HMA Resurfacing Project_White Street (11th to 21st)_Project AwardTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque band AI -America City r 2007 • 2012 • 2013 SUBJECT: White Street HMA Resurfacing with Milling Project, from 11th to 21st Street Iowa DOT Project No. NHSN-52-2(132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CIP 3602483, 7101335, 7201081, 3001615, 3602442, 7401405 DATE: April 14, 2014 Sealed bids were received for the White Street HMA Resurfacing with Milling Project from 11th to 21st Street. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, River City Paving, in the amount of $1,088,819.59, which is 2.24% over the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. 1„.1-t44 .,„ Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque AU -America City 11111 2007 • 2012 • 2013 SUBJECT: White Street HMA Resurfacing with Milling Project, from 11th to 21st Street Iowa DOT Project No. NHSN-52-2(132)--2R-31 Iowa DOT Agreement No. 2014-16-271 CIP 3602483, 7101335, 7201081, 3001615, 3602442, 7401405 DATE: April 11, 2014 INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the White Street HMA Resurfacing With Milling Project, from 11th to 21st Street. DISCUSSION The White Street Resurfacing Project, from 11th to 21st Street will provide for the following improvements: • Pavement milling on U.S. 52 (White Street) between 11th and 21st Street. • Transverse and longitudinal joint repair as needed. • Pavement sub -base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer intake reconstruction. • Installation of ADA pedestrian access curb ramps (37 total). • Water main improvements. • Traffic signal improvements at 14th 17th and 20th. Through the cooperative agreement, the Iowa DOT will be responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street). The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. BID RESULTS Sealed bids were received on the project on April 10, 2014. River City Paving of Dubuque, Iowa submitted the low bid in the amount of $1,088,819.59. This amount is 2.24% over the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Bid River City Paving $1,088,819.59 Tschiggfrie Exc. Co. $1,348,279.64 PUBLIC OUTREACH The City hosted a public information meeting on Thursday, April 3rd, at Prescott School's Neighborhood Resource Center. City staff provided an overview of the White Street Resurfacing Project to those impacted along the corridor, reviewed the proposed traffic control plan as well as vehicular / pedestrian access, reviewed the project schedule, and responded to feedback and questions. Engineering will be hosting construction update meetings for property owners along the corridor. RECOMMENDATION I recommend that the contract be awarded to River City Paving in the amount of $1,088,819.59. BUDGET IMPACT The summary of project costs for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street is as follows: Cost Estimate Award Construction Contract $1,065,005.77 $1,088,819.59 Contingency $106,500.58 $108,881.96 Design, Construction Engineering & Inspection $106,500.58 $108,881.96 Total Project Cost $1,278,006.93 $1,306,583.51 The project funding summary is as follows: CIP No. Fund Description 3602483 Iowa DOT Funding 3602483 Hwy 52 - White Street Pavement Rehabilitation 7201081 Catch Basin Replacement 7101335 Sanitary Manhole Replacement 3001615 Pre -purchased Traffic Signal Equipment - Mastarms 3602442 Pre -purchased Traffic Signal Equipment - Cabinets 3001615 Traffic Signal Intersection Reconstruction 7401405 Water Main Replacement Total Project Funding Fund