Loading...
Historic Old Main Street Lighting_Sidewalk ProjectTHE CITY OF DuB E MEMORANDUM ~-~~ February 28, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Historic Old Main Street -Lighting and Sidewalk Replacement Project CIP 3001633 -Main Street Sidewalk Improvements -Jones to Fifth Street CIP 3001627 -Main Street Historic Lighting (1st to 5th) City Engineer Gus Psihoyos is recommending approval of the plans, specifications, form of contract and the estimated cost, and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Historic Old Main Street Lighting and Sidewalk Replacement Project. This project provides for the replacement of all street lights and traffic signals from 1St Street to 5th Street. The replacement of the street lights and intersection lights will be with historic looking fixtures. It is planned to replace the existing street lights with 20 - 12' high historic street lights and 8 - 25' high historic intersection street lights. This lighting will be similar to what was installed at Washington Park. In conjunction with this lighting replacement, the project provides for the replacement of the existing sidewalk and pedestrian access curb ramps with buff colored sidewalk to match the historic downtown sidewalk standard. In addition, an asphalt street overlay of Main Street from 1St Street to 5th Street will be included as part of the 2007 Asphalt Paving Program and coordinated with this project. The property owners abutting the project limits will be directly assessed for the sidewalk removal and installation. The City of Dubuque will pay for the first two feet of the sidewalk directly behind the curb as part of the historic lighting portion of the project. The remaining ±9 feet of the project will be split 25% for the property owner, with the remaining 75% to be paid for with a Historic District Public Improvement Program (HDPIP) grant of $100,000. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~ C`/ ~G ~ ~, ~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM ~.~-~ February 26, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ~_ SUBJECT: Historic Old Main Street -Lighting and Sidewalk Replacement Project CIP 3001633 -Main Street Sidewalk Improvements -Jones to Fifth Street CIP 3001627 -Main Street Historic Lighting (1St to Stn) INTRODUCTION The enclosed resolutions are in reference to the public hearing on the Historic Old Main Street -Lighting and Sidewalk Replacement Project. BACKGROUND The current streetlights along Historic Old Main Street from 1St to Stn street are scheduled to be replaced due to there deteriorated condition and the increasing high maintenance costs. The sidewalks are also scheduled to be replaced to match the current downtown Main Street sidewalk design pattern. DISCUSSION This project provides for the replacement of all street lights and traffic signals from 1St Street to Stn Street. The replacement of the street lights and intersection lights will be with historic looking fixtures. It is planned to replace the existing street lights with 20 - 12' high historic street lights and 8 - 25' high historic intersection street lights. This lighting will be similar to what was installed at Washington Park. The project will include the total reconstruction of the traffic signals located at 3~d and Main and at 4tn and Main to include count-down pedestrian signals, pre-emption capabilities and battery backup systems along with fiber optic communications conduit. New historic lighting equipment and traffic control equipment have already been purchased for the project to eliminate the long lead time in ordering. These lighting controllers will also be able to support any future reconstruction of street lights around the Five Flags Center. In conjunction with this lighting replacement, the project provides for the replacement of the existing sidewalk and pedestrian access curb ramps with buff colored sidewalk to match the historic downtown sidewalk standard. In addition, an asphalt street overlay of Main Street from 1St Street to 5th Street will be included as part of the 2007 Asphalt Paving Program and coordinated with this project. The property owners abutting the project limits will be directly assessed for the sidewalk removal and installation. The City of Dubuque will pay for the first two feet of the sidewalk directly behind the curb as part of the historic lighting- portion of the project. The remaining ± 9 feet of the project will be split 25 percent (25%) for the property owner, with the remaining 75 percent (75%) to be paid for with a Historic District Public Improvement Program (HDPIP) grant of $100,000. This project will need to be constructed in multiple phases to accommodate the needs of the property owners abutting the project. Several property owners have voiced specific needs to limit the disruption of their business during the construction of the project. Engineering will incorporate in the plans as best as possible to limit the disturbance to the businesses on Lower Main by multi-phasing the project. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Historic Old Main Street -Lighting and Sidewalk Replacement Project. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Historic Old Main Street -Lighting and Sidewalk Replacement Project. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Laura Carstens, City Planner Dave Johnson, Assistant Planner David Ness, Civil Engineer Jon Dienst, Civil Engineer RESOLUTION NO. 140-07 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE HISTORIC OLD MAIN STREET -LIGHTING AND SIDEWALK REPLACEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Historic OId Main Street -Lighting and Sidewalk Replacement Project, in the estimated amount $598,367.52, are hereby approved. Passed, adopted and approved this 5th day of March Attest: Jeanne F. Schneider, CMC, City Clerk Roy D. Buol, Mayor RESOLUTION NO. 141-07 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE HISTORIC OLD MAIN STREET -LIGHTING AND SIDEWALK REPLACEMENT PROJECT Whereas, the City Council has proposed a Resolution of Necessity for the Historic Old Main Street -Lighting and Sidewalk Replacement Project has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: XX Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Preliminary Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of , 2007, next at 6:30 p.m. in the Public Library Auditorium, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adopted and approved this 5th day of March Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 142-07 RESOLUTION ADOPTING THE PRELIMINARY SCHEDULE OF ASSESSMENTS FOR THE HISTORIC OLD MAIN STREET - LIGHTING AND SIDEWALK REPLACEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheet(s), Pages 1 to Page 2 inclusive, are hereby determined to be the Preliminary Schedule of Proposed Assessments for the Historic Old Main Street -Lighting and Sidewalk Replacement Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 5th day of March, 2007 Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE, IOWA PROPOSED SCHEDULE Of VALUATION AND ASSESSMENTS February 13, 2007 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. PARCEL STREET VALUATION UNITS •LIN. TOTAL TOTAL HISTORIC HISTORIC TOTAL NET PROPERTY OWNER NAME LOT DESCRIPTION NUMBER ADDRESS ~~ ~' COSTlLINEAL SIDEWALK PRESERVATION PRESERVATION SIDEWALK IMPROVEMENT FOOT COST CREDIT/LIN. FT, CREDIT ASSESSMENT Meln 3Meet .hem tith fe dth Blue Moon Develo mant Com an Block 14 8 Lots A 8 8 Block 14 DBQ Downtown Ple 10.25-238-001 450 Main $ 8,830,000.00 241.23 $ 45.77 $ 11,041.10 S 11,041.10 Lot 1 8 2 Blocc 15 DBO Downtown Plaza -North City of Dubuque -Five Flags Center 10-25-215-003 Exempt 64.95 $ 90.36 S 5,868.88 $ 67.77 S 4,401.66 467.22 S 1 64.95 feet , City of Dubuque -Five Flags Center Lot 1 8 2 Block 15 DBO DowMOwn Plaza -South 192 93 f 10-25-215-003 Exempt 192.93 $ 84.30 $ 16,264.00 $ - S - $ 16,264.00 . eet Maln Street -from d}h to 3rd City Mission of Dubuque N 44' 3" of City Lot 12 10-25-241-001 398 Main S 176,390.00 44.25 $ 90.36 S 3,998.43 S 67.77 $ 2,998:82 S 999.61 WoIH, Clark W. Rev. Trust S. 20' of City Lol 12 10.25-241-002 378 Main S 206,600.00 20.00 $ 90.36 S 1,807.20 E 67.77 $ 1,355.40 $ 451.80 Willis, David A 8 Ellen M. N 1/3 of City Lot 11 10-25-241-003 372 Main S 132,000.00 21.42 S 90.36 E 1,935.51 E 67.77 $ 1,451.63 $ 483.88 Gard, Guy A S 2/3 of City Lot 17 10.25-241-004 356 Main S 260,400.00 42.83 S 90.36 E 3,870.12 $ 67.77 $ 2,902.59 $ 967.53 Althoff, Steven City Lot 10A 10-25-241-005 342 Main S 60,500.00 30.00 $ 90.36 E 2,710.80 E 67.77 $ 2,033.10 S 677.70 City of Dubuque Lot 1 Harbor View Place 10.25-241-014 330 Main Exempt 21.00 S 90.36 S 1,897.56 $ 67.77 $ 1,423.17 $ 474.39 Dubuque Area Chamber of Commer Unit 1 of Third 8 Main Condo boated on Lot 2 H 10.25-241-017 300 Main $ 939,400.00 64.25 $ 90.36 S 5,805.63 E 67.77 $ 4,354.22 $ 1,451.41 City of Dubuque Lot 3 Harbor View Place 10.25-241-018 Exempt 13.25 S 90.36 S 1,197.45 S 67.77 S 898.09 $ 299.36 Fiegen 8 Bisenius Inc. N 44' 6" of City Lot 69 10.25-240-006 395 Main $ 204,300.00 44.50 $ 90.36 $ 4,021.02 S 67.77 $ 3,015.77 S 1,005.26 Fiegen 8 Bisenius Inc. S 20' City Lot 68, N 28' 5" City Lot 70, S 20' City Lot 10-25-240-007 375 Main S 189,100.00 68.42 $ 90.36 $ 8,182.43 $ 67.77 $ 4,636.82 $ 1,545.61 Fiegen 8 Bisenius Inc. City Lot 70A 8 N 5' City Lot 71 10-25-240-006 351 Main S 29,500.00 21.00 S 90.36 $ 1,897.56 $ 67.77 $ 1,423.17 $ 474.39 Hayes, Kenneth 8 Charlotte S 19' of City Lot 71 8 N 8" of City Lot 71A 10.25-240.009 345 Main $ 137,000.00 19.67 $ 90.36 E 1,777.38 S 67.77 E 1,333.04 E 444.35 Plastic Center, Inc. S 39' 7" of Ciry Lot 71A 8 N 6' 9" of City Lot 72 10-25.240-010 327 Main S 36,200.00 46.33 $ 90.36 $ 4,186.38 $ 67.77 $ 3,139.78 $ 1,046.59 City of Dubuque S 25' S" of City Lot 72 8 City Lot 72A 10.25-240-011 301 Main Exempt 57.50 S 90.36 $ 5,195.70 S 67.77 S 3,896.78 $ 1,298.93 Maln Street - tram 3rd to 2nd Plastic Center, Inc. N 23' of Cit Lot 8 10.25-277-001 290 Main S 174,500.00 23.00 $ 90.36 $ 2,078.28 $ 67.77 $ 1,558.71 S 519.57 Plastic Center, Inc. M 19' 4" of City Lot 8 10.25-277-002 $ 23,300.00 19.33 $ 90.36 $ 1,746.66 $ 67.77 $ 1,309.99 E 436.66 Plastic Center, Inc. S 22' of City Lot 8 10.25-277-003 $ 15,400.00 22.00 S 90.36 S 1,887.92 $ 67.77 $ 1,490.94 S 496.98 Plastic Center, Inc. City Lots 5, 6 8 7 Lot A 8 Lot C Julien Hotel Plaza 10-25-277-004 200 Main S 1,121,600.00 192.75 $ 90.36 $ 17,416.69 $ 67.77 $ 13,062.67 $ 4,354.22 Cooper Devebpment Company LLC N 64' 3" of City Lot 73 10.25-276-007 299 Main $ 852,900.00 $ 90.36 $ - $ 67.77 $ - S - McCoy, Robert T. City Lots 74, S 48.25 of City Lot 73 8 N 6" of City Lo 10.25-276-008 261 Main $ 258,400.00 49.00 $ 90.36 $ 4,427.64 $ 67.77 $ 3,320.73 $ 1,106.91 Mihalakis, Louis P. 8 Margaret S 15' 6" City Lot 74A 8 City Lot 75 10-25-276-009 253 Main S 200,000.00 24.50 $ 90,36 $ 2,213.62 $ 67.77 $ 1,660.37 $ 553.46 Butt's Fbrist N 42' City Lol 75A 10-25-276-010 233 Main $ 189,700.00 42.00 $ 90.36 $ 3,795.12 $ 67.77 $ 2,846.34 S 948.78 Plastic Center, Inc. S 13' 3" of City Lot 75A and City Lot 76 10.25-276-011 $ 105,700.00 77.50 $ 90.36 $ 7,002.90 $ 67.77 $ 5,252.18 $ 1,750.73 ayo , .,, Msin Street -Nom 2nd to 1st Byrne, Robert L. 8 Cynthia N 1/2 City Lot 4A 10-25-282-001 198 Main S 288,900,00 20.25 $ 90.36 $ 1,829.79 S 67.77 S 1,372.34 S 457.45 Greenfield, Duaine H. 8 Jane M. 5 1/2 of City Lot 4A 10.25-282-002 190 Main S 274,000.00 20.25 $ 90.36 $ 1,829.79 S 67.77 $ 1,372.34 $ 457.45 Salwolke, Frank J. & Mary Ann City Lot 4 10.25-282-003 182 Mein S 130,400.00 24.00 S 90.36 E 2,168.64 E 67.77 $ 1,626.48 $ 542.16 Hhh Enterprises LLC N 1/2 of City Lot 3A 10-25282-004 180 Mein S 211,100.00 21.00 E 90.36 E 1,897.56 S 67.77 $ 1,423.17 S 474.39 Hhh Enterprisea LLC S 1/2 of City Lot 3A 10.25282-0OS 164 Main S 196,100.00 21.00 S 90.36 $ 1,897.56 S 67.77 S 1,423.17 $ 474.39 Digman, Ralph 8 Elaine N 8" - N 21' 6" of Cky Lot 2, City Lot 2A 8 City Lot 3 10-25282-0OB 156 Main $ 117,200.00 65.42 S 90.36 $ 5,911.35 S 67.77 S 4,433.51 S 1,477.84 Lower Main Development LLC S 20' 10" - N 21' 6" City Lol 2 10-25282-007 $ 27,600.00 20.83 $ 90.36 S 1,882.20 S 67.77 S 1,411.65 $ 470.55 Lower Main Development LLC N 43' 3" of City Lot 1 & S 6" of City Lot 2 10.25282-008 S 55,000.00 43.75 S 90.36 S 3,953.25 S 67.77 E 2,984.94 S 988.31 Main Street Development Co. LLC S 21' 6" of City Lot 1 10-25-282-009 100 Main S 357,700.00 21.50 S 90.36 S 1,942.74 E 67.77 S 1,457.06 S 485.69 Greenfield, Timothy J. N 30' 2" of City Lot 77 10-25281-008 195 Main $ 283,900.00 30.17 S 90.36 $ 2,726.16 S 67.77 S 2,044.62 S 681.54 Greenfield, Timothy J. S 10' of City Lol 77 8 N 16' 9" of City Lot 77A 10.25-281-009 165 Main S 136,700.00 17.58 $ 90.36 $ 1,568.53 S 67.77 $ 1,191.40 S 397.13 Kempthorne, Thornton Gary S 16' 11" 3/4" of City Lol 77A & N 2' 6" of City Lot 78 10-25-281-010 177 Main $ 121,600.00 19.48 E 90.36 $ 1,760.21 E 67.77 E 1,320.16 S 440.05 Lampe, Steve S 19' 6" - N 22' of City Lot 78 10.25281-011 169 Main $ 145,300.00 19.50 $ 90.36 $ 1,762.02 S 67.77 S 1,321.52 $ 440.51 Toth, Leslie J. S 22' 7" City Lot 78 10-25-261-012 163 Main S 142,000.00 22.58 S 90.36 S 2,040.33 S 67.77 $ 1,530.25 S 510.08 Lower Main Development LLC City Lot 78A, N 22' of City Lot 79 b NM 22' of City L 10.25281-013 137 Main S 1,183,400.00 24.30 S 90.36 E 2,195.75 S 67.77 S 1,648.81 S 548.94 K 8 E Partnership Llp SM 19' 4" of City Lot 79 10.25261-014 129 Main S 149,600.00 19.33 S 90.36 S 1,746.68 E 67.77 S 1,309.99 S 436.66 Kemp, Anthony 8 Barcick, William S 1' S" of City Lot 79 8 all of City Lot 80 10.25281-015 101 Main S 176,000.00 68.17 S 90.36 E 5,979.12 S 67.77 S 4,484.34 S 1,494.78 TOTALS: S 183,438.04 E 97,898.05 S 89,871.11 Page 2 of 2