Loading...
E.B. Lynon Interpretive Area Expansion Project_HearingTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: EB Lyons Interpretive Area Expansion Project (CIP 1002171) DATE: May 13, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $1,054,137 for the EB Lyons Interpretive Area Expansion Project. This project is funded with $1,314,500 in federal and state grants, $178,737 in funding raising by the Friends of the Mines of Span, and a bequest of $471,000 from E.B. Lyons. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Laura Carstens, Planning Services Manager Doug Olk, Friends of the Mines of Spain Wayne Buchholtz, Park Ranger, Mines of Spain Recreation Area Jonathan Cushman, U.S. Bank THE CITY OF Dui Masterpiece on the Mississippi Dubuque All.Amer;caCtly 2007 • 2012 • 2013 TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer DATE: May 12, 2014 SUBJECT: EB Lyons Interpretive Area Expansion Project (CIP 1002171) INTRODUCTION The enclosed resolution is in reference to the public hearing on the EB Lyons Interpretive Area Expansion Project. DISCUSSION The EB Lyons Interpretive Area Expansion Project will include a new ADA accessible trail from the current EB Lyons building to a new trail along a planted prairie with an overlook, two new parking lots to serve the trail, a shelter, a toilet facility, drinking fountain, kiosk, expanded parking near the nature center building and improved visibility for the entrance into EB Lyons Interpretive Center. In particular, the expansion of EB Lyons Interpretive Area will include: — Construction of a concrete trail and concrete pad to serve as an outdoor classroom including associated grading and culvert installations — Construction of concrete sidewalks to connect the current interpretative center to the newly constructed trails and parking Tots — Construction of stormwater management components — Construction of two parking lots and associated grading — Expansion of one parking lot and associated grading — Construction of a toilet facility and associated electric services — Construction of an open air pavilion and associated electric services — Construction of a kiosk — Installation of a water service to a people and pet drinking fountain and a flush hydrant — Site grading and utilities to accommodate a maintenance shop — Provide and install limestone benches The Iowa Department of Natural Resources (IDNR) is bidding a separate project to replace the existing maintenance building at EB Lyons. IDNR will manage that project separately but in coordination with this project. RECOMMENDATION I recommend that the City Council approve the construction plans and specifications for the EB Lyons Interpretive Area Expansion Project. BUDGET IMPACT The estimate of probable cost for the EB Lyons Interpretive Area Expansion Project is as follows: Estimate Construction Contract $ 893,079.00 Contingency 89,308.00 Construction Engineering & Inspection 71 750.00 Total Project Cost $1,054,137.00 The project funding summary is as follows: Fund CIP No. Fund Description Amount 1002171 Land and Water Conservation Grant $ 33,900.00 IDOT State Recreational Trails Grant 170,500.00 Resource Enhancement and Protection Grant (REAP) 200,000.00 Friends of the Mines of Spain Fundraising 178,737.00 EB Lyons Trust 471,000.00 Total Project Funding $1,054,137.00 REQUESTED ACTION The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the EB Lyons Interpretive Area Expansion Project. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Marie Ware, Leisure Services Manager Angela Corio, Iowa DNR Julie Neebel, IIW 2 RESOLUTION NO. 156-14 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EB LYONS INTERPRETIVE AREA EXPANSION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the EB Lyons Interpretive Area Expansion Project, in the estimated amount $893,079.00, are hereby approved. Passed, adopted and approved this 19th day of May, 2014. Vt toy D. Buol, Mayor Attest: Firnstahl, City Ierk STATE OF IOWA DUBUQUE COUNTY {SS: CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: May 09, 2014, and for which the charge is $93.24. Subscribed to before me, otary Public in and for Dubuque County, Iowa, , 20 /7 . otary Public in and for Dubuiue County, Iowa. CITY OF DIIHUQUE OFFICIAL tNOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMAATED COST FOR THE: E. D. LYONS EXPANSION PROJECT NOTICE IS HEREBY GIVEN: The City Coun- MATYK.'1 ESTERMEYER Oomfrll&elon Number 154885 My Cala fi. Ego. FEB. 1, 2017 Ydill be Opened and Coriaidered. Sealed proposals will be opened and bids'tabu- lated at 2:00 p.rn. on the 5th day of June, 2014, at City Hall - Con- ference Room A, 50 West 13th Street, Du- buque, Iowa, for con- sideration by the City Council (Council) at its meeting on 16th day of June, 2014. The City of Dubuque, lowa, re- serves the right to re- ject any and all bids. Time for Com- mencement and Completion of Work. Work on each improve- ment shall be complet- ed based on the follow- ing schedule: Site grading associated with the maintenance building' shall be com- pleted by August 15, 2014, All conduits and foundations for electri- cal components shall be set by October 17, 2014. The trail, outdoor learning` center, side- walks, water services, pavilion, pit toilet, ki- osk, and parking lots