Heeb Street Retaining Wall Project AcceptanceTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 18th & Heeb Street Retaining Wall Slope Stabilization Project CIP 3602481 DATE: June 9, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 18th & Heeb Street Retaining Wall Slope Stabilization Project, as completed by Drew Cook & Sons Excavating, Inc., in the final contract amount of $91,230.28, which is a 23.3% increase from the original contract amount of $73,985.00. The additional contract cost was primarily due to an increase in quantity for the stone fill material ($7,500), additional clean stone ($3,200) and specialized concrete sawing equipment ($2,100). I concur with the recommendation and respectfully request Mayor and City Council approval. 7-. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, Cty Engineer THE CITY OF Dui Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 18th & Heeb Street Retaining Wall Slope Stabilization Project CIP 3602481 DATE: June 6, 2014 INTRODUCTION Dubuque 1110! 2007 • 2012 •2013 The enclosed resolution provides for the acceptance of the construction contract for the 18th & Heeb Street Retaining Wall Slope Stabilization Project. BACKGROUND After evaluating several repair alternatives, the City Council authorized the staff to proceed with the acquisition of 20 West 18th Street which allowed for stabilizing the wall and slope rather than reconstructing the stone retaining wall along Heeb Street. The 18th & Heeb Street Retaining Wall Slope Stabilization Project was authorized by City Council as an emergency repair project. DISCUSSION The slope stabilization project included stabilizing the 18th/Heeb retaining wall by constructing an engineered fill support buttress slope, remove the 18th St. stairs, complete street repairs and miscellaneous related work. The 18th & Heeb Street Retaining Wall Slope Stabilization construction contract was completed by Drew Cook & Sons Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $91,230.28, which is a 23.3% increase from the original contract amount of $73,985.00. The additional contract cost was primarily due to an increase in quantity for the stone fill material ($7,500) that was used to construct the buttress embankment slope, additional clean stone ($3,200) that was placed as drainage material behind the original stone wall, and specialized concrete sawing equipment ($2,100) that was used to safely remove the lower section of suspended concrete stairs. RECOMMENDATION I recommend that the City Council accept the public improvements, establish the final project contract amount in the amount of $91,230.28 and authorize final payment to the contractor. BUDGET IMPACT The cost summary for the 18th & Heeb Street Retaining Wall Slope Stabilization construction contract is as follows: The overall project cost for the 18th & Heeb Street Retaining Wall Slope Stabilization Project, including property acquisition and building demolition is as follows: AWARD FINAL Construction Contract $ 73,985.00 $ 91,230.28 Contingency (15%) 11,097.75 Residential Property Acquisition Consultant Design Services 16,589.25 16,589.25 Construction Engineering & Inspection 12,762.41 15,443.16 Total Construction Project Cost: $ 114,434.41 $ 123,262.69 The overall project cost for the 18th & Heeb Street Retaining Wall Slope Stabilization Project, including property acquisition and building demolition is as follows: The funding for the 18th & Heeb Street Retaining Wall Slope Stabilization Project will be as follows: CIP No. FINAL Construction Contract (Slope Stabilization) $ 91,230.28 Consultant Design Services 