Loading...
Signed Contract_WHKS Addendum #4_Airport Enginering Water Design ServicesMasterpiece on the Mississippi Dubuque ***** NI -America City 11111! 2007 • 2012 • 2013 TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager / SUBJECT: Airport Engineering Water Design Services Agreement Addendum #4 in the amount of $156,200.00 DATE: May 7, 2014 INTRODUCTION The purpose of this memorandum is to request your support and approval, by signature, for the attached WHKS Agreement. This addendum is pertaining to additional water design services for the airport project. DISCUSSION WHKS is the engineering firm currently working with the city on the designs for water, sewer, and fiber optic services for the airport project. During the course of the original design work it was discovered that an additional water pump station with an in ground reservoir would provide the best and most reliable water service to the airport. This design change would eliminate our current design issues of excessive water pressure at the low line area of the Highway 151/61 interchange. In addition, a second pump station with an in ground reservoir would considerably reduce the risk of the airport ever being without water service for domestic and fire needs. The City Utility Team assigned to this project recommends this improvement, and would like to proceed with WHKS Engineering. Staff and I are available to discuss and answer questions you may have with this recommendation. City Attorney Barry Lindahl has reviewed this proposed addendum agreement and finds it to be acceptable for signature. ACTION If in agreement with the recommendations, sign and return the attached addendum, so that we may continue with this stage of the project. BG: mdm Attachment cc: Gus Psihoyos, City Engineer whks ADDENDUM NO. 4 TO PROFESSIONAL SERVICES AGREEMENT 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 WHEREAS, the City of Dubuque (Client) and WHKS & Co. (WHKS) executed a Professional Services Agreement (Prime Agreement) dated November 17, 2012, for Engineering, Surveying and Construction Services for CITY OF DUBUQUE UTILITY EXTENSIONS TO THE DUBUQUE REGIONAL AIRPORT (Project), and WHEREAS, the Prime Agreement included Engineering, Surveying and Construction Services along with a detailed Scope of Services, and WHEREAS, WHKS will provide Engineering, Surveying and Construction services above and beyond that set forth in the Prime Agreement, and as described below in this Addendum. SCOPE OF SERVICES This addendum is a continuation of the services being provided to the Client and entails necessary engineering and surveying services for additional Design Phase Services consisting of design of the water system layout relating to Option #4 established as part of Addendum 3, including booster stations, pipe sizes and storage tank as proposed beyond that of the Prime Agreement. WHKS & Co. shall perform the described services as listed in Attachment A: Supplemental Fees Not -to -Exceed Amount of $156,200.00 See Fee Breakdown on Attachment B In all other respects, the obligations of the Client and WHKS shall remain as specified in the Prime Agreement. Executed this City of Dubuque day of f �� y , 2014. whks By: By: Oki Printed Name: Title: Date Michael C. Van Milligen City Manager May 8, 2014 Printed Name: Michael A. Zelinskas Title: Vice President Date whks ATTACHMENT A RE: Dubuque, IA Addendum No. 4 City of Dubuque Utility Extensions to the Dubuque Regional