A ing associated grading and culvert installa- tions Construction of con- crete sidewalks to con- nect the current inter- pretative center to the trail and parking lots - Construction of stormwater manage - Ment components Construction of two parking lots and asso- ciated grading - Expansion of one parking lot `and associ ated grading Construction of a pit toilet facility and assn crated electric services Construction of an open air pavilion and associated electric services - Construction of a Id- osk Installation of a wa- ter service -Site grading and utl- ities toaccommodate a maintenance shop Provide; and install limestone benches This project is funded inpart by the Iowa De partment of Transpor- tation State Recrea- cu or tne uty or Dubu que, Iowa will hold a public hearing on the proposed plans, specs- fications, form of con- tract and estimated' cost for the E. B. Lyons Expansion Project, in accordance with the provisions of Chapter 26, Code of. f Iowa, at 6:30 p.m., on the 19th day of May, 2014, in the Historic Federal Build- ing Council Chambers (second floor), 350 West 6th Street, Dubu que, Iowa. Said pro- posed plans, 'specifica tions, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any inter- ested person may ap- pear and file; objections! thereto. The scope of the Proj- ect is as follows: Construction of a trail,' parking lots; pavil onnd ,i pit toilet, kiosk, an site grading at the E. B. Lyons Interpretative' Center Construction of a PCG trail and concrete pad to serve as an out -'i door classroom includ-r ingd associated gradings anclveinstalla-' tions - Construction of con- crete sidewalks to con-': nect the current inter pretative center to the trait and parking lots Construction of stormwater manage -I ment components - Construction of two parking lots and asso- ciated grading - Expansion of one parking lot and associ- ated grading - Construction of a pit toilet facility and asso- ciated electric services - Construction of an open air pavilion and associated electric ser- vices - Construction of a ki- osk - Installation of a wa- ter service - Site grading and util- ities to accommodate a maintenance shop - Provide and install limestone benches Any visual or hearing- impaired persons needing special assis- tance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 5th day of May, 2014. Kevin S. Firnstahl, t 5/9 CMC, City Clerk i NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT E, D. LYONS BNTERPRETIYE AREA EXPANSION PROJECT Time and Place for Filing Sealed Propos- els. Sealed bids for the work comprising each improvement as stated below must be filed be- fore' 2:00 p.m on the 5th day of June, 2014, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals and 8 shall be complet- ed and open for use by October 22, 2014. Work on parking lot C in the area of the existing maintenanceshop shall not be aIle to be started until June 1, 2015 and shall be com- pleted'by July 31, 2015. All work shall be fully completed by the 31st day of July 2015. Liqui- dated damages in the amount of $1,000.00 per calendar day will be assessed for each day that the work shall remain' uncompleted. Bid Security. Each bidder shall accompa- ny its bid with albitl se- curity as security that the successful 'bidier will enter into a con- tract for the work bid upon and will furnish after the award of con- tract a corporate sure- ty bond, acceptable to the governmental enti-= ty, for the faithful per- formance of the con- tract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be'm the amount of ten percent (10%) of the amount of the contract and shall be in theiform; of a cashier's check or cer- tified check drawn on a state -chartered or fed- erally chartered bank, or a certified' share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the govern- mental entity. The bid bond shall contain no conditions excepted as provided in this sec- tion. aDcu- mContrents: ct Copies Do fa the construction docu- menmaybe at thets Engineering obtDe partment, City Hallained - Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. The Con- tract Documents will' also be available on the City's website at www. cityofdubuque.org/bid s.aspx'No plan deposit', is required. Preference for lowa Products and Labor. By virtue of statutory authority, preference will be given to prod- ucts and provisions grown and coal pro- ewhthS of ducIowa, itand toe :Iowa domesticd laboinr, tthetate o re- quired quired under lowa'stat- utes. Sales Tax. The bidder should ' not include sales tax in its bid. A sales tax exemption certificate will be avail- able for all material purchased for incorpo- ration inithe project. General Nature of Public improvement. E. B. Lyons Interpre- tive Area Expansion Project CIP 1002171 Construction of a trail, parking lots, pavilion, pit toilet, ki- osk, and site grading at the E. D. Lyons In- terpretative Center - Construction of a PCC trail and concrete pad to serve as an out -J doer classroom includ- thatone, aRl TTrail fund. Under program bid- ders are ',required to make positive efforts to solicit bids/quotes from targeted small business ,(TSB) enter- prises for material and/or subcontract work and submit such documentation with the bid. Published in the Tele- graph Herald, 9th day l' of May, 2014. 1t 5/9