
Subscribed to before me, Notary Public in and for Dubuque County, Iowa,
,20
this //%day of
ARY kC, WESTERMEYER
Commission Number 154885
My Comm. Exp, FEB. 1, 2017
Notary P`c in and for Dubuque County
CITY OF DUBUQUE
OFFICIAL NOTICE
NOTICE OF PUBLIC
HEARING ON PLANS,
SPECIFICATIONS,:
FORM OF CONTRACT,
AND ESTIMATED
COST FOR DUBUQUE
INTERMODAL: TRANS-
PORTATION CENTER
NOTICE IS HEREBY
GIVEN: The City Coun-
cil of the City of Dubu-
que, Iowa will hold a
public hearing on the
proposed plans, speci-
fications, form of con-
tract and estimated
cost for the Dubuque
Intermodal Transporta-
tion Center, in accord-
ance with the provi-
sions of Chapter 26, 'I
Code of Iowa, at 6:30
p.m., on the 17 day of
March, 2014, in the His-
toric Federal Building;
Council Chambers
(second floor), 350
West 6th Street, Dubu-
que, Iowa. Said pro-
posed plans, specifica-
tions, form of contract
and estimated cost are
now on file in the office
of the City Clerk. At
said hearing any inter-
ested person may ap-
pear and file objections
thereto.
The scope of the Proj-
ect is as follows:
The Dubuque Inter-
modal Transporta-
tion' Center will con-
sist of a 3 level parking
ramp consisting of 292
spaces along with an
intermodal transporta-
tion center with offices
for inter -city bus per-
sonnel, waiting areas
for intra/inter-city pub-
lic transportation.
The parking facility
will be considered an
open structure, in con-
formance with Interna-
tional Building Code,
containing sufficient
openings to provide
natural ventilation of
all parking areas. Two
stair towers on the
east and west end and
only the west tower
will have an elevator,
Vehicle entrances and
exits will be on 9th
Street on the south
side and Washington
Street on the west side
of the ramp. Main en-
trances will be on the
east side of Elm Street
with a connected walk-
way between the ramp
and transit center
office/public area.
Any visual or hearing-
impaired persons
needing special assis-
tance or persons with
special accessibility
needs should contact
the City Clerk's office
at (563) 589-4100 or
TDD at (563) 690-6678
at least 48 hours prior
to the,meeting.
2:00 p.m. Central
Time on,Aprii 8th,'2014,
in the Office of the City
Clerk, City Hall - First
Floor, 50 West 13th
Street, Dubuque, Iowa.
foreTransit Administration
based on grant appro-
val and therefore is`re-
quired to `comply with
all provisions of the
Time :and Place Davis -Bacon Federal
Sealed Proposals Prevailing Wage Act
Will be Opened and and related labor re
Considered. Sealed
proposals will ' be
opened and bids tabu-
lated at 2:00 p.m. Cen-
tral Time on April 8th,
2014, at City Hall --Con-
ference': Room A, 50
West 13th Street, Du-
buque, Iowa, for con-
sideration by the City
Council at its meeting
on April 21, 2014. The
City of Dubuque, Iowa,
reserves the right to
reject any and all bids.
Time for ,Com-
mencement and
Completion of Work.
Work on this public im-
provement shall be
commenced within 10
days after the Notice to
Proceed has been is-
sued and shall be fully
completed within 365
calendar days.
Bid Security. Each
bidder shall accompa-
ny its bid with a bid se-
curity as security that
the successful bidder
will enter into a con-
tract for the work bid
upon and will furnish
after the award of con-
tract a corporate sure-
ty bond, acceptable to
the governmental enti-
ty, for the faithful per-
formance of the con-
tract, in an amount
equal to one hundred
percent of the amount
of the contract. The bid
security shall be in the
amount of ten percent
(10%) of the amount of
the contract and shall
be in the form i of a
cashier's check or cer-
tified check drawn on a
state -chartered or fed-
erally chartered bank,
or a certified share
draft drawn on a state -
chartered or federally
chartered credit union,
or the governmental
entity may provide for
a bidder's bond with
corporate surety satis-
factory to the govern-
mental entity. The bid
bond shall contain no
conditions excepted as
provided in this sec-
tion.
Contract Docu-
ments. Copies of the
bidding documents
maY be obtained at Tri-
State Blue Print &
Framing Company (al-
so known as Tech-
nigraphics), 696 -Cen- contractors, suppliers,
tral Avenue, Dubuque, materials, labor and
IA 52001. (Voice: (563) protect and save harm-
556-3030.There is no less the City of Dubu-
plan deposit and the que, Iowa, from claims
plans and specifica- and damages of any
tions are available kind caused by the op -
Published by order of = electronically by'going erations or non -
the City Council given to the City of Dubuque payment on behalf of
on the 7th day of website at the Contractor.
