Loading...
SRF Drinking Water Infrastructure AppTHE CITY OF DUB E ~r-~~ MEMORANDUM February 12, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: State Revolving Fund Loan for Drinking Water Infrastructure Application Drinking water projects eligible for State Revolving Fund Loans (SRF) include construction of treatment plants or improvement to existing facilities; water line extensions to existing unserved properties; water storage facilities; and wells. The Eagle Point Clear Well Reservoirs Rehabilitation project totaling $1,037,000 has been identified as an eligible construction project for an SRF loan from the Iowa Finance Authority and the Iowa Department of Natural Resources. If approved, the City would be eligible for 3% interest plus a 0.25% annual servicing fee on construction loans for drinking water projects costs and 0% interest for up to three years on planning and design work for construction projects. The current budget included the project to be funded with General Obligation (GO) bond financing at estimated interest costs of 4.5% for 20 years. Budget Director Jenny Larson recommends City Council approval to apply for State Revolving Fund Loans to fund the Eagle Point Clear Well Reservoirs Rehabilitation project in place of the GO Bond financing. I concur with the recommendation and respectfully request Mayor and City Council approval. ,~ Vr~ . Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Jenny Larson, Budget Director THE CITY OF DuB E MEMORANDUM ~-~-~ February 20, 2007 TO: Michael C. Van Milligen, City Manager FROM: Jenny Larson, Budget Director SUBJECT: State Revolving Fund Loan for Drinking Water Infrastructure Application Introduction Drinking Water Projects eligible for State Revolving Fund Loans (SRF) include construction of treatment plants or improvement to existing facilities; water line extensions to existing unserved properties; water storage facilities; and wells. The Clear Well Reservoirs Rehabilitation Program has been determined as an eligible project for submittal fora SRF loan. If the application is approved by City Council for submittal to the Iowa Finance Authority and the Iowa Department of Natural Resources (DNR), the City would be eligible for 3% interest plus a 0.25% annual servicing fee on construction loans for drinking water project costs and 0% interest for up to three years on planning and design work for construction projects. The current budget included these projects to be funded with General Obligation (GO} bond financing at estimated interest costs of 4.5% for 20 years. Background To be fiscally responsible, the City of Dubuque is constantly looking at ways to complete projects with the least amount of debt service. The City contracted with East Central Intergovernmental Association (ECIA) for the services of Community Development Director Mark Schneider to assist in the application process. This was important since Mark has existing relationships with the DNR and experience with the SRF program. The program has a quarterly application process with the deadline for the next round of SRF applications being March 1, 2007. Discussion City staff, with the assistance of Mark Schneider, identified the Eagle Point Clear Well Reservoirs Rehabilitation project totaling $1,037,000 as an eligible construction project. Staff desires to submit an SRF application to the Iowa DNR for review and approval at the Environmental Protection Commission's June meeting. The June approval of the application will allow for the proposed project to proceed with the construction timeline identified in the application. Action I am respectfully requesting City Council approval to apply for the State Revolving Loan funds and use the funds in place of GO Bond financing if the applications are approved by the Iowa Finance Authority and the DNR. This provides opportunity to reduce debt service costs on large capital projects in the future. I will continue to evaluate other