City Engineer Gus Psihoyos recommends City Council approval of the plans,
specifications, form of contract and the estimated cost of $1,054,137 for the EB Lyons
Interpretive Area Expansion Project.
This project is funded with $1,314,500 in federal and state grants, $178,737 in funding
raising by the Friends of the Mines of Span, and a bequest of $471,000 from E.B.
Lyons.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Laura Carstens, Planning Services Manager
Doug Olk, Friends of the Mines of Spain
Wayne Buchholtz, Park Ranger, Mines of Spain Recreation Area
Jonathan Cushman, U.S. Bank
THE CITY OF
Dui
Masterpiece on the Mississippi
Dubuque
All.Amer;caCtly
2007 • 2012 • 2013
TO: Michael C. Van Milligen, City Manage
FROM: Gus Psihoyos, City Engineer
DATE: May 12, 2014
SUBJECT: EB Lyons Interpretive Area Expansion Project
(CIP 1002171)
INTRODUCTION
The enclosed resolution is in reference to the public hearing on the EB Lyons Interpretive
Area Expansion Project.
DISCUSSION
The EB Lyons Interpretive Area Expansion Project will include a new ADA accessible trail
from the current EB Lyons building to a new trail along a planted prairie with an overlook,
two new parking lots to serve the trail, a shelter, a toilet facility, drinking fountain, kiosk,
expanded parking near the nature center building and improved visibility for the entrance
into EB Lyons Interpretive Center.
In particular, the expansion of EB Lyons Interpretive Area will include:
— Construction of a concrete trail and concrete pad to serve as an outdoor classroom
including associated grading and culvert installations
— Construction of concrete sidewalks to connect the current interpretative center to
the newly constructed trails and parking Tots
— Construction of stormwater management components
— Construction of two parking lots and associated grading
— Expansion of one parking lot and associated grading
— Construction of a toilet facility and associated electric services
— Construction of an open air pavilion and associated electric services
— Construction of a kiosk
— Installation of a water service to a people and pet drinking fountain and a flush
hydrant
— Site grading and utilities to accommodate a maintenance shop
— Provide and install limestone benches
The Iowa Department of Natural Resources (IDNR) is bidding a separate project to
replace the existing maintenance building at EB Lyons. IDNR will manage that project
separately but in coordination with this project.
RECOMMENDATION
I recommend that the City Council approve the construction plans and specifications for
the EB Lyons Interpretive Area Expansion Project.
BUDGET IMPACT
The estimate of probable cost for the EB Lyons Interpretive Area Expansion Project is as
follows:
Estimate
Construction Contract $ 893,079.00
Contingency 89,308.00
Construction Engineering & Inspection 71 750.00
Total Project Cost $1,054,137.00
The project funding summary is as follows:
Fund
CIP No. Fund Description Amount
1002171 Land and Water Conservation Grant $ 33,900.00
IDOT State Recreational Trails Grant 170,500.00
Resource Enhancement and Protection Grant (REAP) 200,000.00
Friends of the Mines of Spain Fundraising 178,737.00
EB Lyons Trust 471,000.00
Total Project Funding $1,054,137.00
REQUESTED ACTION
The City Council is requested to approve the plans, specifications, form of contract and
the estimated cost for the EB Lyons Interpretive Area Expansion Project.
Prepared by Jon Dienst, PE
cc: Jenny Larson, Budget Director
Laura Carstens, Planning Services Manager
Marie Ware, Leisure Services Manager
Angela Corio, Iowa DNR
Julie Neebel, IIW
2
RESOLUTION NO. 156-14
APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED
COST FOR THE EB LYONS INTERPRETIVE AREA EXPANSION PROJECT
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated cost for the EB
Lyons Interpretive Area Expansion Project, in the estimated amount
$893,079.00, are hereby approved.
Passed, adopted and approved this 19th day of May, 2014.
Vt
toy D. Buol, Mayor
Attest:
Firnstahl, City Ierk
STATE OF IOWA
DUBUQUE COUNTY
{SS:
CERTIFICATION OF PUBLICATION
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher
of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County
of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper
on the following dates: May 09, 2014, and for which the charge is $93.24.
Subscribed to before me, otary Public in and for Dubuque County, Iowa,
, 20 /7 .
otary Public in and for Dubuiue County, Iowa.
CITY OF DIIHUQUE
OFFICIAL tNOTICE
NOTICE OF PUBLIC
HEARING ON PLANS,
SPECIFICATIONS,
FORM OF CONTRACT,
AND ESTIMAATED
COST FOR THE:
E. D. LYONS
EXPANSION PROJECT
NOTICE IS HEREBY
GIVEN: The City Coun-
MATYK.'1 ESTERMEYER
Oomfrll&elon Number 154885
My Cala fi. Ego. FEB. 1, 2017
Ydill be Opened and
Coriaidered. Sealed
proposals will be
opened and bids'tabu-
lated at 2:00 p.rn. on
the 5th day of June,
2014, at City Hall - Con-
ference Room A, 50
West 13th Street, Du-
buque, Iowa, for con-
sideration by the City
Council (Council) at its
meeting on 16th day of
June, 2014. The City of
Dubuque, lowa, re-
serves the right to re-
ject any and all bids.
Time for Com-
mencement and
Completion of Work.
Work on each improve-
ment shall be complet-
ed based on the follow-
ing schedule: Site
grading associated
with the maintenance
building' shall be com-
pleted by August 15,
2014, All conduits and
foundations for electri-
cal components shall
be set by October 17,
2014. The trail, outdoor
learning` center, side-
walks, water services,
pavilion, pit toilet, ki-
osk, and parking lots A
ing associated grading
and culvert installa-
tions
Construction of con-
crete sidewalks to con-
nect the current inter-
pretative center to the
trail and parking lots
- Construction of
stormwater manage -
Ment components
Construction of two
parking lots and asso-
ciated grading
- Expansion of one
parking lot `and associ
ated grading
Construction of a pit
toilet facility and assn
crated electric services
Construction of an
open air pavilion and
associated electric
services
- Construction of a Id-
osk
Installation of a wa-
ter service
-Site grading and utl-
ities toaccommodate a
maintenance shop
Provide; and install
limestone benches
This project is funded
inpart by the Iowa De
partment of Transpor-
tation State Recrea-
cu or tne uty or Dubu
que, Iowa will hold a
public hearing on the
proposed plans, specs-
fications, form of con-
tract and estimated'
cost for the E. B. Lyons
Expansion Project, in
accordance with the
provisions of Chapter
26, Code of.
f Iowa, at
6:30 p.m., on the 19th
day of May, 2014, in the
Historic Federal Build-
ing Council Chambers
(second floor), 350
West 6th Street, Dubu
que, Iowa. Said pro-
posed plans, 'specifica
tions, form of contract
and estimated cost are
now on file in the office
of the City Clerk. At
said hearing any inter-
ested person may ap-
pear and file; objections!
thereto.
The scope of the Proj-
ect is as follows:
Construction of a trail,'
parking lots; pavil onnd
,i
pit toilet, kiosk, an
site grading at the E. B.
Lyons Interpretative'
Center
Construction of a
PCG trail and concrete
pad to serve as an out -'i
door classroom includ-r
ingd associated gradings
anclveinstalla-'
tions
- Construction of con-
crete sidewalks to con-':
nect the current inter
pretative center to the
trait and parking lots
Construction of
stormwater manage -I
ment components
- Construction of two
parking lots and asso-
ciated grading
- Expansion of one
parking lot and associ-
ated grading
- Construction of a pit
toilet facility and asso-
ciated electric services
- Construction of an
open air pavilion and
associated electric ser-
vices
- Construction of a ki-
osk
- Installation of a wa-
ter service
- Site grading and util-
ities to accommodate a
maintenance shop
- Provide and install
limestone benches
Any visual or hearing-
impaired persons
needing special assis-
tance or persons with
special accessibility
needs should contact
the City Clerk's office
at (563) 589-4120 or
TDD at (563) 690-6678
at least 48 hours prior
to the meeting.
Published by order of
the City Council given
on the 5th day of May,
2014.
Kevin S. Firnstahl,
t 5/9 CMC, City Clerk
i
NOTICE TO BIDDERS
CITY OF DUBUQUE
PUBLIC
IMPROVEMENT
PROJECT
E, D. LYONS
BNTERPRETIYE AREA
EXPANSION PROJECT
Time and Place for
Filing Sealed Propos-
els. Sealed bids for the
work comprising each
improvement as stated
below must be filed be-
fore' 2:00 p.m on the
5th day of June, 2014,
in the Office of the City
Clerk, City Hall - First
Floor, 50 West 13th
Street, Dubuque, Iowa.
Time and Place
Sealed Proposals
and 8 shall be complet-
ed and open for use by
October 22, 2014. Work
on parking lot C in the
area of the existing
maintenanceshop
shall not be aIle to be
started until June 1,
2015 and shall be com-
pleted'by July 31, 2015.
All work shall be fully
completed by the 31st
day of July 2015. Liqui-
dated damages in the
amount of $1,000.00
per calendar day will
be assessed for each
day that the work shall
remain' uncompleted.
Bid Security. Each
bidder shall accompa-
ny its bid with albitl se-
curity as security that
the successful 'bidier
will enter into a con-
tract for the work bid
upon and will furnish
after the award of con-
tract a corporate sure-
ty bond, acceptable to
the governmental enti-=
ty, for the faithful per-
formance of the con-
tract, in an amount
equal to one hundred
percent of the amount
of the contract. The bid
security shall be'm the
amount of ten percent
(10%) of the amount of
the contract and shall
be in theiform; of a
cashier's check or cer-
tified check drawn on a
state -chartered or fed-
erally chartered bank,
or a certified'
share
draft drawn on a state -
chartered or federally
chartered credit union,
or the governmental
entity may provide for
a bidder's bond with
corporate surety satis-
factory to the govern-
mental entity. The bid
bond shall contain no
conditions excepted as
provided in this
sec-
tion.
aDcu-
mContrents: ct Copies Do fa the
construction docu-
menmaybe
at thets Engineering
obtDe
partment, City Hallained -
Second Floor, 50 West
13th Street, Dubuque,
Iowa 52001. The Con-
tract Documents will'
also be available on the
City's website at www.
cityofdubuque.org/bid
s.aspx'No plan deposit',
is required.
Preference for lowa
Products and Labor.
By virtue of statutory
authority, preference
will be given to prod-
ucts and provisions
grown and coal pro-
ewhthS
of ducIowa, itand toe :Iowa
domesticd laboinr, tthetate
o re-
quired
quired under lowa'stat-
utes.
Sales Tax. The bidder
should ' not include
sales tax in its bid. A
sales tax exemption
certificate will be avail-
able for all material
purchased for incorpo-
ration
inithe project.
General Nature of
Public improvement.
E. B. Lyons Interpre-
tive Area Expansion
Project
CIP 1002171
Construction of a
trail, parking lots,
pavilion, pit toilet, ki-
osk, and site grading
at the E. D. Lyons In-
terpretative Center
- Construction of a
PCC trail and concrete
pad to serve as an out -J
doer classroom includ-
thatone, aRl TTrail fund. Under
program bid-
ders are ',required to
make positive efforts
to solicit bids/quotes
from targeted small
business ,(TSB) enter-
prises for material
and/or subcontract
work and submit such
documentation with
the bid.
Published in the Tele-
graph Herald, 9th day l'
of May, 2014.
1t 5/9