March, 2014. : cityofdubuque.org The successful bidder
Kevin S. Firnstahl, Statement of Feder -
CMC, City Clerk al Participation. This
NOTICE TO BIDDERS project will be partially
CITY OF DUBUQUE i funded with federal
PUBLIC funds from the Federal
IMPROVEMENT Department of Trans -
PROJECT portation, Award # IA- the improvements)
DUBUQUE 04-0124-00 and there- constructed for a mini
INTERMODAL fore is subject to the m d
quirements and regula-
tions.
Buy America Provi-
sion. Equipment or
in construction of said
work.
Sales Tax. The Con-
tractor and approved
subcontractors will be
provided a Sales Tax
Exemption Certificate
to purchase,lor with-
draw from inventory,
materials furnished for
this project.
No bid submitted by
products authorized to any Contractor which
be purchased with fed- contains a condition or
eral funding awarded qualification shall be
for this contract must recognized or accepted
be American-made to by the City Council and
the maximum extent any letter or communi-'
feasible, in accordance cation accompanying
with Public Law 103- the bid which contains
121, Sections 606(a) a condition or qualifi-
and (b)
cation upon the bid
Administration. which has the effect of
Each bid shall be ac- qualifying or modifying
companied, by a satin- any provision of the
factory Bid Bond exe- specifications in any
cuted by '-the Bidder manner will be'reject-
and an acceptable sur- ed by. the City Council
ety; or a cashier's or as not responsive.
certified check payable All Proposals must be
to the City Treasurer, made on blanks fur -
City of Dubuque, drawn ' nished by the City of
on a bank in Iowa or a Dubuque and each bid -
bank chartered under der will be required to
the laws of the United state his prices for do -
States, in the amount ing all the items in
of ten percent (10%) of each section on which
the bids submitted as he makes a bid and for
security that the bid- all things necessary to
der will enter into ` a make a complete job.
contract for doing the The Bidder's attention
work and will give is directed to the City
bond with proper se- of Dubuque's Affirma-
tive Action Program
which is included in the
Contract Specifications
and the provisions
thereof and hereby
curities for the faithful
performance of the
contract in the form at-
tached to the construc-
tion documents.
The successful bidder made a part; of the
(Contractor) will be re- Contract Documents by
quired to furnish a Per- reference and incorpo-
formance Bond in an rated therein.
amount equal to one The Contractor, when
hundred percent requested by'ithe City
(100%) of the contract of Dubuque, will fur -
price. Said: bond is to nish a statement of his
be issued by a respon- financial and practical
sible surety company qualifications as pro -
approved
and accepta- vided for in the General
ble to the City Council, Requirements ` of the
and shall;' guarantee Specifications.
the faithful perform- The City Council re-
ance of the contract serves the right'to
and terms and condi- reject any and all
tions therein con- bids or, to waive any',
tained, and shall guar- technical ties and ir-
antee the prompt pay- regularities.
Ment of all materials General Nature of
and labor and protect Public Improvement.
and save harmless the The Dubuque Inter -
City of Dubuque, Iowa, modal Transportation
from claims and dam -' Center will consist of a
ages of any kind 3 level parking ramp
caused by the opera- consisting of 292
tions of the Contractor. spaces along with an
The successful bidder intermodal transporta-
(Contractor) will also tion'center with offices
be required to furnish a for inter-city:bus per -
Payment Bond in the sonnel, waiting areas
amount of 1,00% of the for intra/inter-city pub
contract price that will —
guarantee the prompt
payment of all sub
(Contractor) will also
be required to furnish a
Maintenance Bond that
will guarantee the ma-
terial,
workmanship
and maintenance of
TRANSPORTATION federal lawand regu-
CENTER lations associated with
Time and Place for; that program.
Filing Sealed Propos- Federal Prevailing
els. Sealed bids for the ', Wage Rate. This proj
work comprising the ect'will be partially
improvement as stated funded 'with federal
below must be filed be- funds from the Federal
um pervo of two (2),
years from and after
its acceptance of the
work under the Con-
tract by the City Coun-
cil'of the City of Dubu-
que, Iowa, by reason of
defects in workman-
ship or materials used
lic transportation. The
parking facility will be
considered an open
structure, in conform-
ance with International
Building Code, contain-
ing sufficient openings
to provide natural ven-
tilation of all parking
areas. Two stair towers
on the east and west
end and only the west
tower will have an ele-
vator.
Vehicle entrances and
exits will be on 9th
Street on
the south
side and Washington
Street on the west side
of the ramp. Main en-
trances will be on the
east side of Elm Street
with a connected walk-
way between the ramp
and transit center
office/public area.
Pre -Did Construc-
tion Conference.
Attendance by all pro-
spective general con-
tractor bidders
on-tractorrbidders and the
attendance of I sub-
contractor bidders is
not mandatory, but
highly recommended.
The pre-bid construc-
tion conference is to be
held at 1:00 PM Central
Time on March 25th,`
2014, at the Five Flags
Civic Center - Majestic
Room (Locust 'Street.
entrance, second level)
at 405 Main Street, Du-
buque, IA
ubuque,'IA 52001.
Published in the Tele-
graph Herald, March 7,
2014.
1t 3/7