Loading...
SRF Green Alley Project_Bid Set 2 - Year 1 AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 2 (CIP 7102450) DATE: March 26, 2014 Dubuque band AI -America City 11111r 2007 • 2012 • 2013 Sealed bids were received for the SRF Green Alley Bid Set 2 Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Drew Cook and Sons Excavating, in the amount of $189,683, which is 22.27% under the engineer's estimate of probable cost. The majority of the cost savings was in the bid price of the concrete pavement, stone and brick pavers Based on the bid results, it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. Based on the bid results, it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. The average assessment, based on the engineer's estimate, including contingency and engineering, was $1,057. If final costs hold with the bid results, the estimated average assessment will be reduced to $883. I concur with the recommendation and respectfully request Mayor and City Council approval. brill/14 ,,,,, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DJU1 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 24, 2014 SUBJECT: SRF Green Alley Bid Set 2 (CIP 7102450) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the SRF Green Alley Bid Set 2 Project. DISCUSSION Bid Set 2 will involve the reconstruction of four alleys in the Bee Branch Watershed. The alley locations are as follows: Dubuque AD -America Citi 11111. 2007 • 2012 • 2013 • Alleys between Prince & Queen Streets from 22nd Street to 24th Street (2 alleys) • Alley between Queen Street and Windsor Avenue from Regent Street to 24th Street • Alley between Regent Street and 22nd Street from Prince to Queen Street This project will reconstruct the second set of alleys for the SRF Green Alleys in the Bee Branch Watershed. The Engineering Department and three private consulting firms are working on the design and construction documents for the remainder of the alleys. Additional construction bid sets will be developed in 2 to 10 alley groupings. The first year of alley reconstructions include no utilities, except sewer manhole repairs where the project affects them. The reconstruction of the alleys will include: - Removal of the existing alley pavement - Excavation of the subgrade to allow the placement of clean washed stone for a storage medium - Installation of a concrete border for the brick pavers - Installation of concrete headers at the alley intersection with the intersecting streets. - Reconstruction of the pavement surface with interlocking concrete pavers This project will reconstruct the alleys into green alleys. These alleys allow rainwater to infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows for filtering of the water and recharge back into the aquifer. Monitoring wells are also planned to be installed so that water quality improvements can be documented. The project construction documents will follow the Statewide Urban Design and Specifications (SUDAS) in the development of the construction documents. The Iowa Department of Natural Resources (IDNR) have reviewed and approved the plans so that the City cost can be covered with SRF funds. This project will have special assessments. BID RESULTS The City of Dubuque received the following bids for the SRF Green Alley Project - Bid Set 2 on March 20, 2014: Contractor Bid Results Drew Cook and Sons Excavating $ 189,683.00 McDermott Excavating, Inc. $ 194,654.96 East Iowa Construction $ 222,395.45 Eastern Iowa Construction $ 228,473.60 Portzen Construction, Inc. $ 229,102.90 Horsfield Construction, Inc. $ 232,587.50 Tschiggfrie Excavating, inc. $ 237,855.94 Connelly Construction $ 244,805.24 Based on the bid results it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. The average assessment based on the engineers estimate, including contingency and engineering was $1,057. If final costs hold with the bid results, the estimated average assessment will reduce to $883.00. RECOMMENDATION I recommend that the contract for the for the SRF Green Alley Bid Set 2 Project be awarded to Drew Cook and Sons Excavating of Dubuque, Iowa in the amount of $189,683.00 which is 22.27% under the engineer's estimate of probable cost. The majority of the cost savings was in the bid price of the concrete pavement, stone and brick pavers. The IDNR have reviewed the bid tab and concur with the award of the contract. BUDGET IMPACT 2 The summary of cost for the SRF Green Alley Bid Set 2 Project is as follows: Estimate Award Construction Contract $232,415.50 $189,683.00 Contingency 23,241.55 23,241.55 Construction Engineering & Inspection 38,348.56 38,348.56 Total Project Cost $294,005.61 $251,273.11 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7102450 SRF Green AIIey Project $ 210,056.11 Special Assessment — AIIey Improvement, Residential 31,346.82 Special Assessment — AIIey Improvement, Commercial 9,870.18 Total Project Funding $251,273.11 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding for the SRF Green AIIey Project Bid Set 2 to Drew Cook and Sons Excavating in the amount of $189,683.00. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer 3 RESOLUTION NO. 110-14 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY BID SET 2 PROJECT Whereas, sealedproposals have been submitted by contractors for the SRF Green Alley Bid Set 2 Project (the Project) pursuant to Resolution No. 54-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 7th day of March, 2014. Whereas, said sealed proposals were opened and read on the 20th day of March, 2014, and it has been determined that Drew Cook and Sons Excavating of Dubuque, Iowa, with a bid in the amount of $189,683.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Drew Cook and Sons Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 7th day of April, 2014. Attest: Kevin `. - irnstahl, CMC, City Clerk Roy D. Buol, Mayor LINE NO. THE CITY OF Dus Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation SRF ALLEY PROJECT - BID PAGtt 2 BID ITE M OE SCRIPTK N Division 1 - General Provisions 1 1090-105-0 Mobilization Division 2010 - E arthwork, Subgrade, and Subbase 2 2010-108-0-3 Topsoil, Off -ate Bid Date 20 -alar -11 PLAN QUANTITY UNIT 3 2010-108-E-0 Excavation, Class 13 4 2010-108-G-0 Subgrade Preparation 5 2010-108-1-0 Subbase, Special Backfill - Gradation 30 6 2010-108-1-0 Subbase, Granular Subbase - Gradation 12a 7 2010-108-1-0 Subbase, Porous Aggregate - Gradation 3 (ASTM 57) 8 2010-108-1-0 Subbase, Porous Aggregate - Gradation 13 (ASTM 2) 9 2010-108-A-0 Clearing and Grubbing A Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Drew Cook & Son's Excavating BID UNIT PRICE TOTAL PRICE McDermott Excavating BID UNIT PRICE TOTAL PRICE Horsefield Construction, Inc. BID UNIT PRICE TOTAL PRICE Eastern Iowa Excavating & Concrete, LLC BID UNIT PRICE TOTAL PRICE 1 LS $ 8,400.00 $ 8,400.00 $ 3,100.00 $ 3,100.00 $ 6,015.00 $ 6,015.00 $ 6,500.00 $ 6,500.00 $ 16,500.00 $ 16,500.00 23 CY $ 63.00 $ 1,449.00 $ 40.00 $ 920.00 $ 35.00 $ 805.00 $ 50.00 $ 1,150.00 $ 27.50 $ 632.50 1050 CY $ 11.00 $ 11,550.00 $ 9.00 $ 9,450.00 $ 15.80 $ 16,590.00 $ 11.00 $ 11,550.00 $ 11.20 $ 11,760.00 1900 SY $ 2.00 $ 3,800.00 $ 1.20 $ 2,280.00 $ 1.08 $ 2,052.00 $ 5.00 $ 9,500.00 $ 0.10 $ 190.00 350 TON $ 13.50 $ 4,725.00 $ 16.00 $ 5,600.00 $ 14.85 $ 5,197.50 $ 22.00 $ 7,700.00 $ 17.50 $ 6,125.00 240 TON $ 17.00 $ 4,080.00 $ 16.00 $ 3,840.00 $ 14.85 $ 3,564.00 $ 22.00 $ 5,280.00 $ 17.50 $ 4,200.00 650 TON $ 23.00 $ 14,950.00 $ 19.00 $ 12,350.00 $ 18.69 $ 12,148.50 $ 25.00 $ 16,250.00 $ 21.50 $ 13,975.00 1150 TON $ 31.00 $ 35,650.00 $ 26.00 $ 29,900.00 $ 24.95 $ 28,692.50 $ 28.00 $ 32,200.00 $ 28.50 $ 32,775.00 13.5 UNIT $ 37.04 $ 500.00 $ 18.52 $ 250.00 $ 48.15 $ 650.00 $ 375.00 $ 5,062.50 $ 192.60 $ 2,600.10 Division 4040 - Subdrains and Footing D rain Collectors 10 4040-108-A-0 Subdrain, 6" Perforated CPE 1000 LF $ 7.50 $ 7,500.00 $ 6.00 $ 6,000.00 $ 6.70 $ 6,700.00 $ 10.00 $ 10,000.00 $ 9.30 $ 9,300.00 11 4040-108-C-0 Groundwater Sampling Port 9 EA $ 300.00 $ 2,700.00 $ 300.00 $ 2,700.00 $ 365.00 $ 3,285.00 $ 500.00 $ 4,500.00 $ 455.00 $ 4,095.00 Division 7010 - Portland Cement Concrete Pavement 12 7010-108-A-0 Pavement, PCC, 7" (Thickness) 760 SY $ 55.00 $ 41,800.00 $ 40.00 $ 30,400.00 $ 37.40 $ 28,424.00 $ 36.00 $ 27,360.00 $ 55.70 $ 42,332.00 13 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 50 LF $ 25.00 $ 1,250.00 $ 20.00 $ 1,000.00 $ 19.80 $ 990.00 $ 25.00 $ 1,250.00 $ 21.30 $ 1,065.00 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 14 7030-108-A-0 Removal of Sidewalk 15 7030-108-E-0 Sidewalk, PCC, 4" (Thickness) 16 7030-108-E-0 Sidewalk, PCC, 6" (Thickness) 17 7030-108-G-0 Detectable Warning 18 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 19 7030-108-H-1 Driveway, Paved, HMA, 5" (Thickness) 125 SY $ 10.00 $ 1,250.00 $ 6.00 $ 750.00 $ 5.25 $ 656.25 $ 10.00 $ 1,250.00 $ 12.00 $ 1,500.00 90 SY $ 35.00 $ 3,150.00 $ 34.00 $ 3,060.00 $ 38.50 $ 3,465.00 $ 45.00 $ 4,050.00 $ 51.50 $ 4,635.00 40 SY $ 40.00 $ 1,600.00 $ 35.00 $ 1,400.00 $ 40.70 $ 1,628.00 $ 50.00 $ 2,000.00 $ 122.00 $ 4,880.00 112 SF $ 20.00 $ 2,240.00 $ 25.00 $ 2,800.00 $ 16.50 $ 1,848.00 $ 30.00 $ 3,360.00 $ 31.75 $ 3,556.00 225 SY $ 45.00 $ 10,125.00 $ 36.00 $ 8,100.00 $ 35.20 $ 7,920.00 $ 40.00 $ 9,000.00 $ 28.25 $ 6,356.25 12.6 SY $ 30.00 $ 378.00 $ 30.00 $ 378.00 $ 28.10 $ 354.06 $ 50.00 $ 630.00 $ 30.00 $ 378.00 Division 7040 - Pavement Rehabilitation 20 7040-108-H-0 Removal - Pavement 1765 SY $ 4.50 $ 7,942.50 $ 5.50 $ 9,707.50 $ 3.75 $ 6,618.75 $ 6.00 $ 10,590.00 $ 2.75 $ 4,853.75 21 7040-108-1-0 Removal - Curb and Gutter 22 7040-108-A-0 Full Depth Patches HMA 150 LF $ 8.00 $ 1,200.00 $ 6.50 $ 975.00 $ 4.00 $ 600.00 $ 5.00 $ 750.00 $ 4.50 $ 675.00 77 SY $ 45.00 $ 3,465.00 $ 40.00 $ 3,080.00 $ 40.40 $ 3,110.80 $ 45.00 $ 3,465.00 $ 43.00 $ 3,311.00 Division 7080 - Permeable Concrete Block Pauers 23 7080-108-A-0 Brick Pavement, Permeable, Type 1 10650 SF $ 5.50 $ 58,575.00 $ 3.75 $ 39,937.50 $ 3.94 $ 41,961.00 $ 4.00 $ 42,600.00 $ 4.00 $ 42,600.00 24 7080-108-E-1 Geotextile Fabric 2,270 SY $ 3.00 $ 6,810.00 $ 1.50 $ 3,405.00 $ 1.08 $ 2,451.60 $ 2.00 $ 4,540.00 $ 0.90 $ 2,043.00 IDOT Division 2528 -Traffic Control 25 IDOT 2528.04-A Traffic Control Division 9020 - Sodding 26 9020-108-A-0 Sod Division 9040 - E rosion and Sediment Control 27 9040-108-D-1 Filter Socks, 8" 1 LS $ 4,400.00 $ 4,400.00 $ 2,780.00 $ 2,780.00 $ 2,864.00 $ 2,864.00 $ 5,000.00 $ 5,000.00 $ 3,000.00 $ 3,000.00 22 SQ $ 125.00 $ 2,750.00 $ 135.00 $ 2,970.00 $ 142.00 $ 3,124.00 $ 135.00 $ 2,970.00 $ 155.00 $ 3,410.00 400 LF $ 2.00 $ 800.00 $ 3.50 $ 1,400.00 $ 4.50 $ 1,800.00 $ 5.00 $ 2,000.00 $ 2.00 $ 800.00 28 9040-108-0-2 Filter Socks, Removal 400 LF $ 4.00 $ 1,600.00 $ 1.50 $ 600.00 $ 1.75 :$ 700.00 $ 3.00 $ 1,200.00 $ 0.50 $ 200.00 29 9040-108-P-1 Dust Control, Water 22 loCAL $ 14.50 $ 319.00 $ 25.00 $ 550.00 $ 20.00 $ 440.00 $ 40.00 $ 880.00 $ 33.00 $ 726.00 % Ouer /under (-) Total Est. $ 244,958.50 Total Bid $ 189,683.00 -22.57% Total Bid $ 194,654.96 -20.54% Total Bid $ 232,587.50 -5.05% Total Bid $ 228,473.60 -6.73% Total Bid Amount $ 244,958.50 $ 189,683.00 $ 194,654.96 $ 232587.50 $ 228,473.60 Total Selected Alternate(s) Amount $ - $ - $ - $ - $ - Contract Award Amount: $ 244,958.50 $ 189,683.00 $ 194,654.96 $ 232587.50 $ 228,473.60 Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation SRF ALLEY PROJECT -810 PACK 2 810 ITEM OE SCRIPT ION Division 1 - General Provisions 1090-105-0 Mobilization Division 2010 - Earthwork, Subgrade, and Subbase 2010-108-0-3 Topsoil, 0ff-ate Bid Date 20 -Mar -14 Connolly Construction PLAN QUANTITY UNIT BID UNIT PRICE 2010-108-E-0 Excavation, Class 13 2010-108-8-0 Subgrade Preparation 2010-108-1-0 Subbase, Special Backfill - Gradation 30 2010-108-1-0 Subbase, Granular Subbase - Gradation 12a 2010-108-1-0 Subbase, Porous Aggregate - Gradation 3 (ASTM 57) 2010-108-1-0 Subbase, Porous Aggregate - Gradation 13 (ASTM 2) 2010-108-A-0 Clearing and Grubbing A Division 4040 - Subdrains and Footing 0 ra ih Collectors 4040-108-A-0 Subdrain, 6" Perforated CPE 4040-108-C-0 Groundwater Sampling Port Division 7010 - Portland Cement Concrete Pavement 7010-108-A-0 Pavement, PCC, 7" (Thickness) 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) Division 7030 - Sidewalks, Shared Use Paths, and Driveways 7030-108-A-0 Removal of Sidevalk 7030-108-E-0 Sidevalk, PCC, 4" (Thickness) 7030-108-E-0 Sidewalk, PCC, 6" (Thickness) 7030-108-8-0 Detectable Warning 7030-108-H-1 Drivevay, Paved, PCC, 6" (Thickness) 7030-108-H-1 Drivevay, Paved, HMA, 5" (Thickness) TOTAL PRICE Portzen Construction BID UNIT PRICE TOTAL PRICE Reuter Mechanical, INC dba East Iowa Construction Tschiggfrie Excavating BID UNIT PRICE TOTAL PRICE BID UNIT PRICE TOTAL PRICE 1 LS $ 10,295.00 $ 10,295.00 $ 9,000.00 $ 9,000.00 $ 10,000.00 $ 10,000.00 $ 12,207.00 $ 12,207.00 23 CY $ 37.00 $ 851.00 $ 65.00 $ 1,495.00 $ 48.00 $ 1,104.00 $ 25.65 $ 589.95 1050 CY $ 9.75 $ 10,237.50 $ 13.00 $ 13,650.00 $ 14.25 $ 14,962.50 $ 11.35 $ 11,917.50 1900 SY $ 3.35 $ 6,365.00 $ 0.85 $ 1,615.00 $ 1.00 $ 1,900.00 $ 2.15 $ 4,085.00 350 TON $ 24.00 $ 8,400.00 $ 17.00 $ 5,950.00 $ 17.90 $ 6,265.00 $ 18.30 $ 6,405.00 240 TON $ 24.00 $ 5,760.00 $ 17.00 $ 4,080.00 $ 17.90 $ 4,296.00 $ 18.45 $ 4,428.00 650 TON $ 27.00 $ 17,550.00 $ 20.00 $ 13,000.00 $ 19.90 $ 12,935.00 $ 23.90 $ 15,535.00 1150 TON $ 31.50 $ 36,225.00 $ 27.00 $ 31,050.00 $ 25.75 $ 29,612.50 $ 31.55 $ 36,282.50 13.5 UNIT $ 297.04 $ 4,010.04 $ 85.00 $ 1,147.50 $ 75.00 $ 1,012.50 $ 28.50 $ 384.75 1000 LF $ 12.75 $ 12,750.00 $ 10.00 $ 10,000.00 $ 8.00 $ 8,000.00 $ 10.85 $ 10,850.00 9 EA $ 525.00 $ 4,725.00 $ 550.00 $ 4,950.00 $ 500.00 $ 4,500.00 $ 368.00 $ 3,312.00 760 SY $ 40.00 $ 30,400.00 $ 42.00 $ 31,920.00 $ 48.50 $ 36,860.00 $ 51.50 $ 39,140.00 50 LF $ 21.00 $ 1,050.00 $ 32.00 $ 1,600.00 $ 26.25 $ 1,312.50 $ 24.95 $ 1,247.50 125 SY $ 7.70 $ 962.50 $ 12.00 $ 1,500.00 $ 5.00 $ 625.00 $ 5.10 $ 637.50 90 SY $ 40.55 $ 3,649.50 $ 40.00 $ 3,600.00 $ 39.25 $ 3,532.50 $ 39.45 $ 3,550.50 40 SY $ 42.85 $ 1,714.00 $ 75.00 $ 3,000.00 $ 48.25 $ 1,930.00 9 47.60 $ 1,904.00 112 SF $ 17.50 $ 1,960.00 $ 30.00 $ 3,360.00 $ 35.00 $ 3,920.00 :$ 23.15 $ 2,592.80 225 SY $ 37.05 $ 8,336.25 $ 50.00 $ 11,250.00 $ 48.25 $ 10,856.25 $ 54.20 $ 12,195.00 12.6 SY $ 31.00 $ 390.60 $ 29.00 $ 365.40 $ 29.50 $ 371.70 $ 28.30 $ 356.58 Division 7040 - Pavement Rehabilitation 7040-108-H-0 Removal - Pavement 1765 SY $ 4.75 $ 8,383.75 $ 8.00 $ 14,120.00 $ 6.00 $ 10,590.00 $ 6.65 $ 11,737.25 7040-108-1-0 Removal - Curb and Gutter 150 LF $ 6.70 $ 1,005.00 $ 7.00 $ 1,050.00 $ 5.00 $ 750.00 $ 5.05 $ 757.50 7040-108-A-0 Full Depth Patches HMA 77 SY $ 45.00 $ 3,465.00 $ 55.00 $ 4,235.00 $ 42.50 $ 3,272.50 $ 39.43 $ 3,036.11 Division 7080 - Permeable Concrete B lock Pavers 7080-108-A-0 Brick P avem ent, P erm eable, Type 1 7080-108-E-1 Geotextile Fabric IDOT D ivision 2528 - Traffic Control IDOT 2528.04-A Traffic Control Division 9020 - Sodding 9020-108-A-0 Sod Division 9040 - E rosion and Sediment Control 9040-108-D-1 Filter Socks, 8" 9040-108-0-2 Filter Socks, Removal 9040-108-P-1 Dust Control, Water 10650 SF $ 5.00 $ 53,250.00 $ 4.00 $ 42,600.00 $ 3.85 $ 41,002.50 $ 3.84 $ 40,896.00 2,270 SY $ 0.75 $ 1,702.50 $ 2.50 $ 5,675.00 $ 2.50 $ 5,675.00 $ 250 $ 5,675.00 1 LS $ 3,225.00 $ 3,225.00 $ 3,000.00 $ 3,000.00 $ 2,800.00 $ 2,800.00 $ 2,850.00 $ 2,850.00 22 SQ $ 160.00 $ 3,520.00 $ 140.00 $ 3,080.00 $ 80.00 $ 1,760.00 $ 138.40 $ 3,044.80 400 LF $ 5.65 $ 2,260.00 $ 3.00 $ 1,200.00 $ 3.00 $ 1,200.00 $ 2.75 $ 1,100.00 400 LF $ 4.35 $ 1,740.00 $ 1.00 $ 400.00 $ 2.00 $ 800.00 $ 1.15 $ 460.00 22 .IGAL $ 28.30 $ 622.60 $ 55.00 $ 1,210.00 $ 25.00 $ 550.00 $ 30.85 $ 678.70 Total Bid :$ 244,805.24 Total Bid $ 229,102.90 % 0ver /Under (-) -0.06% -6.47% Total Bid $ 222,395.45 Total Bid $ 237,855.94 -9.21 % -2.90% Total Bid Amount $ 244,805.24 $ 229,102.90 $ 222,395.45 $ 237,855.94 Total Selected Alternate(s) Amount $ - $ - $ - $ - Contract Award Amount: $ 244,805.24 $ 229,102.90 $ 222,395.45 $ 237,855.94