Airport Engineering & Surveying Services 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 Scope of Services for Addendum No. 4 The WHKS Team will provide the following services for the City of Dubuque for the Design of City Utility Extensions to the Dubuque Regional Airport: Data Collection Detailed Ground Survey WHKS will perform survey tasks related to the project: 1. Provide necessary topographic surveying for the design of the two booster station sites. a. The ground control and elevations will be referenced to the datum in use for the SW Arterial Project and tied to the City's GIS. 2. Contact Iowa One -Call. 3. Identify and prepare permanent and temporary easement descriptions and acquisition plats for use in acquiring necessary easements and parcels for construction of the booster stations and ground storage tank. 4. The City will be responsible for all plat recording fees and/or expenses. 5. The easements will be acquired by the City, utilizing information from WHKS, and may include: • Field boundary survey. • Property Warranty Deed search. • Previous surveys, subdivisions or individual tracts and IDOT right-of-way search. 6. WHKS will correspond with the Dubuque County Zoning Department. WHKS will provide minor subdivision plat, zoning amendment requests and certifications for the City to obtain approval from the Dubuque Zoning Department. Obtain Environmental and Geotechnical Data Soil borings for the proposed booster stations and ground storage tank will be obtained to determine the existing soil conditions. 1. Borings are based on: a. Three (3) Booster Station borings to a depth of 20 feet. b. Four (4) Storage tank borings to a depth of 50 feet as per tank requirements. 2. Soil Report and recommendations. Design Prepare Conceptual Design for Booster Stations and Ground Storage (50%) The project team will begin to layouts for the booster stations and ground storage tank. 1. Building site locations for the proposed booster station will be evaluated. 2. Review and revise existing alignments for the fiber optic conduit and water main that take into account the new booster stations and storage tank.. 3. A hydraulic model of the City of Dubuque's entire existing water system is not included as a part of this scope and fee. 4. Scope and fees do not include any surge analysis or surge protection design for the proposed water line extension. Longer pressure systems with significant elevation change have the whks 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 potential for sudden pump failure. For this project we do not anticipate needing a surge analysis or design, however, if it is determined during design that it is needed, it would be considered extra work. 5. WHKS will meet with City of Dubuque and Dubuque Regional Airport staff to discuss the revised booster station and tank locations and water main alignment. The following tasks will be completed as a part of the booster station design: Site Selection 1. The WHKS Team will identify potential sites for the new booster stations. 2. A preliminary booster station layout will be developed to evaluate the minimum land area required. Hydraulic Analysis 1. The WHKS Team will revise the hydraulic analysis of the water main extension to determine the design criteria for the new booster stations. A list of recommended locations will be provided for the standard fire flow tests, as well as set of instructions and recording forms. A list of observation hydrants to monitor residual pressures will also be provided. In order to establish these lists, a map or shapefiles of the entire pressure zone water system will be provide by the City of Dubuque, showing all distribution system piping, cross -zone connections, and pressure regulating structures/devices. City Staff will perform additional fire flow tests, if needed, to establish a base condition and assess potential existing deficiencies. WHKS will provide a field technician to assist and coordinate the testing efforts. It is anticipated that fire flow conditions/increased demand conditions from the Airport service area may be simulated by opening several hydrants near the proposed connection point; then monitor the residual pressure at key locations throughout the distribution zone to observe pressure drops. This procedure is anticipated to provide a rough snapshot of how the system responds. If deficiencies are observed, this will give the City an idea of where future studies and/or improvements may be needed. The results of the tests will be reported to the City and will identify deficiencies or the need for additional studies. 2. The WHKS Team will performed a hydraulic analysis to update the current model, developed in Addendum 3, and confirm the booster station design capacities, pressures, head losses and key water surface elevations to be used for final design and specification of the pumping facilities. Modeling for the hydraulic analysis will be WaterCAD software. Design Assumption a. A total of 6 hours have been budgeted to review, confirm and finalize the hydraulic model for Option #4. Any additional modeling will be considered addition Preliminary Design (75%) Based on the comments received during the review and discussion of the Booster Station Design to this point with the City, the WHKS Team will: 1. Booster Station No. 1 will be located adjacent to US Highway 61 as shown on Attachment C attached hereto. 2. Booster Station No. 2 will be located at Jet Center Drive as shown as shown on Attachment C attached hereto. 3. Booster Station No 1 will have two pumps and will be approximately 30 FT by 50 FT in dimension. The booster station will be buried into a hill and masonary wall and modular block and brick construction will be used for the building. A green roof option will be considered along with the precast roof style. 4. Booster station No. 2 will utilize the design and layout of the booster station as designed to 95% as part of the original contract. The civil site plan, utilities, and grading will be modified to accommodate the selected site and orientation of the building shown. Minimal changes are whks 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 anticipated to the inside of the booster station and most likely the elimination of one large pump and the mirroring of the water piping. Minimal changes are expected to the floor plan, materials, doors, wall sections, roof plan, HVAC, and plumbing are included in this scope. 5. Site plans for each booster station will be design with a paved access and a parking area, similar to the previous booster station design. 6. Provide booster station drawings which will include: • Floor plans and elevations of booster station • Site plan for each booster station • Electrical one -line drawing for each booster station • Structural plan, sections and details for each booster station building envelope and foundation/footing. 7. Specification development will utilize the 16 Division specifications format for building related construction. 8. Based on the preliminary design efforts, the Consultant will update the cost estimate and construction schedule for the project 9. The WHKS team will conduct a meeting with City Staff for review, discussion and comments on the preliminary documents. Project Permitting Scope remains as per the Prime agreement. Final Plan and Bidding Document Preparation Scope remains as per the Prime agreement. Bid Letting and Contract Award Scope remains as per the Prime agreement. Additional Assumptions Construction services such as staking and observation services are not included in the scope of work. Schedule To be determined upon approval of this Addendum. whks ATTACHMENT B RE: Dubuque, IA Addendum #4 City of Dubuque Utility Extensions to the Dubuque Regional Airport Engineering & Surveying Services Fee Breakdown 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 ADDENDUM #4 - FEES FOR THE DESIGN OF TWO BOOSTER STATIONS AND A WATER STORAGE FACILITY CITY OF DUBUQUE UTILITY EXTENSION WORK BREAKDOWN STRUCTURE (WBS) DESCRIPTION OF PROFESSIONAL SERVICES OR TASKS Total Addendum Fees % to Dale Total Prime Fees Prime % Total HDR Fees HDR % Total Terracon Fees Terracon % 4.10 Project Management 4.1.1 Document Review $ 1,250.00 0.80% $ 200.00 0.13% $ 1,050.00 0.67% 4.1.2 Progress Reports $ 1,910.00 1.22% $ 100.00 0.06% $ 1,810.00 1.16% 4.1.3 Oversee Design $ 5,725.00 3.67% $ 2,200.00 1.41% $ 3,525.00 2.26% 4.1.4 Permitting $ 735.00 0.47% 5 300.00 0.19% $ 435.00 0.28% 4.1.5 Coordinationw/Stakeholders $ 4,000.00 2.56% $ 4,000.00 2.56% $ - 0.00% SUBTOTAL FEE $ 13,620.00 $ 6,800.00 $ 6,820.00 4.20 Engineering Analysis 4.2.1 Site Characterization $ 200.00 0.13% $ 200.00 0.13% 4.2.1.1 Detailed Ground Survey $ 6,000.00 3.84% $ 6,000.00 3.84% 4.2.1.2 Environmental/ Geotechnical $ 10,200.00 6.53% $ 200.00 0.13% $ 10,000.00 6.40% 4.2.1.3 Additional Relevant Data $ 3,180.00 2.04% $ 500.00 0.32% $ 2,680.00 1.72% SUBTOTAL FEE $ 19,580.00 $ 6,900.00 $ 2,680.00 $ 10,000.00 4.30 Design 4.3.1 Conceptual Design w/ Cost Estimate 50% Booster Station#1 $ 27,919.00 17.87% 0.00% $ 27,919.00 17.87% Booster Station#2 $ 14,381.00 9.21% 0.00% $ 14,381.00 9.21% Water Storage Facility $ 8,000.00 5.12% $ 8,000.00 5.12% 0.00% 4.3.2 Preliminary Design w/ Cost Estimate 75% Booster Station#1 $ 18,381.00 11.77% $ - 0.00% $ 18,381.00 11.77% Booster Station#2 $ 9,469.00 6.06% $ - 0.00% $ 9,469.00 6.06% Water Storage Facility $ 13,000.00 8.32% $ 13,000.00 8.32% 0.00% 4.3.3 Final Design / Bidding Documents w/ Cost Estimate Booster Station#1 $ 16,071.00 10.29% 0.00% $ 16,071.00 10.29% Booster Station#2 $ 8,279.00 5.30% 0.00% $ 8,279.00 5.30% Water Storage Facility $ 6,000.00 3.84% $ 6,000.00 3.84% 0.00% SUBTOTAL FEE $ 121,500.00 $ 27,000.00 $ 94,500.00 4.40 Bidding 8 Awarding 4.4.1 Bidding & Awarding $ 1,500.00 0.96% $ 1,500.00 0.96% 0.00% SUBTOTAL FEE $ 1,500.00 $ 1,500.00 TOTALS $ 156,200.00 100.00% $ 42,200.00 27.02% $ 104,000.00 66.58% $ 10,000.00 6.40% Original Contract Amount $ 288,362.00 Addendum #1 URA - Not Included in this Project $ Addendum #2 Booster Station Relocation $ 14,800.00 Addendum #2 Booster Station Relocation - Unused Fees due to Addendum #4 $ (10,062.52) Addendum #3 Additional Options $ 2,900.00 Addendum #4 Water Main Revisions - Option #4 $ 156,200.00 TOTAL CONTRACT AMOUNT with Approval of Addendum #4 $ 452,199.48 whks ATTACHMENT C RE: Dubuque, IA Addendum #4 City of Dubuque Utility Extensions to the Dubuque Regional Airport Engineering & Surveying Services Conceptual Site Drawing of Booster Station #1 and #2 1701 Route 35 North East Dubuque, IL 61025 Phone: 815-747-8833 EXHIBIT C - PUMP STATION LOT PREPARED BY: Dan Hingtgen, L.S. 14052 WEEKS & co. 1701 Route 35 North East Dubuque, IL 61025 Tel. (815) 747-8833 PRELIMINARY PLAT OF SURVEY for A TRACT OF LAND LOCATED IN LOT A OF SILVER OAKS ESTATE IN THE SOUTHEAST QUARTER (SE 1/4) OF SECTION 23, TOWNSHIP 88 NORTH, RANGE 2 EAST OF THE 5th PRINCIPAL MERIDIAN, DUBUQUE COUNTY, IOWA NW CORNER SE 1/4 SECTION 23 T 88 N, R 2 E Falls In Water, Used Iles to Establish z N 88°01'33" E 8.79' SW CORNER N3 SE 1/4 N co SECTION 23 N88°17'12"E 180.00' DOT ROW (121. !82 P.O.B. T 88 N, R 2 E Fd. Mag Noll 10 Asphalt Pavement GPS GPZ / GPZ GPS / LOT A SILVER OAKS ESTATES GPS GPZ / / GPZ GPS GPS/ SW 1/4 SE 1/4 PUMP STATION LOT 1.00 ACRE LOT 1 OF 2 SW 1/4 SE 1/4 ,,uut urrr(rrr;,, • DANIEL J. ••. HINGTGEN : m 14052 l•R �'.*. •IOWA N 8:'14'39" E 1 hereby certify that this land surveying document was prepared and the related survey work was performed by me or under my direct personal supervision and that I am a duly licensed Land Surveyor under the laws of the State of Iowa. PROPERTY OWNER: Royal Oaks Development Corp SURVEY REQUESTED BY: City of Dubuque MELD SURVEY CONDUCTED ON: 05/14/13 PRELIMINARY SURVEY DESCRIPTION A TRACT OF LAND LOCATED IN LOT A OF SILVER OAKS ESTATE IN THE SOUTHEAST QUARTER (SE 1/4) OF SECTION 23, TOWNSHIP 88 NORTH, RANGE 2 EAST OF THE 5th PRINCIPAL MERIDIAN, DUBUQUE COUNTY, IOWA, AND MORE COMPLETELY DESCRIPTION AS FOLLOWS: COMMENCING AT THE SOUTHWEST (SW) CORNER OF THE SOUTHEAST QUARTER (SE 1/4) OF SAID SECTION 23; THENCE N 01'58'27" W 242.31 FEET ALONG THE WEST UNE OF SAID SE 1/4; THENCE N 88'01'33' E 78.79 FEET TO THE NW CORNER OF LOT 1 OF LOT 2 OF THE SW 1/4 OF THE SE 1/4 OF SAID SECTION 23, SAID POINT ALSO BEING ON THE EAST RIGHT—OF—WAY UNE OF US HIGHWAY 61 AND THE POINT OF BEGINNING; THENCE N 8817'12" E 180.00 FEET ALONG THE NORTH LINE OF SAID LOT 1 OF LOT 2 AND ITS EASTERLY EXTENSION; THENCE N 08'41'01" W 243.80 FEET; THENCE S 88'17'12' W 180.00 FEET TO A POINT ON 1118 EAST UNE OF SAID RIGHT—OF—WAY LINE; THENCE S 08'41'01" E 243.80 FEET ALONG SAID RIGHT—OF—WAY LINE TO THE POINT OF BEGINNING. SAID TRACT CONTAINS 1.00 ACRE INCLUDING AND SUBJECT TO ALL EASEMENTS OF RECORD. NOTE: THE WEST LINE OF THE SE 1/4 IS ASSUMED TO BEAR N 01'58'27" W. SE CORNER - SECTION 23 T 88 N, R 2 E Fd. 1/2' Rebar Is/ Yellow Cop #14417 2858,47" J4111 PLAT OF SURVEY Drawn by: AH Project No.: 7771.00 Drawing Dote: 3/0844 Drawing Nana 81777.00-080 unary F>tlR0w-eanenylsw.ey F orre q Don Hingtgen, Land Surveyor Date License number: 14052 My registration renewal date Is December 31, 2014 Pages or sheets covered by this eeol: erg'.neas * plalners+ landwrvetots LEGEND ‘..• SET T -BAR with YELLOW SURVEY CAP NO. 14052 Da SECTION CORNER ® FOUND CORNER (os Called Out on Plat) 15.0' FIELD MEASUREMENT (1502 PREVIOUSLY RECORDED -H--al'- FENCE LINE I SURVEYED TRACK SCALE 1" = 150' 0 30' 75' 150' —NW 11/4- 1 —SW1/4— I —NE 1/4- 1 Survey Location T88N R2E SHEET 1 of EXHIBIT - PUMP STATION AND STORAGE TANK LOCATION PREPARED BY: Dan Hingtgen, L.S. 14052 BVI- KS & ca. 1701 Route 35 North East Dubuque, IL 61025 Tel. (815) 747-8833 PROPERTY OWNER: City of Dubuque SURVEY REOUESTED BY: City of Dubuque FIELD SURVEY CONDUCTED ON: 05/14/13 US ARMY RESERVE I CENTER co ilf I JET CENTER DRIVE elk oo T I 357.10' ,pO rae... Yr 4� IL TM EXHIB�A`� EXHIBITS . LEASED AREA o LEASED AREA N N BRADLEY JO CHART@8 b JACKSON CONCRETE n °; 0 m m (1) 0) o STORAGE TANK 208.00' o I I 426.00' 54.5' 7 PAVED DRIVE c'o 58.0' 0 0o 30.0' Setback — Line R35' I 50.0' I o) 32.0' 426.00' I I 54.5' PUMP STATION AIRPORT PROPERTY AZN \°\ 'f'T \ \ \ \ O 0 TJ 0 I ° 0I NORTH EXHIBIT Drum be AN Probset Na: 7771.00 Dro.hg Date: 4/07/14 Droving Noma 0: l7771.IXY0ao varyc rinow-ee,..,eay\S,e..y Franey 1 I —NW 1/4 --NE i 1 I 1/4— { 2e 1 - —SW 11/4— I 1 —SE 11/4— I rg.m.ers«plalnas«ard runt.; SCALE 1" = 150' Surveyy Loeatton T88N R2E SHEET 1 of 2 0 30' 75' 150' LINE NO. THECITY OF Dui Masterpiece on the Mississippi ITEM NUMBER City of Dubuque, Iowa Construction Cost Estimate Date: 22 -Apr -14 Project Name: Utility Extension to the Dubuque Regional Airport 6,849,737.00 CIP Budget Amount: $ Project Completion Date: DESCRIPTION Division 1 - General Provisions 1 1090-105-D Mobilization Division 2010 - Earthwork, Subgrade, and Subbase 2 2010-108-C-0 Clearing and Grubbing C 3 2010-108-D-1 Topsoil, On-site 4 2010-108-E-0 Excavation, Class 10 PLAN QUANTITY 28 -Aug -16 UNIT UNIT PRICE TOTAL PRICE 1.00 LS $ 100,000.00 $ 100,000.00 Sub Total $ 100,000.00 1.00 LS $ 13,000.00 $ 13,000.00 2000.00 CY $ 5.00 $ 10,000.00 4000.00 CY $ 5.00 $ 20,000.00 5 2010-108-E-0 Excavation, Class 13 300.00 CY $ 5.00 $ 1,500.00 6 2010-108-1-0 Subbase, Granular Subbase - Gradation 12a 1700.00 TON $ 17.00 $ 28,900.00 7 2010-108-F-0 Below Grade Excavation (Core Out) 1000.00 TON $ 20.00 $ 20,000.00 8 2010-108-1-0 Subbase, Coarse Aggregate Subbase - 3" Breaker 3000.00 TON $ 15.00 $ 45,000.00 Division 3010 - Trench Excavation and Backfill Sub Total $ 138,400.00 9 3010-108-B-0 Rock Excavation 4000.00 CY $ 70.00 $ 280,000.00 10 3010-108-D-0 Trench Foundation - 3" Breaker 3825.00 TON $ 15.00 $ 57,375.00 11 3010-108-D-0 Bedding Material, 1" Commecial Clean Stone 33800.00 TON $ 17.00 $ 574,600.00 12 3010-108-D-0 Replacement of Unsuitable Backfill Material Gradation 32 21670.00 TON $ 14.00 $ 303,380.00 13 3010-108-E-0 Special Pipe Embedment or Encasement 1000.00 LF $ 90.00 $ 90,000.00 14 3010-108-J-3 Trenching, 48 Inch Depth 22250.00 LF $ 4.00 $ 89,000.00 15 3010-108-K-0 Directional Drilling, w/o Pipe 500.00 LF $ 30.00 $ 15,000.00 Division 4010 - Sanitary Sewers Sub Total $ 1,409,355.00 16 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 12" PVC 1643.00 LF $ 45.00 $ 73,935.00 17 4010-108-A-1 Sanitary Sewer Gravity Main, Trenched, 18" PVC 10610.00 LF $ 60.00 $ 636,600.00 18 4010-108-B-1 Sanitary Sewer Gravity Main with Casing Pipe, Trenched, 18" PVC 836.00 LF $ 110.00 $ 91,960.00 19 4010-108-B-2 Sanitary Sewer Gravity Main with Casing Pipe, Trenchless, 18" PVC 565.00 LF $ 300.00 $ 169,500.00 Division 5010 - Pipe and Fittings Sub Total $ 971,995.00 20 5010-108-A-1 Water Main, Trenched, PVC, 12" 4800.00 LF $ 35.00 $ 168,000.00 21 5010-108-A-1 Water Main, Trenched, PVC, 16" 12900.00 LF $ 45.00 $ 580,500.00 22 5010-108-A-1 Water Main, Trenched, DIP, 6" 200.00 LF $ 45.00 $ 9,000.00 23 5010-108-B-1 Water Main, with Casing Pipe, Trenched, DIP, 16" 300.00 LF $ 125.00 $ 37,500.00 24 5010-108-B-2 Water Main, with Casing Pipe, Trenchless, DIP, 12" 250.00 LF $ 300.00 $ 75,000.00 25 5010-108-C-2 Fittings by Weight, DI 34769.00 L8S $ 4.50 $ 156,460.50 Division 5020 - Valves, Fire Hydrants, and Appurtenances Sub Total $ 1,026,460.50 26 5020-108-A-0 Valve, Gate, DIP, 6" 11.00 EA $ 1,100.00 $ 12,100.00 27 5020-108-A-0 Valve, Gate, DIP, 12" 1.00 EA $ 2,500.00 $ 2,500.00 28 5020-108-A-0 Valve, Gate, DIP, 16" 25.00 EA $ 6,000.00 $ 150,000.00 29 5020-108-C-0 Fire Hydrant Assembly 13.00 EA $ 3,000.00 $ 39,000.00 Division 6010 - Structures for Sanitary and Storm Sewers Sub Total $ 203,600.00 30 6010-108-A-0 Manhole Type, PC, 48" SW -301 401.79 VF $ 340.00 $ 136,608.60 31 6010-108-A-0 Manhole Type, PC, 60" SW -301, Flat top 16.08 VF $ 400.00 $ 6,432.00 32 6010-108-C-0 Drop Connection 2.00 EA $ 3,000.00 $ 6,000.00 33 6010-108-G-0 Connection to Existing Manhole 1.00 EA $ 1,000 00 $ 1,000.00 Sub Total $ 150,040.60 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 34 7030-108-A-0 Removal of Driveway 35 7030-108-H-1 Driveway, Paved, PCC, 8" (Thickness) 36 7030-108-H-1 Driveway, Paved, HMA, 4" (Thickness) 800.00 SY $ 2.00 $ 1,600.00 2500.00 SY $ 40.00 $ 100,000.00 800.00 SY $ 18.50 $ 14,800.00 37 7030-108-H-2 Driveway, Granular 100.00 TON $ 12.00 $ 1,200.00 Division 7040 - Pavement Rehabilitation 38 7040-108-A-0 Full Depth Patches HMA Sub Total $ 117,600.00 3500.00 SY $ 80.00 $ 280,000.00 Division 8010 - Traffic Signals & Lighting 39 8010-108-B-1 Conduit, Trenched, HDPE, 1 1/2" Sub Total $ 280,000.00 70000.00 LF $ 1.50 $ 105,000.00 40 8010-108-B-1 Conduit, Trenchless, HDPE, 1 1/2" 2000.00 LF $ 25.00 $ 50,000.00 41 8010-108-F.1 Fiber Optic Vault Precast Concrete 7.00 EA $ 3,500.00 $ 24,500.00 42 8010-108-F.2 Fiber Optic Vault - Composite 43 8010-108-G-0 Connections to Handholes and Vaults IDOT Division 2528 - Traffic Control 44 IDOT 2528.04-A Traffic Control Division 9010 - Seeding 45 9010-108-A-0 Conventional - Seeding, Fertilizing, and Mulching, Type 1 46 9010-108-A-0 Conventional - Seeding, Fertilizing, and Mulching, Type 2 16.00 EA $ 1,800.00 $ 28,800.00 2.00 EA $ 200.00 $ 400.00 Sub Total $ 208,700.00 1.00 LS $ 20,000.00 $ 20,000.00 Sub Total $ 20,000.00 10.00 AC $ 2,600.00 $ 26,000.00 40.00 AC $ 2,400.00 $ 96,000.00 47 9010-108-E-0 Warranty Division 9040 - Erosion and Sediment Control 1.00 LS $ 4,000.00 $ 4,000.00 Sub Total $ 126,000.00 48 9040-108-A-2 SVVPPP Management 1.00 LS $ 4,000.00 $ 4,000.00 49 9040-108-A-3 SWPPP Qualifying Rainfall Event Inspection 24.00 EA $ 125.00 $ 3,000.00 50 9040-108-F-1 Wattles, Wood Fiber, 9" 10000.00 LF $ 2.60 $ 26,000.00 51 9040-108-F-2 Wattles, Removal 10000.00 LF $ 0.50 $ 5,000.00 52 9040-108-J-0 Rip Rap, Class E 2000.00 TON $ 36.00 $ 72,000.00 53 9040-108-N-1 Silt Fence or Silt Fence Ditch Check 20000.00 LF $ 1.70 $ 34,000.00 54 9040-108-N-2 Silt Fence or Silt Fence Ditch Check, Removal of Sediment 20000.00 LF $ 0.70 $ 14,000.00 55 9040-108-N-3 Silt Fence or Silt Fence Ditch Check, Removal of Device 20000.00 LF $ 0.50 $ 10,000.00 56 9040-108-0-2 Stabilized Construction Entrance Wt 300.00 TON $ 50.00 $ 15,000.00 57 0 500.00 0 $ 30.00 $ 15,000.00 58 0 500.00 0 $ 20.00 $ 10,000.00 59 0 1000.00 0 $ 3.00 $ 3,000.00 Division 9060 - Fence Sub Total $ 211,000.00 60 IDOT 2519.04-F Removal and Reinstallation of Existing Fence, Barbwire, 5 Wire 400.00 LF $ 20.00 $ 8,000.00 Miscellaneous Work - Non-SUDAS 61 0 Water Booster Station 1 62 0 Water Booster Station 11 Sub Total $ 8,000.00 1.00 LS $ 560,000.00 $ 560,000.00 1.00 LS $ 862,000.00 $ 862,000.00 63 0 Water Storage Reservoir 1.00 LS $ 650,000.00 $ 650,000.00 Sub Total $ 2,072,000.00 TOTAL $ 7,043,151.10 CONTINGENCY $ 704,315.11 ENGINEERING $ 475,545.52 TOTAL CONSTRUCTION ESTIMATE $ 8,223,011.73