SRF Green Alley Project_Bid Set 3 - Year 1 AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 3 (CIP 7102450) DATE: March 26, 2014 Dubuque band AI -America City 11111r 2007 • 2012 • 2013 Sealed bids were received for the SRF Green Alley Bid Set 3 Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Drew Cook and Sons Excavating, in the amount of $590,556.50, which is 23.07% under the engineer's estimate of probable cost. The majority of the cost savings was in the bid price of the concrete pavement, stone and brick pavers Based on the bid results, it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. Based on the bid results, it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. The average assessment, based on the engineer's estimate, including contingency and engineering, was $930. If final costs hold with the bid results, the estimated average assessment will be reduced to $715. I concur with the recommendation and respectfully request Mayor and City Council approval. brill/14 ,,,,, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB J Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 27, 2014 SUBJECT: SRF Green Alley Bid Set 3 (CIP 7102450) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the SRF Green Alley Bid Set 3 Project. Dubuque bikili All -America City i� 1 2007 • 2012 • 2013 DISCUSSION Bid Set 3 will involve the reconstruction of nine alleys in the Bee Branch Watershed. The alley locations are as follows: • Johnson Street to Marshall Street (Between Rhomberg Avenue and Lincoln Avenue) — 9 blocks This project will reconstruct the third set of alleys for the SRF Green Alleys in the Bee Branch Watershed. The Engineering Department and three private consulting firms are working on the design and construction documents for the remainder of the alleys. Additional construction bid sets will be developed in 2 to 10 alley groupings. The first year of alley reconstructions include no utilities, except sewer manhole repairs where the project affects them. The reconstruction of the alleys will include: — Removal of the existing alley pavement — Excavation of the subgrade to allow the placement of clean washed stone for a storage medium — Installation of a concrete border for the brick pavers — Installation of concrete headers at the alley intersection with the intersecting streets. — Reconstruction of the pavement surface with interlocking concrete pavers This project will reconstruct the alleys into green alleys. These alleys allow rainwater to infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows for filtering of the water and recharge back into the aquifer. Monitoring wells are also planned to be installed so that water quality improvements can be documented. The project construction documents will follow the Statewide Urban Design and Specifications (SUDAS) in the development of the construction documents. The Iowa Department of Natural Resources (IDNR) have reviewed and approved the plans so that the City cost can be covered with SRF funds. This project will have special assessments. BID RESULTS The City of Dubuque received the following bids for the SRF Green Alley Project - Bid Set 3 on March 20, 2014: Contractor Bid Results Drew Cook and Sons Excavating $ 590,556.50 McDermott Excavating, Inc. $ 664,576.50 Horsfield Construction, Inc. $ 720,759.00 Eastern Iowa Construction $ 721,357.35 Portzen Construction, Inc. $ 730,622.50 Tschiggfrie Excavating, inc. $ 776,110.30 Connelly Construction $ 787,977.85 Based on the bid results it is hoped that the final assessments levied to property owners will be reduced from the original estimates due to the favorable bids received. The average assessment based on the engineers estimate, including contingency and engineering is $930. If final costs hold with the bid results, the estimated average assessment will reduce to $715.00. RECOMMENDATION I recommend that the contract for the for the SRF Green Alley Bid Set 3 Project be awarded to Drew Cook and Sons Excavating of Dubuque, Iowa in the amount of $590,556.50 which is 23.07% under the engineer's estimate of probable cost. The majority of the cost savings was in the bid price of the concrete pavement, stone and brick pavers. The IDNR have reviewed the bid tab and concur with the award of the contract. 2 BUDGET IMPACT The summary of cost for the SRF Green Alley Bid Set 3 Project is as follows: Estimate Award Construction Contract $767,622.00 $590,556.50 Contingency 76,762.00 59,055.65 Construction Engineering & Inspection 126,658.00 97,441.82 Total Project Cost $971,042.00 $747,053.97 The project funding summary is as follows: Fund CIP No. Fund Description Amount 7102450 SRF Green Alley Project $ 606,648.28 Special Assessment — Alley Improvement, Residential 129,740.89 Special Assessment — Alley Improvement, Commercial 10,664.80 Total Project Funding $747,053.97 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding for the SRF Green Alley Project Bid Set 3 to Drew Cook and Sons Excavating in the amount of $590,556.50. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer 3 RESOLUTION NO.111-14 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY BID SET 3 PROJECT Whereas, sealed proposals have been submitted by contractors for the SRF Green Alley Bid Set 3 Project (the Project) pursuant to Resolution No. 58-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 7th day of March, 2014. Whereas, said sealed proposals were opened and read on the 20th day of March, 2014, and it has been determined that Drew Cook and Sons Excavating of Dubuque, Iowa, with a bid in the amount of $590,556.50, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Drew Cook and Sons Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 7th day of April, 2014. Attest: Kevi S. Firnstahl, CMC, City Clerk Roy D. Buol, Mayor 11NE 00. THE CITY OF DUB Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation SRF ALLEYPROJECT- BID PACK3 810 ITEM DESCRIPTION DKiaon 1- General Pro,sions 1 1090.105-D Mobil¢ation Di,sion 2010 - Earthwork, Subgrade, and Subbase 2 2010.1013C-0 Clearing and Grubbing C Bid Date 20 -Mar -14 PLAN QUANTITY UNIT Engineers Estimate E STIMATEU UNLIT PRICE TOTAL PRICE Drew Cook & Sons Excavating BID UNIT PRICE TOTAL PRICE McDermott Excavating BID UNIT PRICE TOTAL PRICE Horsfield Construct, Inc. 810 UNIT PRICE 1 LS $ 18,000.00 $ 18,000.00 $ 8,200.00 $ 8,200.00 $ 25,563.00 $ 25,563.00 $ 10,000.00 TOTAL PRICE Eastern Iowa Excavating & Concrete LLC 610 UNIT PRICE TOTAL PRICE Prxtzen Construction, Inc. BID UNIT PRICE TOTAL PRICE Tschiggfrie E xcauating Co. BID UNLIT PRICE TOTAL PRICE 10,000.00 $ 35,000.00 $ 35,000.00 $ 20,000.00 $ 20,000.00 $ 18,003.00 $ 18,003.00 1 LS $ 1,000.00 $ 1,000.00 $ 350.00 $ 350.00 $ 1 ,000.00 $ 1,000.00 $ 5,000.00 $ 5,000.00 $ 2,600.00 $ 2,600.00 $ 4,500.00 $ 4,500.00 $ 770.00 $ 770.00 3 2010.108-D-3 Topsoil, Off-site 4 2010.108.8-0 Excavation, Class 13 5 2010.108-G0 Subgrade Preparation 8 2010.10&10 Subbase, Special Badrfill- Gradation 30 7 2010.108.1.0 Subbase, Granular Subbase- Gradation 12a 38 CY $ 63.00 $ 2,394.00 $ 38.00 $ 1,444.00 $ 35.00 $ 1,330.00 $ 50.00 $ 1,900.00 $ 27.50 $ 1,045.00 $ 65.00 $ 2,470.00 $ 24.60 $ 934.80 3300 CY $ 11.00 $ 36,300.00 $ 7.00 $ 23,100.00 $ 15.80 $ 52,140.00 $ 11.00 $ 36,300.00 $ 11.20 $ 36,960.00 $ 13.00 $ 42,900.00 $ 10.80 $ 35,640.00 6100 SY $ 2.00 $ 12,200.00 $ 1.00 $ 6,100.00 $ 1.08 $ 6,588.00 $ 5.00 $ 30,500.00 $ 0.10 $ 610.00 $ 0.85 $ 5,185.00 $ 2.25 $ 13,725.00 1130 TON $ 13.50 $ 15,255.00 $ 16.00 $ 18,080.00 $ 14.85 $ 16,780.50 $ 18.00 $ 20,340.00 $ 17.50 $ 19,775.00 $ 17.00 $ 19,210.00 $ 18.45 $ 20,848.50 565 TON $ 17.00 $ 9,605.00 $ 16.00 $ 9,040.00 $ 14.85 $ 8,390.25 $ 18.00 $ 10,170.00 $ 17.50 $ 9,887.50 $ 17.00 $ 9,605.00 $ 19.40 $ 10,961.00 8 2010.108.1-0 Subbase. Porous Aggregate- Gradation (ASTM 57) 9 2010-108.1-0 Subbase, Porous Aggregate- Gradation 13(ASTM 2) 2000 TON $ 21.00 $ 42,000.00 $ 19.00 $ 38,000.00 $ 18.69 $ 37,380.00 $ 23.00 $ 46,000.00 $ 21.50 $ 43,000.00 $ 20.00 $ 40,000.00 $ 22.60 $ 45,200.00 3700 TON $ 28.00 $ 103,600.00 $ 25.00 $ 92,500.00 $ 24.95 $ 92,315.00 $ 28.00 $ 103,600.00 $ 28.50 $ 105,450.00 $ 27.00 $ 99,900.00 $ 28.40 $ 105,080.00 Di,sion 4040 - Subdrain and Footing Drain Collectors 10 4040-108-A0 Subdrain. 6" Perforated CPE 11 4040.1013C-0 Groundwater Sampling Port 12 4040-108-D-0 Subdrain Outlets and Connections, Com Drill,6" 3500 LF $ 7.50 $ 26,250.00 $ 5.00 $ 17,500.00 $ 6.70 $ 23,450.00 $ 9.00 5 31,500.00 $ 9.30 $ 32,550.00 $ 11.00 $ 38,500.00 $ 10.20 $ 35,700.00 27 EA $ 300.00 $ 8,100.00 $ 300.00 $ 8,100.00 $ 365.00 $ 9,855.00 $ 500.00 5 13,500.00 $ 455.00 $ 12,285.00 $ 550.00 $ 14,850.00 $ 367.00 $ 9,909.00 2 EA $ 400.00 $ 800.00 $ 400.00 $ 800.00 $ 700.00 $ 1,400.00 $ 300.00 5 600.00 $ 200.00 $ 400.00 $ 800.00 $ 1,600.00 $ 537.00 $ 1,074.00 13 6010-108-E-0 Di,sion 6010 - Structuresfor Sanitary and Storm Sewers Manhole Adjustment Minor Di,sion 7010 - Portland Cement Concrete Pavement 14 7010-108-A0 Pavement PCC ,7"(Thickness) 15 7010 -108 -EO Curb and Gutter,30' (Width), (Thickness) 3 EA $ 800.00 $ 2,400.00 $ 300.00 $ 900.00 $ 700.00 $ 2,100.00 $ 500.00 $ 1,500.00 $ 810.00 $ 2,430.00 $ 375.00 $ 1,125.00 $ 504.00 $ 1,512.00 2313 SY $ 55.00 $ 127,215.00 $ 40.00 $ 92,520.00 $ 37.40 $ 86,506.20 $ 36.00 $ 83,268.00 $ 55.70 $ 128,834.10 $ 39.00 $ 90,207.00 $ 48.65 $ 112,527.45 100 LF $ 25.00 $ 2,500.00 $ 20.00 $ 2,000.00 $ 19.80 $ 1,980.00 $ 20.00 $ 2,000.00 $ 21.30 $ 2,130.00 $ 28.00 $ 2,800.00 $ 25.25 $ 2,525.00 Dk inion 7030 - Sidewalks, Shared Use Paths, and Driveways 18 7030.1013RO Removal of Sidewak 17 7030-1013E0 Sidewak, PCC, 4' (Thickness) 18 7030.1013E0 Sidewak. PCC. (Thickness) 19 7030.10&60 Detectable Warning 20 7030.10&1,1 Driveway, Paved, PCC, (Thickness) 290 SY $ 10.00 $ 2,900.00 $ 6.00 $ 1,740.00 $ 5.25 $ 1,522.50 $ 7.00 $ 2,030.00 $ 12.00 $ 3,480.00 $ 10.00 $ 2,900.00 $ 6.55 $ 1,899.50 212 SY $ 35.00 $ 7,420.00 $ 34.00 $ 7,208.00 $ 38.50 $ 8,162.00 $ 34.00 $ 7,208.00 $ 51.50 $ 10,918.00 $ 40.00 $ 8,480.00 $ 43.25 $ 9,169.00 78 SY $ 40.00 $ 3,120.00 $ 35.00 $ 2,730.00 $ 40.70 $ 3,174.60 $ 45.00 $ 3,510.00 $ 122.00 $ 9,516.00 $ 75.00 $ 5,850.00 $ 45.00 $ 3,510.00 268 SF $ 20.00 $ 5,760.00 $ 25.00 $ 7,200.00 $ 16.50 $ 4,752.00 $ 30.00 $ 8,640.00 $ 31.75 $ 9,144.00 $ 30.00 $ 8,640.00 $ 23.60 $ 6,796.80 1,302 SY $ 45.00 $ 58,590.00 $ 36.00 $ 46,872.00 $ 35.20 $ 45,830.40 $ 32.00 $ 41,664.00 $ 28.25 $ 36,781.50 $ 42.00 $ 54,684.00 $ 51.75 $ 67,378.50 21 7030.10&1,1 Driveway. Paved. HMA 5' (Thickness) 50 SY $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 28.10 $ 1,405.00 $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 30.00 $ 1,500.00 $ 27.45 $ 1,372.50 Di,sion 7040 - Pavement Rehabilila.ion 22 7040.108-A0 Full Depth Patches HMA 192 SY 45.00 $ 8,640.00 $ 42.00 $ 8,064.00 $ 41.20 $ 7,910.40 $ 50.00 $ 9,600.00 $ 43.00 $ 8,256.00 $ 55.00 $ 10,560.00 $ 40.20 $ 7,718.40 23 7040.108 -HA Removal- Pavement 24 7040.10&40 Removal- Curb and Gutter 6.678 SY 377 LF 4.50 $ 30,042.00 $ 4.00 $ 26,704.00 $ 3.75 $ 25,035.00 $ 6.00 $ 40,056.00 $ 2.75 $ 18,359.00 $ 6.00 $ 40,056.00 $ 9.70 $ 64,757.20 8.00 $ 3,016.00 $ 6.00 $ 2,262.00 $ 4.00 $ 1,508.00 $ 4.00 $ 1,508.00 $ 4.50 $ 1,696.50 $ 4.00 $ 1,508.00 $ 4.05 $ 1,526.85 Di t9on 7080 - Permeable Concrete Block Payers 25 7060.10&/40 Br. Pavement, Permeable, Type 1 26 7080.10&/40 Brith Pavement, Permeable, Type 2 27 7080.10.0-1 Waterproofing, Surface Leveling 38450 SF $ 5.20 $ 189,540.00 $ 3.60 $ 131,220.00 $ 3.94 $ 143,613.00 $ 4.00 $ 145,800.00 $ 3.75 $ 136,687.50 $ 3.65 $ 133,042.50 $ 3.65 $ 133,042.50 505 SF $ 10.00 $ 5,050.00 $ 9.50 $ 4,797.50 $ 11.03 $ 5,570.15 $ 12.00 $ 6,060.00 $ 9.75 $ 4,923.75 $ 10.00 $ 5,050.00 $ 9.20 $ 4,646.00 1,300 SF $ 3.00 $ 3,900.00 $ 1.70 $ 2,210.00 $ 4.91 $ 6,383.00 $ 2.00 $ 2,600.00 $ 2.65 $ 3,445.00 $ 4.00 $ 5,200.00 $ 4.65 $ 6,045.00 28 7080.10.D-1 Waterproofing, Sealer 29 7060-108E-1 Geotextile Fabric 1,300 SF $ 2.00 $ 2,600.00 $ 0.70 $ 910.00 $ 1.00 $ 1,300.00 $ 1.00 $ 1,300.00 $ 2.35 $ 3,055.00 $ 4.00 $ 5,200.00 $ 0.65 $ 845.00 8,575 SY $ 3.00 $ 25,725.00 $ 1.20 $ 10,290.00 $ 1.75 $ 15,006.25 $ 2.00 $ 17,150.00 $ 0.90 $ 7,717.50 $ 2.00 $ 17,150.00 $ 2.55 $ 21,866.25 IDOT Di,sion 2505 - Guardrail Construction and Removal 30 IDOT2505O441 Steel Beam Guardrail Installation 31 1DOT250504.44 End Terminals Installation 32 1DOT2505040 Removal of Guardrail 55 LF $ 42.00 $ 2,310.00 $ 30.00 $ 1,650.00 $ 60.00 $ 3,300.00 $ 30.00 $ 1,650.00 $ 220.00 $ 12,100.00 $ 220.00 $ 12,100.00 $ 205.00 $ 11,275.00 4 EA $ 15.00 $ 60.00 $ 60.00 $ 240.00 $ 140.00 $ 560.00 $ 1,500.00 $ 6,000.00 $ 250.00 $ 1,000.00 $ 250.00 $ 1,000.00 $ 231.00 $ 924.00 55 LF $ 5.00 $ 275.00 $ 4.00 $ 220.00 $ 2.75 $ 151.25 $ 10.00 $ 550.00 $ 8.00 $ 440.00 $ 10.00 $ 550.00 $ 4.75 $ 261.25 1007 Di,aon 2528 - Traffic Control 33 IDOT2528O4A Traffic Control Di,sion 6320 - Sodding 34 9020.10&/40 Sod Di,sion 9340 - Erosion and Sediment Control 35 904610&/42 SWPPP Management 36 904610&/43 SWPPP Qualifying Rainfall Event Inspection 37 9040.108-D-1 Fixer Socks 8" 38 9040.10&0.2 Fixer Socks, Removal 39 9040.10&P-1 Dust Control, Water 1 LS $ 9,000.00 $ 9,000.00 $ 6,460.00 $ 6,460.00 $ 6,800.00 $ 6,800.00 $ 10,000.00 $ 10,000.00 $ 7,200.00 $ 7,200.00 $ 7,500.00 $ 7,500.00 $ 6,622.00 $ 6,622.00 25 SO $ 125.00 $ 3,125.00 $ 135.00 $ 3,375.00 $ 142.00 $ 3,550.00 $ 135.00 $ 3,375.00 $ 155.00 $ 3,875.00 $ 140.00 $ 3,500.00 $ 138.40 $ 3,460.00 1 LS $ 2,000.00 $ 2,000.00 $ 400.00 $ 400.00 $ 1 ,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 1,300.00 $ 1,300.00 $ 1,500.00 $ 1,500.00 $ 306.00 $ 306.00 12 EA $ 150.00 $ 1,800.00 $ 50.00 $ 600.00 $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 $ 115.00 $ 1,380.00 $ 250.00 $ 3,000.00 $ 80.00 $ 960.00 1,300 LF $ 2.00 $ 2,600.00 $ 2.50 $ 3,250.00 $ 4.50 $ 5,850.00 $ 4.00 $ 5,200.00 $ 2.00 $ 2,600.00 $ 3.00 $ 3,900.00 $ 2.75 $ 3,575.00 1,300 LF $ 4.00 $ 5,200.00 $ 1.00 $ 1,300.00 $ 1.75 $ 2,275.00 $ 2.00 $ 2,600.00 $ 0.50 $ 650.00 $ 1.00 $ 1,300.00 $ 1.75 $ 2,275.00 72 MGAL $ 14.50 $ 1,044.00 $ 10.00 $ 720.00 $ 20.00 $ 1,440.00 $ 40.00 $ 2,880.00 $ 33.00 $ 2,376.00 $ 50.00 $ 3,600.00 $ 20.40 $ 1,468.80 Total Est. $ 782,836.00 Total Bid $ 590,556.50 Total Bid $ 664,576.50 Total Bid $ 720,759.00 Total Bid $ 721 ,357.35 Total Bid $ 730,622.50 Total Bid $ 776,110.30 %Ova /Under (-) -24.56% -15.11% -7.93% -7.85% -6.67% -0.86% Total Bid Amould $ 782,836.00 $ 590,556.50 Contract Award Amount: $ 782,836.00 $ 590,556.50 $ 664,576.50 $ 664,576.50 $ 720,759.00 $ 720,759.00 $ 721 ,357.35 $ 721,357.35 $ 730,622.50 $ 776,110.30 $ 730,622.50 $ 776,110.30 THE CITY OF Du Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation SRF ALLEY PROJECT- BID PACK3 BID ITEM DESCRIPTION D ivision 1 - General Provisions 1096105-D Mobildation D ivision 2010 - Earthwork, Subgrade, and Subbase 2016106-C-0 Clearing and Grubbing C Bid 0te 20. Mar -14 PLAN QUANTITY UNIT Connolly Construction, Inc. BID UNIT PRICE TOTAL PRICE 1 LS $ 9,095.00 $ 9,095.00 1 LS $ 5,580.00 $ 5,580.00 2010-103-0-3 Topsoil, Off-site 3316106-E-0 Excavation, Class 13 3316106-G-0 Subgrade Preparation 3316106-I-0 Subbase, Special Backfill- Gradation 30 3316106-I-0 Subbase, Granular Subbase- Gradation 12a 33 CY $ 36.95 $ 1,404.10 3303 CY $ 9.70 $ 32,010.00 8103 SY $ 3.35 $ 20,435.00 1133 TON $ 23.75 $ 26,837.50 585 TON $ 23.70 $ 13,390.50 3310.106-I-0 Subbase. Porous Aggregate- Gradation 3(ASTM 57) 2010.106-I-0 Subbase, Porous Aggregate- Gradation 13 (ASTM 2) 2003 TON $ 26.75 $ 53,500.00 3703 TON $ 31.20 $ 115,440.00 D itision4040- Subdrain and Footing Drain Collectors 4346108-A-0 Subdrain. 8' Perforated CPE 4346106-C-0 Groundwater Sampling Pod 4346106-0-0 Subdrain Outlets and Connections, Core Drill, 8' 3503 LF $ 12.65 $ 44,275.00 27 EA $ 525.00 $ 14,175.00 2 EA $ 600.00 $ 1,200.00 D ivision 6010 - Structuresf or Sanitary and Storm Severs 8016106-E-0 Manhole Adjustment. Minor O itision7010- PntIn d Cement Concrete Fa.errrnt 7016106-A-0 Pavement, PCC, 7' (Thirknns) 7016106-E-0 Curb and Gutter, 30" (Width), 8" (Thirkness) 3 EA $ 130.60 $ 391.80 2313 SY $ 39.35 $ 91,016.55 103 LF $ 20.85 $ 2,085.00 O itision7030- Sidewalks, Shared Use P3hs, evd 0ri'.e nays 7036106-A.0 Removal of Sidewak 7036106-E-0 Sidewak, PCC, 4"(Thidrness) 7036103-E-0 Sidewak. PCC. 8" (Thirkness) 7036103-G-0 Detectable Warning 7036106-H-1 Driveway, Paved, PCC, 8"(Thirkness) 293 SY $ 7.70 $ 2,233.00 212 SY $ 40.50 $ 8,586.00 78 SY $ 42.80 $ 3,338.40 288 SF $ 15.00 $ 4,320.00 1,302 SY $ 37.00 $ 48,174.00 7036106-H-1 Driveway. Paved. HMA. 5"(Thirknns) 50 SY $ 30.88 $ 1,544.00 D ivision 7040 - Pavement Rehabilitation 7046103-A.0 Full Depth Patches HMA 192 SY $ 48.70 $ 9,350.40 7046106-H-0 Removal- Pavement 7046103.10 Removal- Curb and Gutter 8.878 SY $ 4.75 $ 31,711.00 377 LF $ 6.65 $ 2,507.05 O oasion 7080 - Permeable Concrete Block Pates 7086106-A.0 Briar Pavement. Permeable. Type 1 7086108-A.0 Briar Pavement, Permeable, Type 7086106-C-1 Waterproofing, Surface Leveling 35450 SF $ 5.00 $ 182,250.00 505 SF $ 12.15 $ 6,135.75 1,303 SF $ 2.00 $ 2,600.00 7086106-D-1 Waterproofing, Sealer 7086108-E-1 Geotextile Fabric 1,303 SF $ 0.85 $ 1,105.00 8,575 SY $ 0.75 $ 6,431.25 IDOT Division 2535- Guardrail Construction and Removal IDOT2505.04-A-1 Steel Beam Guardrail Installation IDOT 2505.04-A4 End Terminale Installation I D OT 2505.04-D Removal of Guardrail 55 LF $ 230.80 $ 12,694.00 4 EA $ 259.65 $ 1,038.60 55 LF $ 8.85 $ 486.75 IDOT Division 2528- Tretfic Control !DOT 2528.04-A Traffic Control D ivision 9020 - Sodding 9326106-A.0 Sod D ivision 9040 - Erosion and Sediment Control 9340.106-A-2 SWPPP Management 9340.106-A-3 SWPPP Qualifying Rainfall Event Inspection 9340.106-D-1 Fitter Soars, 8' 9046106.0.2 Fitter Soars, Removal 9343.106-P-1 Dust Control, Water 1 LS $ 7,455.00 $ 7,455.00 25 90 $ 155.80 $ 3,895.00 1 LS $ 2,689.00 $ 2,689.00 12 EA $ 309.35 $ 3,712.20 1,303 LF $ 5.60 $ 7,280.00 1,303 LF $ 4.30 $ 5,590.00 72 MGAL $ 28.00 $ 2,016.00 Total Bid $ 787,977.85 0/0 0,er / under (.) 0.66% Total Bid Amount Contract Award Armrant: $ 787,977.85 $ 787,977.85