Loading...
Interstate Power DICW Extension AgreementTHE CITY OF DUB E ~~-~ MEMORANDUM H• ~~ G n March 27, 2007 ~ u' _ ~ ~, ~:, m TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager 0 J ~~ A ~ ;~ N .', J t--~-I `____ ~, -.' ``'~ `~' c7 ~~:. . ~.:, SUBJECT: Dubuque Industrial Center West 3rd Addition -Chavenelle Road Lighting Interstate Power & Light Company Electric Facilities Extension Agreement City Engineer Gus Psihoyos is recommending execution of an agreement with Interstate Power to activate the second power pedestal for electrical service on the easterly side of Chavenelle Road in Dubuque Industrial Center West. I concur with the recommendation and respectfully request Mayor and City Council approval. ti~ ~ Mic el C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CTTY OF DuB E MEMORANDUM ~-~~ March 26, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Dubuque Industrial Center West 3rd Addition -Chavenelle Road Lighting Interstate Power & Light Company Electric Facilities Extension Agreement INTRODUCTION This memorandum is to seek authorization to approve the Electric Facilities Extension Agreement between Interstate Power and Light Company (Interstate Power) and the City of Dubuque to provide electric service for roadway lighting along Chavenelle Road. BACKGROUND The Dubuque Industrial Center West 3rd Addition is a 150-acre project that involved the installation of storm sewer, watermain, paving, fiber optic conduit, landscaping, and streetlights at the former Bergfeld farm property and the east and west sections of Chavenelle Road through the McFadden farm. The 25 streetlights along the south side of Chavenelle Road are serviced by two (2) power pedestals. In January, 2007, 15 of the 25 streetlights on the westerly side of Chavenelle Road were activated. DISCUSSION In order to energize the remaining 10 streetlights on the easterly side of Chavenelle Road, Interstate Power and Light Company requires the execution of the Electric Facilities Extension Agreement. The key elements of this Agreement include: 1. Interstate Power will construct, install, maintain, and operate the second power pedestal to service these 10 streetlights on the easterly side of Chavenelle Road. 2. The City will provide a nonrefundable amount of $10,138.48 for the estimated installation cost. 3. The City agrees to furnish at its expense all necessary easements and permits required for the said installation. 4. The City agrees to physically mark the location of all obstacles that lie underground within 10 feet of proposed excavation. 5. Title to all electric facilities will remain with Interstate Power. RECOMMENDATION recommend that the City Council authorizes the City Manager to execute the Facilities Extension Agreement between Interstate Power and Light Company and the City of Dubuque to activate the second power pedestal for electrical service on the easterly side of Chavenelle Road. BUDGET IMPACT The estimated installation cost of $10,138.48 will be funded from the Dubuque Industrial Center West 3~d Addition and Chavenelle Road Extension (CIP 3601481). ACTION TO BE TAKEN The City Council is requested to authorize the City Manager to execute the Facilities Extension Agreement between Interstate Power and Light Company and the City of Dubuque to activate the second power pedestal for electrical service to the streetlights on the easterly side of Chavenelle Road. Prepared by Robert Schiesl, Assistant City Engineer cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director David Heiar, Economic Development Director David Ness, Civil Engineer Interstate Power and Light Co. An Alliant Energy Company ~ ~ ALLIANT ~~.1 ENERGY, February 28, 2007 City of Dubuque Attn: Robert Schiesl, PE Asst. City Engineer 50 W 13th St. Dubuque, IA 52001 8000 Chavenelle Road Dubuque, IA 52002-9670 Offices 1.800.822.4348 www.al liantenergy.com Re: Interstate Power & Light Company electric Facilities Extension Agreement Contribution in Aid of Construction Dear Mr.Schiesl: Enclosed please find two copies of the electric Facilities Extension Agreement. The cost for the electric installation will be $10,138.48. This estimate is good for a period of 30 days from date of receipt. This is the amount to be paid to Interstate Power 8~ Light Company thirty (30) days prior to the commencement of construction. On each agreement under the Customer/Developer header you will need to complete the following fields: • By: Owner Signature • Title: Owner Title Your prompt response to return both original electric Facilities Extension Agreements with Exhibits and your payment to the address listed below is appreciated. Interstate Power 8 Light Company -Attn: Val Driscoll 8000 Chavenelle Dubuque,lA 52002 An original electric Facilities Extension Agreement with Exhibits will be returned to you by mail after Interstate Power and Light Company management has signed the agreement. If you have questions, please call Mike Roth at 563-587-4538. D ~Gt.E? I Y Val Driscoll Asst.Engr.Clerk (Enclosure: 2 Agreements with exhibits) ALLIANT INTERSTATE POWER 8~ LIGHT COMPANY ENERGY. ELECTRIC FACILITIES EXTENSION AGREEMENT Contribution in Aid of Construction Contract No. ,Z 9~~~ This agreement made this 28`~ day of February, 2007 by and between Interstate Power and Light Company, an Iowa corporation headquartered at 200 First Street SE, Cedar Rapids, Iowa, (hereinafter referred to as "the Company") and City of Dubuque, acorporation/partnership/proprietorship with principal offices at City of Dubuque, State of Iowa, (hereinafter referred to as "the Customer/Developer"): WITNESSETH: WHEREAS, the Company is engaged in the distribution of electricity, and WHEREAS, the Customer/Developer is the owner of the following legally described premises: Chavenelle Rd, East end street lite controller, as shown on the map attached hereto (marked Exhibit A) and made a part hereof and; WHEREAS, the Company desires to sell electricity to the owners or occupants of the residences, or other buildings being built or installed on said premises, and the Customer/Developer desires to have electricity available for such residences or other buildings, hereinafter called "Electric Service". NOW, THEREFORE, IT IS MUTUALLY AGREED AS FOLLOWS: The Company agrees to construct, install, maintain and operate electric distribution facilities to serve said premises upon application for Electric Service made by the owner or occupant of each such residence or other building. The Customer agrees to contribute anon-refundable amount of $10,138.48, to the Company for the estimated cost of construction of electric facilities, less credits, as set out in Exhibit B, attached. The Contribution In Aid of Construction or portions thereof will not be refunded for any subsequent connections made to the electric facilities extension 3. The Customer/Developer agrees to furnish at his own expense all necessary easements and permits required for the installation of said electric facilities. Prior to underground electric facilities installation the customer/developer agrees to install lot pins and have existing grade within six inches of final grade. Prior to overhead electric facilities installation the customer/developer agrees to install lot pins and have existing grade within one foot of final grade. The Customer/Developer and the Company will cooperate so that said construction and installation can be accomplished in the most economical manner. 4. The Customer/Developer agrees to physically mark the location of all obstacles on Customer/Developer's site that lie underground within ten feet of proposed excavation. Such obstacles may include, but are not limited to, septic and sewer systems, buried wire for out-buildings or decorative lighting, drain tiles and LP gas lines. The Customer/Developer shall mark the location of all such obstacles with stakes or flags or by painting the ground prior to and maintained until commencement of the proposed excavation. The Customer/Developer accepts full responsibility for any and all damage to, or damage caused by, Company or its contractor striking any such underground obstacles the Customer/Developer fails to mark or marks incorrectly. 5. Title to all electric facilities installed pursuant to this agreement shall be in the Company Page 1 75-2537 11/06 6. Applications for electric service referred to above shall be subject to and pursuant to applicable rules and regulations of the company effective at the date of said applications with respect to the availability of electricity and the rates and charges for same. IN WITNESS WHEREOF, the parties hereto have executed this agreement the day and year first above written. INTERSTATE POWER AND LIGHT COMPANY By Wayne Kenniker Title Manager of Substations CUSTOMER/DEVELOPER Tax ID #42-6004596 By Michael Van Milligen City Manager Page 2 75-2537 11 /06 Interstate Power & Light Company (Applicable to the Iowa Service Area) EXHIBIT "B" ATTACHED ELECTRIC FACILITIES EXTENSION AGREEMENT Date: 2!28121]07 Customer Name: CITU OF DUB Mailing Address: 50 W 13TH ST Phone # DUBUQUE, IA Account # Project Address: CHAVENELLE RD EAST STREET LIGHT CONTROLLER WR # Contract # The electric project contemplated herein is based upon the Company's Standard Charges for installation of new facilities. Standard CMrge Deacrlptlon BCrolld. GTY Installed Cost Iowa Free Service Footage = span tl Iowa Frae Trenching Footage for this Service = H Service Installed Standard Charge = $0.00 bwa Contlibulion Tax Adder = 36.84 Tax Amount = $0.00 Total Non-Refundable Contribution In Aid of Construction (for Service) Required = 50.00 Standard Charge Description BCllll~ng OTY Installed Coat Otlrsr Total Non-Refundable Temporary Service ai Meter Pole Payment Required = 50.00 Standard Charge Dasalptlon BCIII~ pTY Installed Cost otatrier.n"" 1 PHASE CABLE ONLY-UNDERGROUND PRIMARY-it2 AL ___ E-26 1,030 span feet $1,648.00 _ 1 PHASE UNDERGROUND TRANSFORMER ASSEMBLY -FROM PAD EOUIPMENT_ _ _ E-32 __ _ __ 1 each _ $1,093.00 1 PHASE TRANSFORMER COST DIFFERENCE OH TO UG ALL XFMRS 8 VOLTAGES E-34 1 each $508.00 TRENCH/PLOW I.19 e70 feet 52,523.00 DIRECTIONAL BORING-2' I-10 160 feet 51,744.00 DUCT -PVC 2" # of Ducts = 1 I-12 160 feet $464.00 LABOR -CABLE PULLING (PER FOOT PER DUCT) # of Ducts - 1 I-6 160 feet $288.00 ELECTRIC 2 PERSON CREW SET-UP FEE (OH OR UG) E-21 1 each $449.00 Total Extension Installetl Standard Charge = $8,717.00 Marginal E58maled Future Revenue Allowance • -$1,308.00 Total Extension Cost without Tax Adder = $7,409.00 bwa Contribution Tax Adder = 38.84% Tax Amount = $2,729.48 Total Non-Refundable Contribution In Aid of Construction (for Extension) Required = 110,138.48 Total Project Cost = 510,138.48 ~~_ OMMENTS: XTEND PRIMARY AND ENERGIZE EAST STREET LIGHT CONTROLLER ON CHAVENELLE RD version: 200G10-06