16,589.25 Construction Engineering & Inspection 15,443.16 Residential Property Acquisition 74,946.88 Building Demolition 19,541.00 Other Miscellaneous Expenses 9,057.51 Total Project Cost: $ 226,808.08 The funding for the 18th & Heeb Street Retaining Wall Slope Stabilization Project will be as follows: CIP No. Fund Description Fund Amount 3602481 18th & Heeb Street Retaining Wall Slope Stabilization $ 226,808.08 ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolution to accept the public improvements and to authorize the final payment of the contract amount of $91,230.28 to Drew Cook & Sons Excavating, Inc. for the 18th & Heeb Street Retaining Wall Slope Stabilization Project. Prepared by Greg J. Doeden, Civil Engineer cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer RESOLUTION NO. 170-14 ACCEPTING THE 18TH & HEEB STREET RETAINING WALL SLOPE STABILIZATION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 18th & Heeb Street Retaining Wall Slope Stabilization Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 18th & Heeb Street Retaining Wall Slope Stabilization appropriations for the contract amount of $91,230.28 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of June, 2014. Attest: Kevin Firnstahl, ity C erk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 18TH & HEEB STREET RETAINING WALL SLOPE STABILIZATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 18th & Heeb Street Retaining Wall Slope Stabilization Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $123,262.69. Dated this day of , 2014. Filed in the office of the City Clerk on they% qday o City Enginee , 2014. i s Firn" 'I, City Clerk LINE NO. Masterpiece on the Mississippi PROJECT NAME: ITEM NUMBER 1 1010-103 City of Dubuque - Engineering Division Project Close Out Form 18TH & HEEB ST. RETAINING WALL SLOPE STABILIZATION PROJECT CONTRACTOR: ADDRESS: CITY, STATE, ZIP: Drew Cook & Son's Excavating, Inc. 5200 Wolff Road Dubuque, Iowa 62002 BID ITEM DESCRIPTION Division 1 - General Provisions Mobilization AMOUNT OF CONTRACT AMOUNT: $ TOTAL CHANGE ORDERS TO DATE: $ REVISED CONTRACT AMOUNT: $ CONTRACT QUANTITY UNIT UNIT COST 73,985.00 10,142.20 84,127.20 PREVIOUS TOTAL TO DATE QUANTITY AMOUNT 1.00 LS $ 2100.00 1,00 5 2,100.00 Division 2010 - Earthwork, Subgrade, and Subbase 2 2010.108-C-0 Clearing and Grubbing C 3 2010-108.0.1 Topsoil, On-site 4 2010-108-0-3 . Topsoil, Off-site 5 2010.108-E-0 Excavation Class 10 CURRENT QUANTITY AMOUNT Sub Total $ 2,100.00 Sub Total $ 1.00 LS $ ...2800.00 1.00 ;5-. 2800:00 30.00 CY. $ 10.00 $ 335.00. CY $ 35.00 351.00 $ 12285.00 540.00 _CY 9 17.00 674.94 $ - 11473.98 COUNCIL ACCEPTANCE DATE: 16 -Jun -14 TOTAL TO DATE QUANTITY AMOUNT o5 COMP. 1.00 5.. 2,100.00 100.00% Sub Total $ '2,100.00. 6 2010.108-E-0. Excavation Class 12 7 2010-108-1-0 Subbase, Granular Subbase- Gradation 12a 8 2010-10841 Removal of Structure 100.00 , CY. 9 20.00 20.45. $ 409.00 25.00 TON $ 16.00. $ 1.00 EA $ 1750.00 1.00 $ 1750.00 9 2010-108-H-0 Subgrade Treatment 10 2010-10840 Subbase Coarse Aggregate Subbase -.6".Breaker Division 4040 - Subdratns and Footing Drain Collectors 350.00 -SY $ 5.00 393.67' $ 1968.35 950.00 TON 5 .14.50. 1459.72 5 .21'165.94 Sub Total $ 51,852.27 Sub Total $ 1.00 $ 2,800.00 100.00% $ 351.00 $ 12.285.00 104.78% 674.94 $ 11473.98 124.99% 20.45 S 409.00_ 20.45% $ 1.00 $ 1,750.00 100.00% 393.67 8 1.968.35 112.48% 1459.72 S 21 185.94 153.65% Sub Total 5 51,852.27 11 .4040.108-A-0 Subdraln, 4" Perforated CPE 130.00. LF $ 4.00 140.00 $ 560.00 140.00 S 560.00 107.69% 12 .4040-108.0-0 Subdrain Cleanout: 4" PVC Sch 40 2.00 EA $ 460.00 2.00 $ 92000 200 $ 920.00 10000% 13 4040.108-D-0 Subdraln Outlets and Connections, Core Drill, 4". 1.00 EA. $ 175.00 1.00 $ 175.00 1.00... 5.... 175.00 100.00% 14 4040.108-G-0 Fill, Porous Backfill -:Gradation 29 200.00. TON $ 15.50 $ $ - Division 5010 - Pipe and Fittings 15 5010-108.4.0 Removal and Salvage -. Water Main Fittings and Appurtenances Sub Total $ 1,655,00 Sub Total S Sub Total $ :1,655.00 1.00 LS $ 2,175.00 1.00 $ 2,175.00 Division 7010 -Portland Cement Concrete Pavement 16 7010-108-A-0 Temporary Pavement, PCC, 4" (Thickness) Sub Total $ 2,175.00 $ 75.00 SY $ 30.00 23.17 5 695.10 Division 7030 -Sidewalks, Shared Use Paths, and Driveways 17 7030-108-A-0 Removal of Sidewalk & Steps Sub Total $ 695.10 $ 51.00 SY $ 125.00 52.60 $ 8,575.00 Division 7040 - Pavement Rehabilitation 10 7040-108-1-1-0 Removal - Pavement Sub Total $ 6,575.00 $ 75.00 SY'. S 8.00 37.87 $.. 302.96 Division 8030 - Traffic Control 19 IDOT 2528.04-A Traffic Control $ 3 Sub Total $ 302.96 Sub Total $ 1.00- LS $ 1000.00 1.00 3 1000.00 1.00 $ 2,175.00. 100.00% Sub Total $ 2,175.00 .23.17 $ 695.10 30.89% Sub Total $ 696,10 52.60 $ ..6,575.00 103.14% Sub Total $:... .6,575.00 37.87 $ .:302.96 50.49% Sub Total $ 302.96 20 IDOT 2528.04-C Temporary Barrier Rail Division 9010 - Seeding 68.00 LF $ 85.00 77.76.. $ 6 608.75 Sub Total $ 7,608.75 Sub Total $ 21 9010-108-13-0 Hydraulic -Seeding, Fertilizing and Mulching, Native Grass & Wildflower Ser 0.20 AC. $ 8 000.00 0.20 $ 1.600.00 Sub Total $ 1,600,00. Sub Total $ Division 9040- Erosion and Sediment Control 22.. 9040.188-D-1. Filler Socks, 8'. 23 9040.108-D-2 Filler Socks, Removal 24 9040-108-R-0 Tuff Reinforcement Mal, TRM Type 2 100.00 LF $ 6.00 471.00. '$ 2 826.00 100.00 LF' $ 1.00 3 - 70.00. 50 5 43.00 86.00 5 3698.00 Sub Total $ 6,524.00 Sub Total $. 1.00 $ 1000.00 100.00% 77,75 $ 6.608.75 114,34% Sub Total S 7,608.75 0.20 3 1,600.00 100.00% Sub Total $ 1,800,00 471.00 $ 2 826.00 .471.0015 $ .86.00. 3 3 698.00 122.86% Sub Total $ 6,524.00 BASE AMOUNT EARNED TO DATE: $ 61,088.06 109.60% APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Drew Cook & Son's Excavating, Inc. contractor for the above Improvement, does hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement. CONTRACTOR BY TITLE: DATE: Drew Cook & Son's Excavating, Inc. Alternate Bid Items Altemate No. 1 AEC Premier Straw/Coconut Erosion Control Blanket 70.00 SO $ 21.00 $ 25 $ $ Altemate No. 2 Presto Geosystems Geoweb GW30V. 6 IN 26 70.00 S0 5 255.00 NO. CHANGE ORDER DESCRIPTION /EXTRA WORK ITEMS 1 Replace section of watermain because water corp. failed Sub Total $ Sub Total $ $ $ - Sub Total $ Sub Total $ CHANGE ORDER QUANTITY UNIT UNIT COST 2 Excavate test holes on site 3 Purchasing plywood and delivery 4._ Grout existing sewer lateral 5 Help Becker Slone move stone Worked with D.&D. on constructing concrete footing 7 Additional tree removal ()olal 00 5150.00 Each) 8 1" clean stone 9 Sawing existing elevated stairs by Iowa Wall Saw @ Central Avenue 10 Note: C.0.69 Minus 592.90 (Mistake on Mark-up). PREVIOUS QUANTITY AMOUNT.. SOb Total $ $ Sub Total $ ALTERNATE ITEMS AMOUNT EARNED TO DATE: BASE AMOUNT w/ALT. EARNED TO DATE: CURRENT QUANTITY AMOUNT 1$_ Is . 61,088.08.1 TOTAL TO DATE QUANTITY AMOUNT #DIV/01 #DIV/01 Comp. 1 LS. S 1251.32 1 S 1251.32 $ 1.00 5 1.25132 100.00% 1 L.S. $ 125.00. .1 $ 125.00 5 1.00 $ 125.00 100.00% 1 L.S. $ 865.08 1 $865.08 5 _. 1.00 $ 865.08 100.00%. 1 LS. $ 800.00 1 $ 800.00. $ 1.00 $ 800.00 100.00% 1 L.S. $ - -306.25. 1 S 308.25. $ 1.00 $ 306 25 100.00% 1 L.S. 5 1 137.50. 1 $ 1 137.50. 5: 1.00 5 1.137 50 100.00% 3 Each 5 150.00 3 $ 450.00 S 3.00 5 450.00. 