Amount $ 464,410.24 518,921.62 46,140.61 8,526.41 14,384.00 45,717.00 122,702.13 85,781.50 $ 1,306,583.51 ** The City currently has $548,900 budgeted in FY14 to cover the City's portion of the pavement rehabilitation costs and all other associated costs, such as engineering design, contract administration, construction engineering and inspection. ** The funding sources identified to cover the associated costs for the traffic signal improvements at 14th,17th and 20th Streets are listed below. To simplify the allocation and tracking of project costs, the CIP amounts listed below will be transferred to the Traffic Signal Intersection Reconstruction CIP (3001615) as part of the FY14 Budget Amendment Process. CIP No. Fund Description 3001615 Traffic Signal Intersection Reconstruction 3001266 Traffic Signal Innerconnect Conduit Replacement 3001017 Traffic Optic Conduit - Paving Projects 3001133 Traffic Signal Mastarm Retrofit 2501916 LED Re -Lamp Schedule 3001549 Street Light Replacement / New City Owned 3001011 Signalization Program Total Project Funding ACTION TO BE TAKEN Fund Amount $ 22,266.76 10,000.00 9,227.00 42,719.76 10,000.00 10,000.00 18,488.61 $ 122,702.13 I recommend that the City Council adopt the attached resolution awarding the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street, to River City Paving in the amount of $1,088,819.59. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Dave Ness, Traffic Engineer Greg Doeden, Civil Engineer Duane Richter, Civil Engineer RESOLUTION NO. 124-14 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE WHITE STREET HMA RESURFACING WITH MILLING PROJECT FROM 11TH TO 21ST STREET IOWA DOT PROJECT NO. NHSN-052-2(132)--2R-31 Whereas, sealed proposals have been submitted by contractors for the White Street HMA Resurfacing with Milling Project, from 11th to 21st Street, Iowa DOT Project No. NHSN-052-2(132)--2R-31 (the Project) pursuant to Resolution No. 84-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 21st day of March, 2014; and Whereas, said sealed proposals were opened and read on the 10th day of April, 2014 and it has been determined that River City Paving of Dubuque, Iowa, with a bid in the amount of $1,088,819.59, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA, THAT: Section 1: A Public Improvement Contract for the Project is hereby awarded to River City Paving and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 21st day of April, 2014. Attest: Ke in S. Firnstahl, C C, City Clerk Roy D. Buol, Mayor City of Dubuque - Engineering Division Bid Tab PROJECT: White Street H MA Resurfacing With Milling From 11th 0040000 21st Steet Project No. N HS N-52-2(132}20-31 BID ITEM DESCRIPTION UNIT ESTIMATE QUANTITY ROADWAY ITEMS BID DATE: Apti 10, 2014 BIDDER: BIDDER: ESTIMATE UNIT COST ESTIMATE COST River City Paving UNIT COST TOTAL COST Tschlggfne Exc. Co. UNIT COST TOTAL COST Otto 2101-0850002- Gearing and Grubbing UNIT 1608 0020 2105&425005- Topsoil, Furnish & Spread CV 17.89 0030 2212-0475095- Cleaning and Preparation of Base MILE 062 0040 22125070310- Patch, Full -Depth Repair SV 1,160 0050 22125075001- Hot Mix Asphalt Surface Patches TON 35 0060 22145145150- Pavement Scarification SV 15,690 0070 2303-0000100- HMA Commercial Mix( Includes Asphalt Bin der), As Per Plar TON 100 0080 2303-0002380- HMA Interlayer Base, 3/8 IN. TON 860 0090 2303-0041500- HMA (3,000,000 ESAL), Base Course, 1/2- IN. Mix TON 1,450 Otto 2303-0043500- HMA (3,000,000 ESAL), Surface Course, 1/2 - IN. Mix, NO FRI C RED TON 1,365 Otto 2303-0246428- Asphalt Bin der, PG 64-28 TON 16890 0120 2303-0246434- Asphalt Bin der, PG 64-34 TON 7740 0130 2303-6911000- HMA Pavement Samples LS 1 0140 2510-6745850- Removal of Pavement SV 1,280 0150 2511-6745900- Removal of Sidewalk SV 1,080 0160 2511-7526004- SIdewalk, PCC, 4 -IN. SV 810 0170 2511-7526006- SIdewalk, PCC, 6 -IN. SV 280 0080 2511-7528101- Detectable Warnings SF 680 0090 2512-1725256- Curb and Gutter, P.C. Concrete, 25 FT. LF 1,190 0200 2515-2475006- Driveway, P.C. Concrete, 6 IN. SV 25.00 0200 2515-6745600- Removal of Paved Driveway SV 25.00 0220 2527-9263109- Painted Pavement Marking, Waterborne or Solvent Based STA 54.75 0230 2527-9263137- Painted Symbols and Legends, Waterborne or Solvent Based EACH 2 0240 2528-8445110- Traffic Control LS 1 0250 2528-8445113- Flaggers EACH 20 0260 2533-4980005 - Mobilization LS 1 0270 2601-2639010 - Sodding 60 14.65 0280 2601-2643110- Watering for Sod, Special Ditch Control or Slope Protection MGAL 12.892 0290 2602-0000312- Perimeter and Slope Sediment Control Device, 12 IN. DI A LF 410 0300 2602-0000350- Removal of Perimeter and Slope Sediment Control Device LF 410 0300 2010 -108 -I -0 -Subbase, Granular Subbase - Gradation 12a TON 2,295 0320 2010 -108 -I -0 -Subbase, Coarse Aggregate Subbase - 3" Breaker TON 100 0330 2599-9999005- Water Valve Fixture, Adjustment EACH 14 0340 2599-9999005- Epoxy Coated Deformed Tie Bar, 5/8 -Inch, 24' EACH 2,395 0350 9080-108-6-0- Hand Rail (Galvanized, Black Powder Coating ) LF 21.00 0360 2599-9999009- PCC Barrier Curb, 6"Vide LF 320 0370 2599-9999009- Sawcut, Full -Depth ,Concrete & HMA/Concrete Composite Pavement LF 5,980 0380 2599-9999009- Milling Transverse Joints LF 1,285 0390 2599-9999009- Milling Longitudinal Joints LF 1,440 0400 2599-9999009- Steel Railing, Remove LF 26 0400 2599-9999010- Safet/ Wedge Cut LS 1 0420 2599-9999010- Milling Mobilization LS 1 0430 2599-9999014- Concrete Steps, Remove SF 265 0440 9080-108-A-0 - Concrete Steps, Type A SF 1136 0450 2599-9999014-Remove,Salvage & Replace Brick Pavers SF 75 0460 2599 -9999014 -Remove& Replace Segmental Block Retaining Wall SF 10.72 0470 2599-9999014- Wooden Step with Wooden Rail SF 4 0480 2599-9999014 - Concrete Retaining Wall SF 134 0490 2599-9999014- Water Proofing, Surface Leveling & Sealer SF 50 0500 2599-9999020- HMA Joint Repair, 3" Depth (Max. ) TON 110 3520 $ 5,56016 55.00 $ 98395 935.00 $ 57970 57.00 $ 66,120 00 385.00 $ 1847500 4.00 $ 62,76000 98.00 $ 9,80000 46.00 $ 39,56000 4450 $ 64,52500 45.00 $ 61,42500 615.00 $ 103,87350 66850 $ 51241 90 2,75000 $ 2,25000 750 $ 9,60000 695 $ 7,50680 29.70 $ 24857.00 35.00 $ 9,80000 2200 $ 14,96000 15.00 $ 17,85000 4330 $ 088250 17.60 $ 44000 55.00 $ 3,01125 9350 $ 08700 18,78500 $ 08,78500 330.00 $ 6,50000 22,08000 $ 22,08000 77.00 $ 1,12805 55.00 $ 70906 215 $ 881 50 036 $ 04760 1540 $ 35,34300 17.00 $ 0,20000 100.00 $ 0,40000 330 $ 7,90350 110.00 $ 2,30000 1850 $ 592000 355 $ 20,22000 1650 $ 20,20250 545 $ 7,84800 5.00 $ 03000 1,50000 $ 0,50000 1650 00 $ 0,55000 5.00 $ 03250 160.00 $ 1,81730 20.00 $ 0,50000 50.00 $ 53600 125.00 $ 50000 50.00 $ 6200 00 8.00 $ 40000 14440 $ 15,88400 $24 50 $15080 $1,50080 $6225 $35080 $355 $5500 840 75 84199 84199 8560 00 $67400 $250080 $1650 $780 843 65 $1650 $28 50 $2890 843 65 $1600 $5600 $10080 $19,74080 $33580 $26,00080 $125.00 $195 00 $880 $280 $1550 $21 50 $12080 $550 $135 00 $28 50 $155 $1097 $974 $2800 $80080 $424080 $2325 $123.00 $2800 848 00 Si o0 00 $55 00 $1800 $5500 $3,939 60 $2,683 50 $930 00 $72,21000 $12,250 00 $55,699 50 $9,500 00 $37,625.00 $60,88550 $57,31635 $55,09070 $5216780 $250000 $21,120 00 $7,56600 $35,35650 $13,020 00 $19,38000 $2844100 $1,091 25 $400 00 $4,92750 $20000 $19,74000 $670000 $26,00000 $1,831 25 $2,51894 $328000 $82000 $3557250 $215000 $588000 $1317250 $283500 $9,12000 $9,269 00 $14,09645 $14,025.60 $52000 $80000 $424000 $61613 $1431 36 $1,50000 $514 56 $400 00 $737000 $650 00 $10,45000 $58 00 $2845 $1,57500 $12240 $367 50 $320 $5975 $1595 $44.10 $44.10 $591.15 $70770 $2,41500 $1045 $520 844 60 $58 65 $34 65 $22 55 $6665 $780 $5450 $10500 $2622780 $33580 $8620080 $21080 $105 00 $4 20 $055 $2870 $1945 $73880 $330 $78 75 $1520 $380 $11 50 $1625 $1585 $84080 $4,45280 $29.50 $60 25 $2625 $105 00 $78 75 $3270 $630 $5975 $932640 $50897 $97650 $141,98400 $12,862.50 $5620800 $9,97500 $39,517 00 $63,945 00 $60,19650 $59,84524 $54,77598 $241500 $13,37600 $5,61600 $36,123.00 $16,42200 $23,562.00 $26,834 50 $1,66625 $19500 $5,17388 $210 00 $207D80 $670000 $8620000 $3,07650 $1,35366 $172200 $22550 $17,50650 $1,94500 $10,33200 $790350 $1,65375 $4,864 00 $17,94000 $14,77750 $14,76000 $41210 $84000 $445200 $78175 $77532 $196875 $1,12560 $31500 $5,051 80 $31500 $10,972 50 STORM SEWER ITEMS 0500 2435-0600010- Manhole Adjustment, Minor EACH 20 648.00 $ 12,96000 857500 $09,50000 0520 2503-0114212- Storm SWR, G -Main, Trenched, RCP, 12 IN. LF 55 4850 $ 2,66750 811375 85,25625 0530 2503-0114215- Storm SWR, G -Main, Trenched, RCP, 15 IN. LF 40 43.70 $ 0,24800 802435 84,99400 0540 2503-0200036- Remove Storm Sewer Pipe Less Than or Equal to 361N LF 95 15.00 $ 0,42500 82025 82,00875 0550 2510-6750600- Removal of makes and Uti lily Accesses EACH 15 360.10 $ 5,40050 $48500 87,27500 0560 4020-108-A-0 - Concrete Collar Connection - Type PC -1 EACH 1 306.00 $ 30600 $38550 $38550 0570 4020-108-A-0 - Concrete Collar Connection - Type PC -2 EACH 14 306.00 $ 4,28400 838550 85,69700 0580 2599-9999005- Intake 101-15 EACH 9 216000 $ 0944000 80,28500 $06,055.00 0550 2599-9999005- Intake 101-B, Special EACH 6 2,80000 $ 06,80000 82,00500 $02,69000 0500 2599-9999005- Intake 101-B, Construct New Concrete Top EACH 1 850.00 $ 85000 $0,225.00 80,22500 0610 2599-9999005- Storm Water Curb Opening EACH 18 100.00 $ 0,80000 820500 83,87000 $68000 $13,60000 $5180 85,00500 $5300 $3,72000 $18.10 $1,1950 $60000 89,00000 $55000 $95000 $55000 $13,30000 $3,64000 $32,76000 $4,38000 $26,28000 $1,66000 $1,66000 $32000 $576000 x H O e 0 0 m X 10 m D X co A X co X D (339 CO m D co m 121 121 CO 0 0 V 323 0 raa O V CO S C 0 O O 0 Z Z m 0 O CO Cil 0 y H C z co z z 0 r C Z co z W 121 0 Z m D co z m n 121 v 0 O Z co D A r O O CO y Z O O 121 CO 363 8 0 Z co c O O m Z y co O m Cr I 3613 121 z O O O y D CO cor O C Z O 0 121 m m D m H co 0 O y r C z m 121 z O O r co m co co O SESSESEmmmmgmEEE22222222228777” m m m O m y z O co co Z O CO121CO D m co D co O Z 0 O z 121 Cil Cil n co D co co mm co O co m co co raa y_ co 0 O Cr I 0 O Cr I 0 O Cr I 0 O Cr I 0 O O O ao n H m m Z O CO Cr I O O ao n H m m Z O H z V coC m n CO 1 z z com O Cr I H z z co 0 CO Cr I O m O z A C y Z O CO 323 O C D m m m Cr I CO 0 O V A m r N o Cr I Cr I 353 Cr I Cr I 3-3 0 O O O Z CO D CO D C CO O 1)1 Cil z co D 0 O m y r -11O CO D 121 CO A O O O y D A D O ca m r O O D 0 121 CO Cil Cil n CO CO H O CO CO O z D m n CO CO D m CO O Z m O 0 O Cr I Cil Cil z CO D m CO O Z m O 0 O z Cil Cil A O O O Z CO D m O 0 m CO Cil Cil A O O m O Z CO D O C Z O O m O m CO Cil Cil A O O O Z CO D y ao O Cil Cil A O O m O Z CO D O C Z O O y 0 363 Cil z co D 0 co0 A CO O 0 m O y O D O Cr I Cr I Cr I 0 y 0 m coO Cil Cil N m O co z D m O co O aa H V n SW311213MBS A21V1INVS b th th b th th -33 L th r L th r rno 33 353 -33 -33 33