Loading...
Jule Transit Facility Roof and Sprinkler Repair Project_InitiateTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Jule Transit Facility Roof & Sprinkler Repair Project (CIP 6001613) DATE: May 15, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Director of Transit Operations Candace Eudaley recommends initiation of the bidding process for the Jule Transit Facility Roof & Sprinkler Repair Project, and further recommends that a public hearing be set for June 2, 2014. I concur with the recommendation and respectfully request Mayor and City Council approval. .1„.1-t44 ,,,,, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Candace Eudaley, Director of Transit Operations Maurice Jones, Economic Development Director THE CITY OF Dui E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Candace Eudaley, Director of Transit Operations DATE: May 10, 2014 RE: Jule Transit Facility Roof & Sprinkler Repair Project (CI P 6001613) INTRODUCTION Dubuque ktratd All -America City '1 111! 2012 The enclosed resolutions authorize the public hearing procedure for the Jule Transit Facility Roof & Sprinkler Repair Project. BACKGROUND In 2010 a fire inspection of the overhead sprinkler system in the maintenance and storage area of the facility determined the system was out of code. The inspector noted that the majority of the sprinkler heads were at least 50 years old; that there were no sprinkler heads hanging over the garage doors and that the entire sprinkler system was over -due for a five year test. These factors caused the fire inspector to require that the Jule sprinkler system be brought up to current fire code standards. Also in 2010, the Jule transit facility received significant storm damage that required the replacement of the southern section of the roof which was replaced in approximately 1988. The north and center sections of the roof are also deteriorating with leaks in the roof sections causing brickwork in the walls of the facility to dissolve and for areas of brick and mortar to show signs of eventual failure. The Jule was awarded a Public Transit Infrastructure Grant (PTIG) for $257,800 in October 2011. The PTIG grant will fund 80% of the costs of the project with the City funding the 20% local match as required by the grant. Local match will be paid through an Urban Renewal General Obligation Bond paid by the Greater Downtown TIF, subject to a budget amendment in FY15 totaling $64,450. FEH Associates, Inc. was awarded the contract for construction document preparation and construction management December 16, 2014. DISCUSSION This project will include upgrades to the sprinkler system, structural repairs related to the roof replacement and full roof replacement. The construction work will involve gutter and downspout replacement, masonry repair, parapet capos and metal flashing, rough lumber and sheathing with sprinkler head replacement, updated fire department connection, wood beam replacement, wall sub -drain system, tuckpointing and sealing, and column bollards. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specs Public Hearing on Plans & Specs Receipt of Bid Proposals (Bid -Letting) Award Construction Contract Project Completion Date RECOMMENDATION May 19, 2014 May 23, 2014 May 23, 2014 June 2, 2014 July 8, 2014 July 21, 2014 November 1, 2014 I recommend that the City Council give preliminary approval to the construction plans and specifications and approve the Resolution of Necessity, establish June 2, 2014, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the Jule Transit Facility Roof & Sprinkler Repair Project. BUDGET IMPACT The estimate of probable cost for the Transit Facility Roof & Sprinkler Repair Project is as follows: Estimate Construction Contract $ 281,100.00 Contingency (5%) 14,055.00 Design & Management 27,000.00 Total Project Cost $322,155.00 The project funding summary is as follows: CIP No. Fund Description 6001613 Public Transit Infrastructure Grant Greater Downtown TIF Urban Renewal General Obligation Bond Total Project Funding REQUESTED ACTION Fund Amount $257,800.00 $64,450.00 $322,250.00 The City Council is requested to establish the date of the public hearing, and authorize the City Clerk to advertise for bid proposals through the adoption of the enclosed resolutions for the Transit Facility Roof & Sprinkler Repair Project. cc: Jenny Larson, Budget Director Maurice Jones, Economic Development Director Kelley Deutmeyer, ECIA Executive Director 2 RESOLUTION NO. 151-14 JULE TRANSIT FACILITY ROOF AND SPRINKLER REPAIR PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Transit Facility Roof & Sprinkler Repair Project in the estimated amount $281,100.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 2nd day of June, 2014, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Transit Facility Roof & Sprinkler Repair Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not Tess than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 8th day of July, 2014. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 21st day of July, 2014, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 19th day of May, 2014. Attest: d Kevin . irnstahl, CM , City Clerk o4J oy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE: JULE TRANSIT FACILITY ROOF AND SPRINKLER REPAIR PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Transit Facility Roof & Sprinkler Repair Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 2nd day of June, 2014, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Transit Facility Roof & Sprinkler Repair Project CIP: 6001613 Includes: — Replacement of North elevation gutter and downspouts — Repair of North and West elevation masonry — Replacement of North, Center, and South bay roof areas — Installation of parapet caps and metal flashing — Updates to sprinkler system Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of 2014. Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT JULE TRANSIT FACILITY ROOF AND SPRINKLER REPAIR PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 8th day of July, 2014, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on 8th day of July, 2014, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on the 21st day of July, 2014. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by 1St day of November, 2014. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state -chartered or federally chartered bank, or a certified share draft drawn on a state -chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the FEH Associates, Inc., 1030 Main Street, Suite 101, Dubuque, Iowa 52001 and www.rapidsrepro.com (FEH Planroom). A deposit of $25 or receipt of AGC, AMC, AMEC, MBI, or NECA card is required. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Transit Facility Roof & Sprinkler Repair Project CIP: 6001613 Includes: — Replacement of North elevation gutter and downspouts — Repair of North and West elevation masonry — Replacement of North, Center, and South bay roof areas — Installation of parapet caps and metal flashing — Updates to sprinkler system Published in the Telegraph Herald, day of 2014