100.00% 219.67 Ton $14.40 219.67. $ 316325.. $ 219.67 $ -3:163.25 100.0016 1 _ LS. $ 2.136.70 1 ..$ 2:136.70 $ 1.00 $ 2.13670 100.00% 1. LS. $ (92.90) 1 $ (92.90) $ _. 1.00 - $ (9290) 100.00%: 11 $ $ $ $ - #DIV/01 12 _ - $ $ $ - S. - .#DIV/01 13. $ - S 5 $ #0IV/01 14 _ _ -- - $ S $ $ #DIV/01 15 $ 5 S $ - #DIV/01 Change Order Amount Eamed to Date: I $ 10,142:20 I LINE N0. MATERIALS STORED ONSITE (Invoice No & Supplier Name) 1 2 3 4 5 6 7 e s 10 11 12 13 14 15 16 17 18 19 20 CHANGE ORDER QUANTITY UNIT UNIT COST PREVIOUS QUANTITY AMOUNT. 5 Total Amount Inc. Change Orders Eamed to Date:. CURRENT QUANTITY AMOUNT 1$ 91.230.28 1 TOTAL TO DATE QUANTITY AMOUNT $ $ $ $ $ $ a $ $ $ s - s s s $ $ - $ $ a - s $ $ Total Materials Stored to Date: CIP NO. $ 91,230.28 1 PAYMENTS PREVIOUSLY APPROVED: 1 $ 64,275.19 2 $ 22,393.58 3 $ 4 $ 5 $ 6 $ - 7 $ 85 9 5 10 $ 11 $ 12 5 13 $ 14 5 Relalnage $ TOTAL PAYMENTS FORWARDED: 4,561.51 Project Cost 1 Funding Summary Construction Materials Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost Funding 3602481 5 91.230.28 $ .- $ 32.032.41 5 ...123.262.69 $ $ $ $ s $ $ $ _S -. _ $ $ 5 5- -. $ $ $ $ $ 5 $ $ $ 5 5 S $ 5 . - $ $ - $ S $ $ - 5 S $ $ - $ - $ 5 $ Total: $ 91,230.28. $ $ .32,032.41. $. 123,262.69. $ Final Project Cost Summary Total Amount Eamed: $ 91,230.28 Stored Materials: $ Total Due Contractor: $ Total Engineering: $ Total Project Cost: $ 91,230,28 32,032.41 123,262.69 CERTIFICATE OF THE CITY MANAGER: 1 hereby certify that the above statement shows in detail the re amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa Project Engineering Cost Summary CIP Project Summary Total Eng, Cost 3602481 $ 15.443.16 + + + + + + + + + + CIP $ Eamed to Date Retainage Ret. Release $ Amount to Date Contract Amt. 3602481. $ 91,230.28 5 4,561.51. $ - 5 5 - $ $ 5 $ $ 88,668.76 $ 73,985.00 s - $ $ $ 5 5- - - $ $ - $ g - $ - $ - _ S $ 15,443.16 5 - $ - 5 5 - $. - $ - $ $ - $ $ - $ - $ - $ $ $ - 5 $ $ - $ $ - S - S - 5. - $ $ 5 - - $ $ . Total 5 91,230.28 $ 4,561.51 $ • $ 86,668.76 $ 73,985,00 Project Cost 1 Funding Summary Construction Materials Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost Funding 3602481 5 91.230.28 $ .- $ 32.032.41 5 ...123.262.69 $ $ $ $ s $ $ $ _S -. _ $ $ 5 5- -. $ $ $ $ $ 5 $ $ $ 5 5 S $ 5 . - $ $ - $ S $ $ - 5 S $ $ - $ - $ 5 $ Total: $ 91,230.28. $ $ .32,032.41. $. 123,262.69. $ Final Project Cost Summary Total Amount Eamed: $ 91,230.28 Stored Materials: $ Total Due Contractor: $ Total Engineering: $ Total Project Cost: $ 91,230,28 32,032.41 123,262.69 CERTIFICATE OF THE CITY MANAGER: 1 hereby certify that the above statement shows in detail the re amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa Project Engineering Cost Summary CIP Project Engineering Costs Staff Consultant Total Eng, Cost 3602481 $ 15.443.16 + + + + + + + + + + $ 16.589.25. $ 32 032.41 $ $ $ - $ $ - $ 5 - $ 5 $ s - $ - $ - $ $ $ - 5 5 Total: $ 15,443.16 $ 16,589.25 $ 32,032.41 Project Cost 1 Funding Summary Construction Materials Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost Funding 3602481 5 91.230.28 $ .- $ 32.032.41 5 ...123.262.69 $ $ $ $ s $ $ $ _S -. _ $ $ 5 5- -. $ $ $ $ $ 5 $ $ $ 5 5 S $ 5 . - $ $ - $ S $ $ - 5 S $ $ - $ - $ 5 $ Total: $ 91,230.28. $ $ .32,032.41. $. 123,262.69. $ Final Project Cost Summary Total Amount Eamed: $ 91,230.28 Stored Materials: $ Total Due Contractor: $ Total Engineering: $ Total Project Cost: $ 91,230,28 32,032.41 123,262.69 CERTIFICATE OF THE CITY MANAGER: 1 hereby certify that the above statement shows in detail the re amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa