Sealed bids were received for the SRF Green Alley Bid Set 3 Project. City Engineer
Gus Psihoyos recommends award of the contract to the low bidder, Drew Cook and
Sons Excavating, in the amount of $590,556.50, which is 23.07% under the engineer's
estimate of probable cost. The majority of the cost savings was in the bid price of the
concrete pavement, stone and brick pavers Based on the bid results, it is hoped that
the final assessments levied to property owners will be reduced from the original
estimates due to the favorable bids received.
Based on the bid results, it is hoped that the final assessments levied to property
owners will be reduced from the original estimates due to the favorable bids received.
The average assessment, based on the engineer's estimate, including contingency and
engineering, was $930. If final costs hold with the bid results, the estimated average
assessment will be reduced to $715.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
brill/14 ,,,,,
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF
DUB J
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: March 27, 2014
SUBJECT: SRF Green Alley Bid Set 3
(CIP 7102450)
INTRODUCTION
The enclosed resolution authorizes the award of the construction contract for the SRF
Green Alley Bid Set 3 Project.
Dubuque
bikili
All -America City
i� 1
2007 • 2012 • 2013
DISCUSSION
Bid Set 3 will involve the reconstruction of nine alleys in the Bee Branch Watershed. The
alley locations are as follows:
• Johnson Street to Marshall Street (Between Rhomberg Avenue and Lincoln
Avenue) — 9 blocks
This project will reconstruct the third set of alleys for the SRF Green Alleys in the Bee
Branch Watershed. The Engineering Department and three private consulting firms are
working on the design and construction documents for the remainder of the alleys.
Additional construction bid sets will be developed in 2 to 10 alley groupings. The first
year of alley reconstructions include no utilities, except sewer manhole repairs where the
project affects them.
The reconstruction of the alleys will include:
— Removal of the existing alley pavement
— Excavation of the subgrade to allow the placement of clean washed stone for a
storage medium
— Installation of a concrete border for the brick pavers
— Installation of concrete headers at the alley intersection with the intersecting
streets.
— Reconstruction of the pavement surface with interlocking concrete pavers
This project will reconstruct the alleys into green alleys. These alleys allow rainwater to
infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows
for filtering of the water and recharge back into the aquifer. Monitoring wells are also
planned to be installed so that water quality improvements can be documented.
The project construction documents will follow the Statewide Urban Design and
Specifications (SUDAS) in the development of the construction documents.
The Iowa Department of Natural Resources (IDNR) have reviewed and approved the
plans so that the City cost can be covered with SRF funds.
This project will have special assessments.
BID RESULTS
The City of Dubuque received the following bids for the SRF Green Alley Project - Bid Set
3 on March 20, 2014:
Contractor Bid Results
Drew Cook and Sons Excavating $ 590,556.50
McDermott Excavating, Inc. $ 664,576.50
Horsfield Construction, Inc. $ 720,759.00
Eastern Iowa Construction $ 721,357.35
Portzen Construction, Inc. $ 730,622.50
Tschiggfrie Excavating, inc. $ 776,110.30
Connelly Construction $ 787,977.85
Based on the bid results it is hoped that the final assessments levied to property owners
will be reduced from the original estimates due to the favorable bids received. The
average assessment based on the engineers estimate, including contingency and
engineering is $930. If final costs hold with the bid results, the estimated average
assessment will reduce to $715.00.
RECOMMENDATION
I recommend that the contract for the for the SRF Green Alley Bid Set 3 Project be
awarded to Drew Cook and Sons Excavating of Dubuque, Iowa in the amount of
$590,556.50 which is 23.07% under the engineer's estimate of probable cost. The
majority of the cost savings was in the bid price of the concrete pavement, stone and
brick pavers. The IDNR have reviewed the bid tab and concur with the award of the
contract.
2
BUDGET IMPACT
The summary of cost for the SRF Green Alley Bid Set 3 Project is as follows:
Estimate Award
Construction Contract $767,622.00 $590,556.50
Contingency 76,762.00 59,055.65
Construction Engineering & Inspection 126,658.00 97,441.82
Total Project Cost $971,042.00 $747,053.97
The project funding summary is as follows:
Fund
CIP No. Fund Description Amount
7102450 SRF Green Alley Project $ 606,648.28
Special Assessment — Alley Improvement, Residential 129,740.89
Special Assessment — Alley Improvement, Commercial 10,664.80
Total Project Funding $747,053.97
ACTION TO BE TAKEN
I recommend that the City Council adopt the attached resolution awarding for the SRF
Green Alley Project Bid Set 3 to Drew Cook and Sons Excavating in the amount of
$590,556.50.
Prepared by Jon Dienst, PE
cc: Jenny Larson, Budget Director
Don Vogt, Public Works Director
John Klostermann, Street & Sewer Maintenance Supervisor
Deron Muehring, Civil Engineer II
Denise Ihrig, Environmental Engineer
3
RESOLUTION NO.111-14
AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY
BID SET 3 PROJECT
Whereas, sealed proposals have been submitted by contractors for the SRF Green
Alley Bid Set 3 Project (the Project) pursuant to Resolution No. 58-14 and Notice to
Bidders published in a newspaper published in the City of Dubuque, Iowa on the 7th day
of March, 2014.
Whereas, said sealed proposals were opened and read on the 20th day of March,
2014, and it has been determined that Drew Cook and Sons Excavating of Dubuque,
Iowa, with a bid in the amount of $590,556.50, is the lowest responsive, responsible
bidder for the Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That a Public Improvement Contract for the Project is hereby awarded to Drew Cook
and Sons Excavating and the City Manager is hereby directed to execute a Public
Improvement Contract on behalf of the City of Dubuque for the Project.
Passed, approved and adopted this 7th day of April, 2014.
Attest:
Kevi S. Firnstahl, CMC, City Clerk
Roy D. Buol, Mayor
11NE
00.
THE CITY OF
DUB
Masterpiece on the Mississippi
Project Name:
ITEM NUMBER
City of Dubuque, Iowa
Bid Tabulation
SRF ALLEYPROJECT- BID PACK3
810 ITEM DESCRIPTION
DKiaon 1- General Pro,sions
1 1090.105-D Mobil¢ation
Di,sion 2010 - Earthwork, Subgrade, and Subbase
2 2010.1013C-0 Clearing and Grubbing C
Bid Date
20 -Mar -14
PLAN
QUANTITY
UNIT
Engineers Estimate
E STIMATEU
UNLIT PRICE
TOTAL PRICE
Drew Cook & Sons Excavating
BID
UNIT PRICE
TOTAL PRICE
McDermott Excavating
BID
UNIT PRICE
TOTAL PRICE
Horsfield Construct, Inc.
810
UNIT PRICE
1 LS $ 18,000.00 $ 18,000.00 $ 8,200.00 $ 8,200.00 $ 25,563.00 $ 25,563.00 $ 10,000.00
TOTAL PRICE
Eastern Iowa Excavating & Concrete
LLC
610
UNIT PRICE
TOTAL PRICE
Prxtzen Construction, Inc.
BID
UNIT PRICE
TOTAL PRICE
Tschiggfrie E xcauating Co.
BID
UNLIT PRICE
TOTAL PRICE
10,000.00 $ 35,000.00 $ 35,000.00 $ 20,000.00 $ 20,000.00 $ 18,003.00 $ 18,003.00
1 LS $ 1,000.00 $ 1,000.00 $ 350.00 $ 350.00 $ 1 ,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 2,600.00 $ 2,600.00 $ 4,500.00 $ 4,500.00 $ 770.00 $ 770.00
3 2010.108-D-3 Topsoil, Off-site
4 2010.108.8-0 Excavation, Class 13
5 2010.108-G0 Subgrade Preparation
8 2010.10&10 Subbase, Special Badrfill- Gradation 30
7 2010.108.1.0 Subbase, Granular Subbase- Gradation 12a
38 CY $ 63.00 $ 2,394.00 $ 38.00 $ 1,444.00 $ 35.00 $ 1,330.00 $ 50.00 $ 1,900.00 $ 27.50 $ 1,045.00 $ 65.00 $ 2,470.00 $ 24.60 $ 934.80
3300 CY $ 11.00 $ 36,300.00 $ 7.00 $ 23,100.00 $ 15.80 $ 52,140.00 $ 11.00 $ 36,300.00 $ 11.20 $ 36,960.00 $ 13.00 $ 42,900.00 $ 10.80 $ 35,640.00
6100 SY $ 2.00 $ 12,200.00 $ 1.00 $ 6,100.00 $ 1.08 $ 6,588.00 $ 5.00 $ 30,500.00 $ 0.10 $ 610.00 $ 0.85 $ 5,185.00 $ 2.25 $ 13,725.00
1130 TON $ 13.50 $ 15,255.00 $ 16.00 $ 18,080.00 $ 14.85 $ 16,780.50 $ 18.00 $ 20,340.00 $ 17.50 $ 19,775.00 $ 17.00 $ 19,210.00 $ 18.45 $ 20,848.50
565 TON $ 17.00 $ 9,605.00 $ 16.00 $ 9,040.00 $ 14.85 $ 8,390.25 $ 18.00 $ 10,170.00 $ 17.50 $ 9,887.50 $ 17.00 $ 9,605.00 $ 19.40 $ 10,961.00
8 2010.108.1-0 Subbase. Porous Aggregate- Gradation (ASTM 57)
9 2010-108.1-0 Subbase, Porous Aggregate- Gradation 13(ASTM 2)
2000 TON $ 21.00 $ 42,000.00 $ 19.00 $ 38,000.00 $ 18.69 $ 37,380.00 $ 23.00 $ 46,000.00 $ 21.50 $ 43,000.00 $ 20.00 $ 40,000.00 $ 22.60 $ 45,200.00
3700 TON $ 28.00 $ 103,600.00 $ 25.00 $ 92,500.00 $ 24.95 $ 92,315.00 $ 28.00 $ 103,600.00 $ 28.50 $ 105,450.00 $ 27.00 $ 99,900.00 $ 28.40 $ 105,080.00
Di,sion 4040 - Subdrain and Footing Drain Collectors
10 4040-108-A0 Subdrain. 6" Perforated CPE
11 4040.1013C-0 Groundwater Sampling Port
12 4040-108-D-0 Subdrain Outlets and Connections, Com Drill,6"
3500 LF $ 7.50 $ 26,250.00 $ 5.00 $ 17,500.00 $ 6.70 $ 23,450.00 $ 9.00 5 31,500.00 $ 9.30 $ 32,550.00 $ 11.00 $ 38,500.00 $ 10.20 $ 35,700.00
27 EA $ 300.00 $ 8,100.00 $ 300.00 $ 8,100.00 $ 365.00 $ 9,855.00 $ 500.00 5 13,500.00 $ 455.00 $ 12,285.00 $ 550.00 $ 14,850.00 $ 367.00 $ 9,909.00
2 EA $ 400.00 $ 800.00 $ 400.00 $ 800.00 $ 700.00 $ 1,400.00 $ 300.00 5 600.00 $ 200.00 $ 400.00 $ 800.00 $ 1,600.00 $ 537.00 $ 1,074.00
13 6010-108-E-0
Di,sion 6010 - Structuresfor Sanitary and Storm Sewers
Manhole Adjustment Minor
Di,sion 7010 - Portland Cement Concrete Pavement
14 7010-108-A0 Pavement PCC ,7"(Thickness)
15 7010 -108 -EO Curb and Gutter,30' (Width), (Thickness)
3 EA $ 800.00 $ 2,400.00 $ 300.00 $ 900.00 $ 700.00 $ 2,100.00 $ 500.00 $ 1,500.00 $ 810.00 $ 2,430.00 $ 375.00 $ 1,125.00 $ 504.00 $ 1,512.00
2313 SY $ 55.00 $ 127,215.00 $ 40.00 $ 92,520.00 $ 37.40 $ 86,506.20 $ 36.00 $ 83,268.00 $ 55.70 $ 128,834.10 $ 39.00 $ 90,207.00 $ 48.65 $ 112,527.45
100 LF $ 25.00 $ 2,500.00 $ 20.00 $ 2,000.00 $ 19.80 $ 1,980.00 $ 20.00 $ 2,000.00 $ 21.30 $ 2,130.00 $ 28.00 $ 2,800.00 $ 25.25 $ 2,525.00
Dk inion 7030 - Sidewalks, Shared Use Paths, and Driveways
18 7030.1013RO Removal of Sidewak
17 7030-1013E0 Sidewak, PCC, 4' (Thickness)
18 7030.1013E0 Sidewak. PCC. (Thickness)
19 7030.10&60 Detectable Warning
20 7030.10&1,1 Driveway, Paved, PCC, (Thickness)
290 SY $ 10.00 $ 2,900.00 $ 6.00 $ 1,740.00 $ 5.25 $ 1,522.50 $ 7.00 $ 2,030.00 $ 12.00 $ 3,480.00 $ 10.00 $ 2,900.00 $ 6.55 $ 1,899.50
212 SY $ 35.00 $ 7,420.00 $ 34.00 $ 7,208.00 $ 38.50 $ 8,162.00 $ 34.00 $ 7,208.00 $ 51.50 $ 10,918.00 $ 40.00 $ 8,480.00 $ 43.25 $ 9,169.00
78 SY $ 40.00 $ 3,120.00 $ 35.00 $ 2,730.00 $ 40.70 $ 3,174.60 $ 45.00 $ 3,510.00 $ 122.00 $ 9,516.00 $ 75.00 $ 5,850.00 $ 45.00 $ 3,510.00
268 SF $ 20.00 $ 5,760.00 $ 25.00 $ 7,200.00 $ 16.50 $ 4,752.00 $ 30.00 $ 8,640.00 $ 31.75 $ 9,144.00 $ 30.00 $ 8,640.00 $ 23.60 $ 6,796.80
1,302 SY $ 45.00 $ 58,590.00 $ 36.00 $ 46,872.00 $ 35.20 $ 45,830.40 $ 32.00 $ 41,664.00 $ 28.25 $ 36,781.50 $ 42.00 $ 54,684.00 $ 51.75 $ 67,378.50
21 7030.10&1,1 Driveway. Paved. HMA 5' (Thickness)
50 SY $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 28.10 $ 1,405.00 $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 27.45 $ 1,372.50
Di,sion 7040 - Pavement Rehabilila.ion
22 7040.108-A0 Full Depth Patches HMA 192 SY
45.00 $ 8,640.00 $ 42.00 $ 8,064.00 $ 41.20 $ 7,910.40 $ 50.00 $ 9,600.00 $ 43.00 $ 8,256.00 $ 55.00 $ 10,560.00 $ 40.20 $ 7,718.40
23 7040.108 -HA Removal- Pavement
24 7040.10&40 Removal- Curb and Gutter
6.678 SY
377 LF
4.50 $ 30,042.00 $ 4.00 $ 26,704.00 $ 3.75 $ 25,035.00 $ 6.00 $ 40,056.00 $ 2.75 $ 18,359.00 $ 6.00 $ 40,056.00 $ 9.70 $ 64,757.20
8.00 $ 3,016.00 $ 6.00 $ 2,262.00 $ 4.00 $ 1,508.00 $ 4.00 $ 1,508.00 $ 4.50 $ 1,696.50 $ 4.00 $ 1,508.00 $ 4.05 $ 1,526.85
Di t9on 7080 - Permeable Concrete Block Payers
25 7060.10&/40 Br. Pavement, Permeable, Type 1
26 7080.10&/40 Brith Pavement, Permeable, Type 2
27 7080.10.0-1 Waterproofing, Surface Leveling
38450 SF $ 5.20 $ 189,540.00 $ 3.60 $ 131,220.00 $ 3.94 $ 143,613.00 $ 4.00 $ 145,800.00 $ 3.75 $ 136,687.50 $ 3.65 $ 133,042.50 $ 3.65 $ 133,042.50
505 SF $ 10.00 $ 5,050.00 $ 9.50 $ 4,797.50 $ 11.03 $ 5,570.15 $ 12.00 $ 6,060.00 $ 9.75 $ 4,923.75 $ 10.00 $ 5,050.00 $ 9.20 $ 4,646.00
1,300 SF $ 3.00 $ 3,900.00 $ 1.70 $ 2,210.00 $ 4.91 $ 6,383.00 $ 2.00 $ 2,600.00 $ 2.65 $ 3,445.00 $ 4.00 $ 5,200.00 $ 4.65 $ 6,045.00
28 7080.10.D-1 Waterproofing, Sealer
29 7060-108E-1 Geotextile Fabric
1,300 SF $ 2.00 $ 2,600.00 $ 0.70 $ 910.00 $ 1.00 $ 1,300.00 $ 1.00 $ 1,300.00 $ 2.35 $ 3,055.00 $ 4.00 $ 5,200.00 $ 0.65 $ 845.00
8,575 SY $ 3.00 $ 25,725.00 $ 1.20 $ 10,290.00 $ 1.75 $ 15,006.25 $ 2.00 $ 17,150.00 $ 0.90 $ 7,717.50 $ 2.00 $ 17,150.00 $ 2.55 $ 21,866.25
IDOT Di,sion 2505 - Guardrail Construction and Removal
30 IDOT2505O441 Steel Beam Guardrail Installation
31 1DOT250504.44 End Terminals Installation
32 1DOT2505040 Removal of Guardrail
55 LF $ 42.00 $ 2,310.00 $ 30.00 $ 1,650.00 $ 60.00 $ 3,300.00 $ 30.00 $ 1,650.00 $ 220.00 $ 12,100.00 $ 220.00 $ 12,100.00 $ 205.00 $ 11,275.00
4 EA $ 15.00 $ 60.00 $ 60.00 $ 240.00 $ 140.00 $ 560.00 $ 1,500.00 $ 6,000.00 $ 250.00 $ 1,000.00 $ 250.00 $ 1,000.00 $ 231.00 $ 924.00
55 LF $ 5.00 $ 275.00 $ 4.00 $ 220.00 $ 2.75 $ 151.25 $ 10.00 $ 550.00 $ 8.00 $ 440.00 $ 10.00 $ 550.00 $ 4.75 $ 261.25
1007 Di,aon 2528 - Traffic Control
33 IDOT2528O4A Traffic Control
Di,sion 6320 - Sodding
34 9020.10&/40 Sod
Di,sion 9340 - Erosion and Sediment Control
35 904610&/42 SWPPP Management
36 904610&/43 SWPPP Qualifying Rainfall Event Inspection
37 9040.108-D-1 Fixer Socks 8"
38 9040.10&0.2 Fixer Socks, Removal
39 9040.10&P-1 Dust Control, Water
1 LS $ 9,000.00 $ 9,000.00 $ 6,460.00 $ 6,460.00 $ 6,800.00 $ 6,800.00 $ 10,000.00 $ 10,000.00 $ 7,200.00 $ 7,200.00 $ 7,500.00 $ 7,500.00 $ 6,622.00 $ 6,622.00
25 SO $ 125.00 $ 3,125.00 $ 135.00 $ 3,375.00 $ 142.00 $ 3,550.00 $ 135.00 $ 3,375.00 $ 155.00 $ 3,875.00 $ 140.00 $ 3,500.00 $ 138.40 $ 3,460.00
1 LS $ 2,000.00 $ 2,000.00 $ 400.00 $ 400.00 $ 1 ,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 1,300.00 $ 1,300.00 $ 1,500.00 $ 1,500.00 $ 306.00 $ 306.00
12 EA $ 150.00 $ 1,800.00 $ 50.00 $ 600.00 $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 $ 115.00 $ 1,380.00 $ 250.00 $ 3,000.00 $ 80.00 $ 960.00
1,300 LF $ 2.00 $ 2,600.00 $ 2.50 $ 3,250.00 $ 4.50 $ 5,850.00 $ 4.00 $ 5,200.00 $ 2.00 $ 2,600.00 $ 3.00 $ 3,900.00 $ 2.75 $ 3,575.00
1,300 LF $ 4.00 $ 5,200.00 $ 1.00 $ 1,300.00 $ 1.75 $ 2,275.00 $ 2.00 $ 2,600.00 $ 0.50 $ 650.00 $ 1.00 $ 1,300.00 $ 1.75 $ 2,275.00
72 MGAL $ 14.50 $ 1,044.00 $ 10.00 $ 720.00 $ 20.00 $ 1,440.00 $ 40.00 $ 2,880.00 $ 33.00 $ 2,376.00 $ 50.00 $ 3,600.00 $ 20.40 $ 1,468.80
Total Est. $ 782,836.00 Total Bid $ 590,556.50 Total Bid $ 664,576.50 Total Bid $ 720,759.00 Total Bid $ 721 ,357.35 Total Bid $ 730,622.50 Total Bid $ 776,110.30
%Ova /Under (-) -24.56% -15.11% -7.93% -7.85% -6.67% -0.86%
Total Bid Amould $ 782,836.00 $ 590,556.50
Contract Award Amount: $ 782,836.00 $ 590,556.50
$ 664,576.50
$ 664,576.50
$ 720,759.00
$ 720,759.00
$ 721 ,357.35
$ 721,357.35
$ 730,622.50 $ 776,110.30
$ 730,622.50 $ 776,110.30
THE CITY OF
Du
Masterpiece on the Mississippi
Project Name:
ITEM NUMBER
City of Dubuque, Iowa
Bid Tabulation
SRF ALLEY PROJECT- BID PACK3
BID ITEM DESCRIPTION
D ivision 1 - General Provisions
1096105-D Mobildation
D ivision 2010 - Earthwork, Subgrade, and Subbase
2016106-C-0 Clearing and Grubbing C
Bid 0te
20. Mar -14
PLAN
QUANTITY
UNIT
Connolly Construction, Inc.
BID
UNIT PRICE
TOTAL PRICE
1 LS $ 9,095.00 $ 9,095.00
1 LS $ 5,580.00 $ 5,580.00
2010-103-0-3 Topsoil, Off-site
3316106-E-0 Excavation, Class 13
3316106-G-0 Subgrade Preparation
3316106-I-0 Subbase, Special Backfill- Gradation 30
3316106-I-0 Subbase, Granular Subbase- Gradation 12a
33 CY $ 36.95 $ 1,404.10
3303 CY $ 9.70 $ 32,010.00
8103 SY $ 3.35 $ 20,435.00
1133 TON $ 23.75 $ 26,837.50
585 TON $ 23.70 $ 13,390.50
3310.106-I-0 Subbase. Porous Aggregate- Gradation 3(ASTM 57)
2010.106-I-0 Subbase, Porous Aggregate- Gradation 13 (ASTM 2)
2003 TON $ 26.75 $ 53,500.00
3703 TON $ 31.20 $ 115,440.00
D itision4040- Subdrain and Footing Drain Collectors
4346108-A-0 Subdrain. 8' Perforated CPE
4346106-C-0 Groundwater Sampling Pod
4346106-0-0 Subdrain Outlets and Connections, Core Drill, 8'
3503 LF $ 12.65 $ 44,275.00
27 EA $ 525.00 $ 14,175.00
2 EA $ 600.00 $ 1,200.00
D ivision 6010 - Structuresf or Sanitary and Storm Severs
8016106-E-0 Manhole Adjustment. Minor
O itision7010- PntIn d Cement Concrete Fa.errrnt
7016106-A-0 Pavement, PCC, 7' (Thirknns)
7016106-E-0 Curb and Gutter, 30" (Width), 8" (Thirkness)
3 EA $ 130.60 $ 391.80
2313 SY $ 39.35 $ 91,016.55
103 LF $ 20.85 $ 2,085.00
O itision7030- Sidewalks, Shared Use P3hs, evd 0ri'.e nays
7036106-A.0 Removal of Sidewak
7036106-E-0 Sidewak, PCC, 4"(Thidrness)
7036103-E-0 Sidewak. PCC. 8" (Thirkness)
7036103-G-0 Detectable Warning
7036106-H-1 Driveway, Paved, PCC, 8"(Thirkness)
293 SY $ 7.70 $ 2,233.00
212 SY $ 40.50 $ 8,586.00
78 SY $ 42.80 $ 3,338.40
288 SF $ 15.00 $ 4,320.00
1,302 SY $ 37.00 $ 48,174.00
7036106-H-1 Driveway. Paved. HMA. 5"(Thirknns)
50 SY $ 30.88 $ 1,544.00
D ivision 7040 - Pavement Rehabilitation
7046103-A.0 Full Depth Patches HMA
192 SY $ 48.70 $ 9,350.40
7046106-H-0 Removal- Pavement
7046103.10 Removal- Curb and Gutter
8.878 SY $ 4.75 $ 31,711.00
377 LF $ 6.65 $ 2,507.05
O oasion 7080 - Permeable Concrete Block Pates
7086106-A.0 Briar Pavement. Permeable. Type 1
7086108-A.0 Briar Pavement, Permeable, Type
7086106-C-1 Waterproofing, Surface Leveling
35450 SF $ 5.00 $ 182,250.00
505 SF $ 12.15 $ 6,135.75
1,303 SF $ 2.00 $ 2,600.00
7086106-D-1 Waterproofing, Sealer
7086108-E-1 Geotextile Fabric
1,303 SF $ 0.85 $ 1,105.00
8,575 SY $ 0.75 $ 6,431.25
IDOT Division 2535- Guardrail Construction and Removal
IDOT2505.04-A-1 Steel Beam Guardrail Installation
IDOT 2505.04-A4 End Terminale Installation
I D OT 2505.04-D Removal of Guardrail
55 LF $ 230.80 $ 12,694.00
4 EA $ 259.65 $ 1,038.60
55 LF $ 8.85 $ 486.75
IDOT Division 2528- Tretfic Control
!DOT 2528.04-A Traffic Control
D ivision 9020 - Sodding
9326106-A.0 Sod
D ivision 9040 - Erosion and Sediment Control
9340.106-A-2 SWPPP Management
9340.106-A-3 SWPPP Qualifying Rainfall Event Inspection
9340.106-D-1 Fitter Soars, 8'
9046106.0.2 Fitter Soars, Removal
9343.106-P-1 Dust Control, Water
1 LS $ 7,455.00 $ 7,455.00
25 90 $ 155.80 $ 3,895.00
1 LS $ 2,689.00 $ 2,689.00
12 EA $ 309.35 $ 3,712.20
1,303 LF $ 5.60 $ 7,280.00
1,303 LF $ 4.30 $ 5,590.00
72 MGAL $ 28.00 $ 2,016.00
Total Bid $ 787,977.85
0/0 0,er / under (.) 0.66%
Total Bid Amount
Contract Award Armrant:
$ 787,977.85
$ 787,977.85