Loading...
City Hall Parking Lot ReconstructionTHE CITY OF DuB E MEMORANDUM ~-~ March 27, 2007 £'? ~ ~ ~ ~ TO: The Honorable Ma or and Cit Council Members y y ~ ~ C ~ N ~ CL^ ,.,.~ s_ FROM: Michael C. Van Milligen, City Manager ~; G~~> _..._ C~ f'tl SUBJECT: City Hall Parking Lot Reconstruction -~ ~ h °• 0 (CIP 7301843) n' r°, City Engineer Gus Psihoyos is recommending City Council approval of the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity for the City Hall Parking Lot Reconstruction Project. This estimated $838,477 project will provide for the reconstruction of underground utilities, adjacent sidewalks, perimeter lighting, parking lot sub-base and the construction of new 7-inch thick concrete pavement. The project will also provide for the installation of new perimeter fencing that complements the historical features of City Hall. All existing overhead electric lines and services will be transferred to underground. The existing generator and electrical cabinets will be screened with an enclosure that matches the proposed perimeter fencing. The Engineering Department has coordinated with the Leisure Services Department to design landscaping for the parking lot that will allow for the installation of bioswales. The purpose of the bioswales is to intercept the storm water prior to entering the storm sewer system so as to allow for a large percentage of the impurities to be filtered out. An alternate is also proposed for this project to allow for the City of Dubuque to receive bids on the option of reusing purington brick pavers for the parking stalls. I concur with the recommendation and respectfully request Mayor and City Council approval. L! ~ / ~~ Michael C. an Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM ~,-~-~ March 26, 2007 TO: Michael C. Van Milligen, City Manag n FROM: Gus Psihoyos, City Engineer . SUBJECT: City Hall Parking Lot Reconstruction (C I P 7301843) INTRODUCTION The enclosed resolutions are in reference to the public hearing on the City Hall Parking Lot Reconstruction Project. DISCUSSION The City Hall Parking Lot Reconstruction Project will provide for the reconstruction of underground utilities, adjacent sidewalks, perimeter lighting, parking lot sub-base and the construction of new 7-inch thick concrete pavement. The project will also provide for the installation of new perimeter fencing that complements the historical features of City Hall. All existing overhead electric lines and services will be transferred to underground. The existing generator and electrical cabinets would be screened with an enclosure that matches the proposed perimeter fencing. The following utility upgrades and repairs are included: • The reconstruction of 3 deteriorated brick manholes. • The reconstruction of approximately 520 lineal feet of watermain, mainline valves, fire hydrants, and the replacement of 3 lead commercial water services. The cost of the individual lead commercial water service replacements will be assessed to each respective private property owner. • The project also provides for the construction of approximately 135 lineal feet of new storm sewer and 2 catch basins to complement bioswales that are proposed for the medians. • The installation of fiber optics and telecommunications conduit infrastructure are proposed to improve connectivity with City Hall. This will include 485 lineal feet of 4-inch conduit with inner ducts and the construction of two fiber optic manholes. The installation of 6 electrical service pedestals and 6 water lawn hydrants to provide for the future electrical and water needs of the Farmer's Market and other festivals. The sidewalks are proposed to be replaced with new decorative buff-colored sidewalk that follows the downtown decorative sidewalk standard. The sidewalks would be illuminated at night by historic pedestrian lighting. These pedestrian light poles would be placed around the perimeter of the parking lot. In addition, electrical service pedestals and water hydrants would be placed around the perimeter of the parking lot similar to those installed at Washington Park. This would serve the future power and water needs of festivals and the Farmer's Market. The Engineering Department has coordinated with the Leisure Services department to design landscaping for the parking lot that will allow for the installation of bioswales. The purpose of the bioswales is to intercept the storm water prior to entering the storm sewer system so as to allow for a large percentage of the impurities to be filtered out. Parking lots tend to have a lot of impurities such as oil residue, antifreeze, metals, etc. The bioswales provide the appropriate vegetation to allow for the removal of these impurities prior to them entering the storm sewer and ultimately the Mississippi River. An alternate is also proposed for this project to allow for the City of Dubuque to receive bids on the option of reusing purington brick pavers for the parking stalls. This alternate would provide for the ability to recycle old pavers formerly used on City streets and use them as part of the parking lot paving surface. The pavers would provide for asemi- pervious paving surface that would help recharge the existing water aquifer, minimize runoff and improve the water quality of the runoff. Currently it is anticipated there will not be sufficient funding to support this alternate based on the engineer's estimate. If favorable bid prices are received, this alternate can be considered for inclusion in the project. An additional alternate is also being proposed. This alternate would provide for the installation of heat tubes in the sidewalk along the 13th side of City Hall. The heat tubes would be installed to provide for the future connection to a heat pump. The system, when connected and operational, would provide snow melt capacity similar to what is currently in place on the east and west sides of City Hall. This alternate only provides for the installation of the heat tubes and does not provide for afully-functional snow melt system at this time. This project would occur concurrently with the City Hall Envelope Restoration (Tuckpointing) Project. City staff will coordinate the construction activities to minimize disruption to this project. Staff also will be coordinating with Dubuque Main Street Ltd. to minimize disruption to the Farmer's Market. City staff will also work with Thompson Properties (Oky Doky Food Mart and Breezy's Cafe) to minimize disruption of their businesses during the construction of the parking lot and alley behind the businesses. BUDGET IMPACT The estimate of probable cost for City Hall Parking Lot Reconstruction Project is summarized as follows: Estimate Construction Contract $ 631,207.55 Contingency (10%) 63,120.76 Construction Engineering & Inspection (15%) 104,149.25 Alliant Utility Relocate 40,000.00 Total Project Cost $ 838,477.55 The project funding summary is as follows: CIP No. Fund Description Fund Amount 7301843 Renovation of City Hall Parking Lot $ 570,000.00 Special Assessment -Funding Total 6,003.88 1001045 City Hall Maintenance/Remodel 51,472.93 3501425 City Owned Sidewalks 12,175.63 1021608 Downtown Street Light Replacement 52,624.00 1001549 Street Light Replacement 25,000.00 7401405 Watermain Replacement Program 71,423.35 7101335 Sanitary Sewer Manhole Replacement Program 7,602.65 7201363 Gunite Rock Storm Sewer 22,232.38 1021609 Fiber Optic Conduit -Private Subdivision and Misc. Projects 19,942.73 Total Project Funding $ 838,477.55 The City Hall Parking Lot Reconstruction Project will be funded through the annual capital improvement project appropriation of City funds as noted above in the amount of $832,473.67. The project, as outlined, will require Special Assessments in the amount of $6,003.88. An alternate is proposed to use recycled purington pavers in the drive stalls of the parking lot. If this alternate is selected, it is currently estimated that it would cost an additional $109,881. There currently isn't sufficient funding to support this alternate. Favorable bid prices could change that however. PROPERTY ASSESSMENTS Three private lead water services are proposed to be replaced as part of this project. The three services currently serve the Thompson Properties Buildings (Oky Doky Food Market and Breezy's Cafe). These services would be directly assessable to the property owner who would bear 100% of the cost for these services. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity for the City Halt Parking Lot Reconstruction Project. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity for the City Hall Parking Lot Reconstruction Project. Prepared by Jon Dienst, Civil Engineer Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Bob Green, Water Plant Manager Don Vogt, Public Works Director Tim Horsfield, Parking Division Manager Gil Spence, Leisure Services Manager Deron Muehring, Civil Engineer Dave Ness. Civil Engineer RESOLUTION NO. 195-07 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE CITY HALL PARKING LOT RECONSTRUCTION PROJECT Whereas, the City Council has proposed a Resolution of Necessity for the City Hall Parking Lot Reconstruction Project has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: x Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Preliminary Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of , 2007, next at 6:30 p.m. in the Public Library Auditorium, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adopted and approved this 2nd day of April, 2007 Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 194-07 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE CITY HALL PARKING LOT RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the City Hall Parking Lot Reconstruction Project, in the estimated amount $838,477.55, are hereby approved. Passed, adopted and approved this 2nd day of April , 2007. D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk