Loading...
Usha Park Parking Lot Project AcceptanceTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Usha Park Parking Lot Project CIP: 1001173 DATE: June 9, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Usha Park Parking Lot Project, as completed by Drew Cook and Sons Excavating, in the final contract amount of $104,639.01, which is 9.8% over the contract amount of $95,294.00. The project cost increase is due to additional concrete removal and replacement required due to late construction and adverse weather this winter. Additional seeding and stabilization was required due to concerns from possible spring storms. I concur with the recommendation and respectfully request Mayor and City Council approval. Ws, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dui Masterpiece on the Mississippi TO: Michael C. VanMilligan, City Manage, FROM: Gus Psihoyos, City Engineer SUBJECT: Usha Park Parking Lot Project CIP: 1001173 DATE: June 6, 2014 INTRODUCTION Dubuque kfittl AFAmericatily 11111, 2007 • 2012 • 2013 The enclosed resolutions provide for the acceptance of the construction contract for the Usha Park Parking Lot Project. BACKGROUND The Usha Park Parking Lot Project included construction of a concrete parking that provided for 25 parking stalls. The parking lot was graded to allow for future expansion. The parking lot has a 270 foot long bio -filtration trench constructed on the east and north sides to capture rainfall runoff. The bio -filtration trench contains a sand/compost/topsoil mixture that allows the storm water runoff to infiltrate into the ground. DISCUSSION The Usha Park Parking Lot Project was completed by Drew Cook and Sons Excavating of Dubuque, Iowa in the final contract amount of $104,639.01 which is 9.8% over the contract amount of $95,294.00. The project cost increase is due to additional concrete removal and replacement required due to late construction and adverse weather this winter. Additional seeding and stabilization was required due to concerns from possible spring storms. BUDGET IMPACT The project cost summary for the Usha Park Parking Lot Project is: The funding summary for the project is as follows: CIP Award Final Construction Contract $95,294.00 $104,639.01 Contingency 9,529.40 0.00 Construction Engineering & Inspection 15,723.51 13,959.18 Total Project Cost $120,546.91 $118,598.19 The funding summary for the project is as follows: CIP Fund Description Fund Amount 1001173 Usha Park Development $118,598.19 Total Project Funding $118.598.19 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the Usha Park Parking Lot Project. Prepared By: Jon Dienst, P.E. cc: Marie Ware, Leisure Services Manager Steve Fehsal, Park Division Manager Jenny Larson, Budget Director Don Vogt, Public Works Director RESOLUTION NO. 171-14 ACCEPTING THE USHA PARK PARKING LOT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Usha Parking Lot Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Usha Park Development appropriations for the contract amount of $104,639.01 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of June, 2014. Attest: Kevin F rnstahl, ity Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE USHA PARK PARKING LOT PROJECT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Usha Park Parking Lot Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $118,598.19. Dated this day of , 2014. Filed in the office of the City Clerk on the / day of City Engineer , 2014. �� Kevin S. Firnsta' City Clerk LINE NO. Masterpiece on the Mississippi PROJECT NAME: ITEM NUMBER City of Dubuque - Engineering Division Project Close Out Form Usha Park Parking Lot Project CONTRACTOR: ADDRESS: CITY, STATE, ZIP: Drew Cook B. Sons Exc. Inc.. 5200 Wolff Rd. Dubuque, IA 52002 BID ITEM DESCRIPTION Division 1- General Provisions 1 1010-103 Mobilization AMOUNT OF CONTRACT AMOUNT: $ TOTAL CHANGE ORDERS TO DATE: $ REVISED CONTRACT AMOUNT; $ CONTRACT QUANTITY UNIT UNIT COST Division 2010 - Earthwork, Subgrade, and Subbase 2 2010-108-D-1 Topsoil On-slte 3 2010-108-D-2 Topsoil Compost -amended 4 2010-108-E-0 Excavation Class 10 95,294.00 5,766.23 101,060.23 PREVIOUS TOTAL TO DATE QUANTITY AMOUNT CURRENT QUANTITY AMOUNT 1.00 LS $ 2,000.00 $ 1.00 $ 2,000.00 Sub Total $ 2,000.00 Sub Total $ COUNCIL ACCEPTANCE DATE: 16 -Jun -14 TOTAL TO DATE QUANTITY AMOUNT COMP. 1.00 $ 2,000.00 100.00% Sub Total $ 2,000.00 115.00 CY $ 10.00 $ 115.00 $ 1,150.00 - 115.00 $ 1 150.00 100.00% 200.00. CY $ 16.50 $ 200.00 $ 3 300.00 200.00 $ 3 300.00 100.00% 990.00 CY $ 11.50 $ 990.00 $ 11,385.00 - . 990.00 $ 11 385.00 100.00% 5 2010-108-1-0 Subbase Coarse Aggregate Subbase - 3" Breaker 500.00 TON $ 15.00 $ 6 2010-108-1-0 Subbase Granular Subbase - Gradation 12a 400.00 TON $ 16.00 $ 625.53 $ 10,008.48 825.53 $ 10.008.48 156.38% Division 4040 - Subdrains and Footing Drain Collectors 7 4040-108-A-0 Subdreln, 6" Perforated CPE 8 4040-108-D-0 Subdreln Outlets and Connections, Core Drill, 6" Sub Total _$ 25,843.48 Sub Total $ Sub Total $ 25,843.48 300.00 LF $ 6.10 $ 300.00 $ 1,830.00 300,00 $ 1,830.00 100.00% Division 7010 - Portland Cement Concrete Pavement 9 7010-108-A-0 Pavement, PCC, 6" (Thickness) 1.00 EA $ 500.00 $ 1.00 $ 500.00 1.00 $ 500.00 100.00% Sub Total $ 2,330.00 Sub Total $ Sub Total $ 2,330.00 1376.00 SY_.. $ 37.00 . $ 1,540.40 $ 56,994.80 1540.40 $ 55,994.80 112.03% Division 7020 - Hot Mix Asphalt Pavement 10 7020-108-8.0 Pavement or Overlay, HMA, & (Thickness). Division 8010 - Traffic Signals & Lighting 11 8010.108-B-1 Conduit, Trenched, PVC, 2" Sub Total $ 56,994.80 Sub Total $ - Sub Total $ 58,994.80 55.00 SY $ 45.00 $ 42.00 $ 1,890.00 42.00 _$ 1,890.00 76.36% Sub Total $ - 1,890.00 $ $ Sub Total $ 1,890.00 80.00 LF $ 10.00 $ 80.00 $ 800.00 80.00 $ 800.00 100.00% IDOT Division 2527 - Pavement Marking 12 IDOT 2527.04-A-1 Painted Pavement Markings Sub Total $ 800.00 $ 5 Sub Total $ 800.00 9.50 STA $ 20.00 $ 9.50 $ 247.00 9.50 $ 13 IDOT 2527.04-A-4 Painted Symbols and Legends 2.00 EA $ 65.00 $ 2.00 $ 130.00 2.00 $ IDOT Division 2528 Traffic Control 14 IDOT 2528.04-A Traffic Control Sub Total $ 377.00 $ $ Sub Total $ 1.00 LS $ 500.00 $ 1.00 $ 500.00 Division 8040 - Signing Materials 15 IDOT 2524.04-A Type A signs Sub Total $ 500.00 Sub Total $ 247.00 100.00% 130.00 100.00% 377.00 1.00 $ Sub Total $ 500.00. 100.00% 500.00 3.00 SF $ 175.00 $ 3.00 $ 525.00 3.00 $ 525.00 100.00% Division 9010 - Seeding 16 9010.108-A-0 Conventional - Seeding, Fertilizing, and Mulching; Type 1 Sub Total $ 525.00 Sub Total $ Sub Total $ 525.00 0.21 AC $ 7 500.00 $ 0.55 $ 4,125.00 0.55 $ 4,125.00 281.90% Division 9040 -Erosion and Sediment Control 17 9040.108-D-1 Filter Sacks, 12" Sub Total $ 4,125.00 Sub Total $ 400.00 LF $ 6.50 $ 425.00 $ 2 762.50 Sub Total $ 4,125.00 425.00 $ 2,782.50 106.25% 18 9040.108.0-1 Stabilized Construction Entrance 6.00. SQ $ 100.00 .$ 6.00 $ 600.00. 6.00 $ 600.00 100.00% 19 9040-108-P-1 Dust Control, Water 2.00 MGAL $ 150.00 $ - $ - 20 9040.108-R-0 Turf Reinforcement Mats, Propex Landlok 450 or Equal 3,20 SQ $ 110.00 $ - $ 21 9040-108-T-2 Inlet Protection Device, Maintenance 2.00 EA $ 125.00 $ 1.00 $ 125.00 1.00 $ 125.00 50.00% Sub Total $ 3,487.50 Sub Total $ Sub Total $ 3,487.50 BASE AMOUNT EARNED TO DATE: I $ 98,872,78 1 103.78% C.O. NO. CHANGE ORDER DESCRIPTION / EXTRA WORK ITEMS 1 Cost difference to use concrete sand in Neu of man sand - CHANGE ORDER QUANTITY UNIT UNIT COST 250 ton $ 6.00 PREVIOUS QUANTITY AMOUNT 250 $ 1500.00 CURRENT QUANTITY AMOUNT 2 Wood Excelsior mat, if used on project 91 SQ $ 18.00 90 $ 1,620,00 3 Pavement Removal (Cracked Panels) 4 Sawcut Pavement for removal 1111 SF $ 1.50 250 LF $ 4.00 1110.55 $ 1,605.83 245.1 $ 980.40 $ PAYMENTS PREVIOUSLY APPROVED: 1 $ 75,716.88 2 $ 22,714.52 3 $ 975.65 4 $_ 5 $ 6 $ 7 $ 8 9 10 $ 11 $ 12 $ 13 $ 14 $ Retalnage $ TOTAL PAYMENTS FORWARDED: 5,231.95 $ 104,639.011 TOTAL TO DATE QUANTITY AMOUNT Comp. 250.00 $ 1 500.00 100.00% 90.00 $ 1 620 00 98.90% 1,110.55 $ 1,665.63 99.98% 245.10 $ 98040 98.04% Total Amount Inc. Change Orders Eamed to Date: $ 104,639.01 Project Cost 1 Funding Summary Construction Materials. Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost .Funding 1001173 $ 104,839.01 $ - $ 13,959.18 $ 118,598.19 $ 100,000.00 $ $ $ $ ,s $ $ $ $ $ $ $ $ $ $ Total: $ 104,639.01 $ $ 13,959.18 $ 118,598.19 $ 100,000.00 Final Project Cost Summary Total Amount Earned: $ 104,639.01 Stored Materials: $ Total Due Contractor: $ 104,639.01 Total Engineering: $ 13,959.18 Total ProJect Cost: $ 118,598.19 Project Engineering Cost Summary CIP ProJect Summary Total Eng. . Cost 1001173 $ 13,959.18 CIP $ Eamed to Date Retalnage Ret. Release $ Amount to Date Contract Amt. 1001173 $ 104.639.01 $ 5,231.95 $ - $ 99,407.05 $ 95,294.00 $ $ - $ - $ $ $. - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ - $ - $ - $ 13,959.18 S - $ $ $ - $ - $ - $ - $ - $ $ $ $ - $ - $ - $ - $ - $ $ - $ - - $ $ $ - $ - $ - $ - . $ - $ - $ - $ - $ - $. - Total $ 104,639.01 $ 5,231.95 $ $ 99,407.05. S 95,294.00 Project Cost 1 Funding Summary Construction Materials. Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost .Funding 1001173 $ 104,839.01 $ - $ 13,959.18 $ 118,598.19 $ 100,000.00 $ $ $ $ ,s $ $ $ $ $ $ $ $ $ $ Total: $ 104,639.01 $ $ 13,959.18 $ 118,598.19 $ 100,000.00 Final Project Cost Summary Total Amount Earned: $ 104,639.01 Stored Materials: $ Total Due Contractor: $ 104,639.01 Total Engineering: $ 13,959.18 Total ProJect Cost: $ 118,598.19 Project Engineering Cost Summary CIP Project Engineering Costs Staff Consultant Total Eng. . Cost 1001173 $ 13,959.18 + + + + + + + + + + $ 13,959.18 5- $ $_. - $ $ - $ $ $ $ - _ $ $ - $ $ - $ $ - $ $ $ Total: $ 13,959.18 $ - $ 13,959.18 Project Cost 1 Funding Summary Construction Materials. Total Eng. Total Project CIP CIP Costs Stored On -Site Cost Cost .Funding 1001173 $ 104,839.01 $ - $ 13,959.18 $ 118,598.19 $ 100,000.00 $ $ $ $ ,s $ $ $ $ $ $ $ $ $ $ Total: $ 104,639.01 $ $ 13,959.18 $ 118,598.19 $ 100,000.00 Final Project Cost Summary Total Amount Earned: $ 104,639.01 Stored Materials: $ Total Due Contractor: $ 104,639.01 Total Engineering: $ 13,959.18 Total ProJect Cost: $ 118,598.19 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the ect amount of all work required to complete the above improvement. APPROVED: APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Drew Cook & Sons Exc. Inc. contractor for the above Improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for sald improvement. CONTRACTOR: Drew Cook & Sons Exc. Inc. BY:c= � j t TITLE: \( r C t t' —5 DATE: tfy `Y % l