Loading...
HMA Resurfacing Project_White Street (11th to 21st)THE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque band AI -America City r 2007 • 2012 • 2013 SUBJECT: White Street HMA Resurfacing with Milling Project, from 11th to 21st Street Iowa DOT Project No. NHSN-52-2(132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CIP 3602483, 7201081, 7101335, 3001615, 3602442, 7401405 DATE: March 27, 2014 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and estimated cost of $1,306,632.53 for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street. I concur with the recommendation and respectfully request Mayor and City Council approval. 14•4 Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUJi Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque kard All -America City 11111, 2007 • 2012 • 2013 SUBJECT: White Street HMA Resurfacing with Milling Project, from 11th to 21st Street Iowa DOT Project No. NHSN-52-2 (132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CIP 3602483, 7201081, 7101335, 3001615, 3602442, 7401405 DATE: March 26, 2014 INTRODUCTION The enclosed resolution is in reference to the public hearing for the White Street HMA Resurfacing With Milling Project, from 11th to 21st Street. BACKGROUND The White Street HMA Resurfacing Project, from 11th to 21st Street is Phase 2 of a 4 - Phase project that is a joint partnership between the City and the Iowa Department of Transportation (Iowa DOT). The joint venture includes Phase 1 - Central Avenue HMA Resurfacing Project, from 21st to 32nd Street (completed in 2011), Phase 2 - White Street HMA Resurfacing Project, from 11th to 21st Street (scheduled for construction 2014), Phase 3 - Central Avenue HMA Resurfacing Project, from 9111 to 21st Street and Phase 4 — 11th Street HMA Resurfacing Project, from White to Elm Street. DISCUSSION The White Street Resurfacing Project, from 11th to 21st Street will provide for the following improvements: • Pavement milling on U.S. 52 (White Street) between 11th and 21st Street. • Transverse and longitudinal joint repair as needed. • Pavement sub -base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer intake reconstruction. • Installation of ADA pedestrian access curb ramps (37 total). • Water main improvements. • Traffic signal improvements at 14th, 17th and 20th. Through the cooperative agreement, the Iowa DOT will be responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street). The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process 1st Public Informational Meeting Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans &Specifications 2nd Public Informational Meeting Public Hearing on Plans & Specifications Pre -Bid Construction Conference Receipt of Bid Proposals (Bid -Letting) Award Construction Contract (Subject to IDOT Approval) Project Completion Date March 17, 2014 March 14, 2014 March 21, 2014 March 21, 2014 April 3, 2014 April 7, 2014 March 27, 2014 April 10, 2014 April 21, 2014 October 31, 2014 PUBLIC OUTREACH The City conducted an informational meeting on Friday, March 14th, at City Hall for those businesses along the project corridor, however none of the businesses elected to attend. The City also hosted a second general public informational meeting on Thursday April 3rd, at Prescott School for the residents and businesses. City staff will provide an overview of the White Street Resurfacing Project to those impacted along the corridor, reviewed the proposed traffic control plan as well as vehicular / pedestrian access, reviewed the project schedule, and responded to feedback and questions. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street through the adoption of the enclosed resolution. BUDGET IMPACT The estimate of probable cost for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street is as follows: Estimate Construction Contract $1,038,776.27 Pre -purchased Traffic Signal Equipment 60,101.00 Contingency 103,877.63 Administration, Design, Construction Engineering & Inspection 103,877.63 Total Project Cost $1,306.632.53 The project funding summary is as follows: CIP No. Fund Description 3602483 Iowa DOT Funding 3602483 Hwy 52 - White Street Pavement Rehabilitation 7201081 Catch Basin Replacement 7101335 Sanitary Manhole Replacement 3001615 Pre -purchased Traffic Signal Equipment - Mastarms 3602442 Pre -purchased Traffic Signal Equipment - Cabinets 3001615 Traffic Signal Intersection Reconstruction 7401405 Water Main Replacement Total Project Funding Fund Amount $ 451,692.82 475,976.89 38,787.42 11,387.20 14,384.00 45,717.00 199,464.61 69,222.59 $ 1,306,632.53 The City currently has $548,900 budgeted in FY14 to cover the City's portion of the pavement rehabilitation costs and all other associated costs, such as engineering design, contract administration, construction engineering and inspection. ** The funding sources identified to cover the associated costs for the traffic signal improvements at 14th 17th and 20th Streets are listed below. To simplify the allocation and tracking of project costs, the CIP amounts listed below will be transferred to the Traffic Signal Intersection Reconstruction CIP (3001615) as part of the FY14 Budget Amendment Process. CIP No. Fund Description 3001615 Traffic Signal Intersection Reconstruction 3001266 Traffic Signal Interconnect Conduit Replacement 3001017 Traffic Optic Conduit - Paving Projects 3001133 Traffic Signal Mastarm Retrofit 2501916 LED Re -Lamp Schedule 3001549 Street Light Replacement / New City Owned 3001011 Signalization Program Total Project Funding ACTION TO BE TAKEN Fund Amount $ 60,648.00 10,000.00 9,227.00 81,101.00 10,000.00 10,000.00 18 488.61 $ 199,464.61 The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street through the adoption of the enclosed resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Dave Ness, Traffic Engineer Greg Doeden, Civil Engineer Duane Richter, Civil Engineer RESOLUTION NO. 109-14 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE WHITE STREET HMA RESURFACING WITH MILLING PROJECT, FROM 11TH TO 21ST STREET (IOWA DOT PROJECT NO. NHSN-52- 2(132)--2R-31) NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street (Iowa DOT Project No. NHSN-52-2(132)--2R-31), in the estimated amount $1,306,632.53, are hereby approved. Passed, adopted and approved this 7th day of April, 2014. Attest: Kevi . Firnstahl, C C, City Clerk oy D. Buol, Mayor CITY OF DUBUQUE, OA OFFICIIALWNOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE W#IITE STREET HMA RESUR- FACING WITNI MILL- ING PROJECT, FROM 11TH TO 21ST STREET, IOWA DOT PROJECT NO. NHSN- 052-2(132)--2R-31 NOTICE IS HEREBY GIVEN:, Tile City Coun- cil of the City of Dubu- que, Iowa will hold a public hearing on the proposed plans, speci- fications, form of con- tract and estimated cost for the White Street HMA Resurfac- ing with Milling Proj- ect, from llth to 21st Street, Iowa DOT Proj- ect No. ` NHSN-052- 2(132)--2R-31, in ac- cordance with the pro- visions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 7th day of April, 2014, in the His- toric Federal Building Council Chambers (second floor), 350 West 6th Street, Dubu- que, Iowa. Said pro- posed plans, specifica- tions, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any inter- ested person may an - pear and file objections thereto. The scope of the Proj- ect is as follows: •'Pavement milling on U.S. 52 (White Street) between llth and 21st Street. •Transverse and lon- gitudinal joint repair as • Pavement sub -base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replace- ment. • Storm sewer intake reconstruction. Installation of ADA pedestrian access curb ramps (37 total). • Water main im- provements. Trafficsignal im provements at 14th, 17th and 20th. Any visual or hearing- impaired persons needing special assis- tance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 :flours prior to the meeting. Published by the City Council given on the 17th day of March, 2014. Kevin S. Firnstahl, CMC, City Clerk 1t 3/21 NOTICE TO BIDDERS CiTY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT WHITE STREET HMA RESURFACING WITH MILLING PROJECT FROM 11TH TO 21ST STREET IOWA DOT PROJECT 140. NHSN-52-2(132)-- 2R=31 Time and Place for Filing Sealed Propos- ale. Sealed bids for the work comprising each improvement as stated below must be filed be- fore 2:00p.m. on April 10, 2014, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Du- buque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabu- lated at 2:00 p.m. on April 10, 2014, at City Hall - Conference Room B 50 West 13th Street, Dubuque, lowa, for consideration by the City Council (Council) at me, eting April 21, 2014. The Cityon of Dubuqueits `Iowa, re- serves the to re- ject any and aghtll bids. order of Time Com- mencmentfor and Completion of Work. Work on each improve- ment 'shall be( com- menced within 10 days afterceed the has Notice been to Pro- issued and shall be fully com- pleted by October 31,, 2014. B d Security. Each bidder shall accompa- ny itscurity bidas with asecurity'bidthat se - the successful bidder will enter into a con- tract for the work bid upon and will furnish tr aftaerct thaecoawardrporate of sconure- ty bond, acceptable to the governmental enti- ty, for the faithful per- formance of the con- tract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount in' tof ten percent (1Q%) iof the amount of the contract he foacidrmshalofl b case hier's check or cer- tified check drawn on a state -chartered: or fed - a erally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the govern- mental entity. The bid bond shall contain no conditions excepted as provided in this sec- tion. Contract Docu mentis. Paper copies of the construction documents may be ob- tained at the Engineer- ing Department, City Hall - Second Floor, 50 West 13th Street, Du- buque, Iowa 52001 be- ginning March 21, 2014. No plan deposit is re- quired. Preference for lowa Products and Labor._ By virtue of statutory authority,, preference will be given to prod- ucts' and provisions grown and coal pro- duced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully re- quired under Iowa stat- utes. Sales Tax. The bidder should not include sales tax in its bidA sales tax exemption certificate will be avail- able ` for all material purchased for incorpo- ration in the project. General Nature of Public improvement. White Street HMA Resurfacing ? Project, from llth to 21st' Street: • Pavement milling on U.S. 52 (White Street) between 11th and 21st Street. • Transverse and lon- gitudinal joint repair as needed. • Pavement sub -base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. Spot curb, driveway, amndent. sidewalk replace- • Storm sewer intake reconstruction. • Installation of ADA pedestrian access curb ramps (37 total). • Water main im- provements. • Traffic signal im- p7th and 20th. at 14th, Pre -Bid Construe tion Conference. Each prospective bid- der is encouraged to attend the Pre -Bid Con- struction Conference to be held at 10 AM on March 27, 2014, at the Conference Room; A, City Hall, 50 West 13th' Street, Dubuque, lowa.'I Attendance by all pro- spective bidders is not mandatory but highly recommended. Published in the Tele- graph Herald, March 21, 2014. It 3/21 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: March 21, 2014, and for which the charge is $79.22. Subscribed to before me, Notary Public in and for Dubuque County, Iowa, this a7,9-0 day of � � , 20 / . Notary Public in and for Dubuque County, Iowa. MY K. ESTERMEYEfl n1missioh Number 154885 )rnm. Exo, FES. 1, "017