opportunities to use State Revolving Loan Funds in the future. Jml cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Ken TeKippe, Finance Director Bob Green, Water Plant Manager Mark Schneider, ECIA Community Development Director PWSID: D Date Received: SRF Tracking Number: County: Exhibit 3 Iowa Department of Natural Resources Water Supply Engineering Section APPLICATION FOR INCLUSION ON PROJECT PRIORITY LIST DRINKING WATER STATE REVOLVING FUND INTENDED USE PLAN (IUP) This form may be used to apply for inclusion on the project priority list of DWSRF IUP at the time the Preliminary Engineering Report is submitted. IUPs are developed on an annual basis with quarterly updates as needed. This form is not an application for a loan. DWSRF loan application materials may be obtained from the Iowa Finance Authority (IFA) at 800-432-7230, a-mail lori.beary@iowa.gov or at www.iowafinanceauthority.gov when the project is ready for a construction loan. Instructions: Complete the requested information in the following sections to the best of your ability. Please print or type the information on the form. If a particular item does not apply to your system, enter n/a for "not applicable." Attach supporting documentation as needed. Keep a copy of the completed application for your records, submit a copy to your engineer, and submit the original signed form to the following address: Jennifer Bunton, P.E. Iowa Department of Natural Resources 401 SW Seventh Street, Suite M Des Moines, IA 50309 Section 1: Applicant Information Applicant Name: City of Dubuque Applicant Address: 50 West 13t Street, Dubuque, IA 52001 Authorized Representative: Michael Van Milligen Signature: Title: City Manager Telephone Number: 563-589-4116 E-mail: ctymgr@cityofdubuque.org Consulting Engineer: Ted Payseur Firm: Veenstra & Kimm, Inc. Telephone Number: 515-238-5466 E-mail: tpayseur@v-k.net Population Served: Community: 57,686 Service Area: 57,686 Number of Service Connections: 21,741 total (19,813 residential; 1,855 commercial; 73 industrial) Profit Status of the System Check one: (for Nontransient ^ Not for profit system Noncommuni s stems only): ^ Profit S stem Percentage of Population 41 meetin LMI criteria: Method of determining Check one: percentage LMI ®2000 Census ^ Income survey (if checked, list party that conducted survey) If the percentage of Are you interested in an extended loan term? population served by the ^ Yes project is greater than 51% ^ No LMI, this project may be ®NA eligible for an extended loan term (up to 30 years.) Proposed Project Schedule Final plan and specification date: June 15, 2007 Construction Initiation Date: September 1, 2007 Date You Intend to Sign a Loan Agreement: Yes Section 2: Brief Project Summary (Attach additional pages if necessary.) Describe the reasons for the proposed project: (i.e. specific water quality problem or system improvement) The proposed project will restore two deteriorating concrete clear well storage reservoirs. The reservoirs store treated water in route to the City's distribution system. The concrete reservoirs are developing cracks that must be repaired to eliminate the entry of contaminants into the City's drinking water supply. Describe the proposed project: (i.e., specific solution to the water quality problem, or proposed system improvement) The proposed project will consist of repairs to the west reservoir including wall repair with epoxy injection, repairs to spans in the roof, replacement of mastic are roof expansion joints cleaning and paintingof roof openings, new EDPM roof membrane, and disinfection of the reservoir. The repairs to the east reservoir include roof, beam, and stub wall removal repair of gunite lining and columns, new concrete stub wall, new double tee roof and concrete tamping, new roof openin s and epoxy coating on interior wall of reservoir. Which other funding programs Check all that apply: are you considering to assist in ^ Community Development Block Grant (CDBG) completion of this project? ^ Rural Development Grant and/or Loan ^ Clean Water State Revolving Fund (for water system waste treatme projects) ^ Reserve Funds ^ Other: Does your project involve a Check one: consolidation of two or more ^ Yes water systems? ®No If Yes, list systems and populations served: Section 3: Proiect Cost Cost Category Estimated Total Cost, $ Administration, legal Land, structures, right-of--way, appraisals + Relocation expenses + Architectural and engineering fees + 62,000 Project inspection fees + Soil investigation, Site work, demolition, debris removal + Construction + 794,050 Equipment + Miscellaneous + PROJECT SUBTOTAL = 856,050 Contingencies + 171,100 Planning and design loan proceeds, if rolling into construction loan + Less "funds requested from other sources" - 0 LOAN SUBTOTAL = 1,027,150 Loan Initiation Fee (Loan Subtotal x .O1) + 10,271 TOTAL IUP REQUEST = 1,037,000 *Supporting materials may be requested to document funding requests and system needs. Please include the following items with your application: ® Two official copies of the Preliminary Engineering Report, if not already submitted. If already submitted, date submitted: ® Completed Viability Assessment Manual, available for download on our website at httx~:-rw~~-w.iowadnr.com`water/yiabilitv,~manual.html ® Map of project area, if not included in Preliminary Engineering Report Iowa Finance Authority I N V E S T I N 6 I N HOME AND C O M M U N I T Y State Revolving Fund Loan Application Applicant: City of Dubuque Tax ID Number: 42-6004596 NPDES Number (if applicable): PWSID Number (if applicable): 3126052 Contact person/Title: Kenneth J. TeKippe, Finance Director Address: 50 West 13th Street City Dubuque County Dubuque State IA Zip Code: 52001 Telephone Number: 563-589-4133 Fax Number: 563-589-0890 E-mail address: ktekippe(~cityofdubuge.org Amount of Loan Request: $ 1,037,000 Clean Water SRF or rinking Water S (circle one) Description of project: - -- - -- Clean Water S>fl~•(~anitAry Sewer) - Clean Water'SRF (,Stp~r~~elver) -- ^ Treatment __ __ ^ Stora~e/Detention __ - -_ ^ Infiltration/inflow correction ^ Treatment _._ _. ^ Sewer system rehabilitation ^ New collectors to existing communities __ ^ Interceptor/Trunk Line ^ New interceptors '; ^ Collector ^ Correction of Combined Sewer Overflow ' ^ Other ^ Non Point Source Project - - -- - Drinkita _ <• g•'4V~ter-SRS ^ Treatment ®Storage ^ Transmission & Distribution '; ^ purchase or consolidation of systems ^ Source (wells) ' ^ land acquisition Have you obtained all permits and authorization s required for this project? (DNR technical staff can inform you of the permits and authorizations needed for your project.) Yes No N/A Date Obtained Date Expected Operating Permit X Construction Permit X 6-1-07 Others: Is the system under any regulatory compliance order? ^ Yes ®No Have construction bids been awarded? ^ Yes ®No If no, what is the projected bid award date? June 15, 2007 What is the expected construction start date? September 1, 2007 What is the expected project completion date? November 1, 2008 PROFESSIONAL CONSULTANTS (provide if known) Project Engineer: Name of Contact Person: Veenstra & Kimm Ted Pa Mailing Address: 3000 Westown Parkway City, State, and Zip Code: West Des Moines IA 50266 Telephone Number: (515) 238-5466 E-mail address: tpayseur(a~v-k.net Bond Counsel: Ahlers & Cooney, LLP Bond Counsel: William Noth Mailing Address: 100 Court Ave. City, State, and Zip Code: Des Moines, IA 50309-2256 Telephone Number: 515-246-0332 E-mail address: wnothna,ahlerslaw.com Financial Advisor (if any): Name of Contact Person: Mailing Address: City, State, and Zip Code: _ Telephone Number: E-mail address: SOURCE OF FUNDS/COST BREAKDOWN FOR PROJECT Source of Funds Amount re uested from SRF (this ap lication) $ 1,037,000 Federal grant or loan- S ecify $ Applicant's share $ Other- Specify $ Total Source of Funds $ 1,037,000 Project Cost Breakdown Administrative & Legal expenses $ Land and easements $ Relocation expenses $ Planning & Design expenses $ 62,000 Engineering construction fees $ Construction $ 794,050 Equi ment $ Interest during construction $ Miscellaneous $ Contingency $ 171,100 Other- Specify $ Total Pro"ect Cost $ 1,027,150 Minus Funds from other sources ($ 0 ) SRF Loan Request $ 1,027,150 1% origination fee (.O1 x SRF amount) $ 10,271 Total SRF Loan $ 1,037,000 2 Type of debt requested (check one): G.O. Revenue X Combination If GO -Has bond counsel calculated GO debt capacity for this project? ^Yes ^ No If Yes -enter debt capacity information Constitutional Debt Limit $ Outstanding constitutional debt $ Constitutional Debt Capacity $ Remaining % of capacity left If No -STOP -application cannot be completed without this analysis -contact bond counsel ASAP to calculate debt capacity If Revenue: Do you have any outstanding debt payable from the system revenues? ®Yes ^ No If Yes, please list: Existing System Debt: Current Balance Interest Year Maturity Annual Payment Rate Issued Date (Prin~'ra~ + rnterest) Revenue Bonds O B fr a $1,900,000 3.00% 2002 6/1/17 $221,992 P y abl e o SystemRevenues) Has bond counsel reviewed parity debt provisions for outstanding debt? Have ordinances related to rates been adopted for financing this project? If no - is the city planning on adopting ordinances? ^Yes ^ No If yes -When will these ordinances be adopted? ^ Yes ^ No ® Yes ^ No If no -Why are new ordinances not being adopted? How much of the SRF loan being requested, if any, will be used to refinance existing debt? Does your system or city have a current bond rating? ®Yes ^ No ^ I don't know If yes, what is it? Aa2 Which rating agency rated your city? Moody's l $ 0 3 Summary Statement of Revenue and Expenditures for System REVENUES 2 years aQO Last Year Current Year Next Year 2 vrs from nnw Residential 2,091,741 2,318,667 2,419,882 2,458,880 2,498,658 Commercial 1,646,689 1,825,333 1,905,014 1,935,714 1,967,028 Deferred Charges 712,082 789,333 837,066 837,066 850,607 Other- Explain TOTAL REVENUES: $ 4,450,512 $ 4,933,333 $ 5,148,686 $ 5,231,660 $ 5,316,293 EXPENDITURES: Operation and Maintenance 3,332,279 3,715,769 3,829,255 3,944,133 4,062,457 Depreciation and Amortization 948,888 854,087 1,038,237 796,669 957,943 Other- Explain TOTAL EXPENDITURES: $ 4,281,167 $ 4,569,856 $ 4,867,492 $ 4,740,802 $ 5,020,400 NET OPERATING INCOME: $ 169,345 $ 363,477 $ 281,194 $ 490,858 $ 295,893 OTHER INCOME: Interest 22,007 24,839 20,000 20,000 20,000 Other: Explain TOTAL OPERATING AND OTHER INCOME: $ 191,352 $ 388,316 $ 301,194 $ 510,858 $ 315,893 INCOME DEDUCTIONS: Interest on debt 103,321 97,097 90,612 136,227 128,978 Debt Retired 176,793 183,816 190,951 256,203 263,580 Other- Explain NET INCOME: $ (88,7622 $ 107,403 $ 19,631 $ 118,428 $ 76 665 RETAINED EARNINGS: Beginning of Year: $ 288,317 $ 199,555 $ 306,958 $ 326,589 $ 445,017 Ending of Year: $ 199,555 $ 306,958 $ 326,589 $ 445,017 $ 368,352 4 System Utilization for the most recent year: Number of Connections Percentage of System Annual Usage Residential 19,813 47% Commercial 1,855 37% Industrial 73 16% Unmetered 0 0% List any significant users or potential users who utilize more than 5% of the system, with approximate percentage of capacity attributed to each user. Name of IndividuaUBusiness Annual User Charge Percentage of Ca acity None ap licable The applicant must enclose the following documentation with the completed application. Please check any that are not applicable. Enclosed Not Applicable X One copy of user charge system and sewer use ordinance X Copy of 5-year capital plan if available The undersigned is duly authorized to request this loan on behalf of the Applicant. The Applicant declares under penalty of law that all facts given and information attached are true and correct. The Applicant authorizes IFA to verify all information. Authorized Signature Typed Name and Title, Date 5