Elm Street Parking Lot Project_Public HearingTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Elm Street Parking Lot DATE: July 29, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Parking Division Manager Tim Horsfield recommends City Council approval of the plans, specifications, form of contract and estimated cost of $567,068.76 for the Elm Street Parking Lot Project. I concur with the recommendation and respectfully request Mayor and City Council approval. 7.- Mic ael C. Van Milligen bc./114X tvii MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Tim Horsfield, Parking Division Manager THE CITY OF Dui Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Tim Horsfield, Parking Division Manager SUBJECT: Elm Street Parking Lot DATE: July 23, 2014 Dubuque bitetri All -America City 1 r 2007 • 2012 • 2013 INTRODUCTION The enclosed resolution is in reference to the public hearing for the construction of an 82 stall public parking lot within the Historic Millwork District. This parking lot will provide a portion of the parking included in the development agreement with Novelty Iron Works. DISCUSSION The Capital Improvement Budget includes $3,280,151 to begin the development of public parking within the Historic Millwork District. The parking will be constructed with concrete curb and gutter and asphalt pavement. The parking lot will have lighting that matches the street lighting used throughout the District and will be gate controlled. A Phase I and Phase II Environmental Site Assessments (ESA) were completed for the area, of the proposed parking lot, in May and June of this year. The Phase II ESA found two areas that show elevated levels of contaminants above the Statewide Standard for Contaminants in Soil. The environmental engineer provided the City with a map documenting the extent of the impacted soils and made recommendations for disposal of the impacted soils. The recommendation is to dispose of the impacted soils at a landfill that is able to accept the material. The Dubuque Metropolitan Area Solid Waste Agency (DMASWA) is capable of accepting this material. The estimated volume of impacted soils to be disposed at a landfill is approximately 1,600 tons. DMASWA quoted a price of $76.84 per ton for disposal. Engineering has estimated that an additional $6.25 per ton would be needed for trucking to this facility. The total fee per ton is estimated to be $83.09 per ton. DMASWA does provide a rebate to the City of $6.73 per ton after three months. This would reduce the fee to$76.36 per ton. The City is exploring other options for the disposal of the impacted soils, in an attempt to reduce project costs. The quantity of impacted soils may vary depending on what is or isn't found during construction. Excavation, along with additional soil sampling and testing, may find additional impacted soils or determine a lessor amount of impacted soils needing to be disposed of at a landfill. The current construction estimate is based on disposal of the impacted soil at the DMASWA facility until further testing can be completed during construction. RECOMMENDATION I recommend that the City Council approve the construction plans and specifications for the Elm Street Public Parking Lot Project. BUDGET IMPACT The estimate of probable cost for Elm Street Parking Lot Project is summarized as follows: Construction Cost Estimate Contingency (10%) Engineering & Inspection Parking Lot $448,275.70 44, 827.57 73.965.49 Total Estimate Project Cost $567,068.76 The project funding summary is as follows: CIP No. FY Fund Description 3602250 2014 Millwork District Parking Total Project Funding Fund Amount $3,280,150.77 $3,280,150.77 The Elm Street Parking Lot project will be funded through the Millwork District Parking capital improvement project appropriation in the amount of $567,068.76. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the EIm Street Parking Lot project. Prepared by Todd Irwin Cc: Jenny Larson, Budget Director Maurice Jones, Economic Development Director Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Todd Irwin, Engineering Technician 2 RESOLUTION NO. 234-14 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE ELM STREET PARKING LOT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Elm Street Parking Lot Project, in the estimated amount $567,068.76, are hereby approved. Passed, adopted and approved this 4th day of August, 2014. Attest: KevineS. irnstahl, C , City Clerk Roy D. Buol, Mayor W.30\14\14-260\14-2130 Ldwg. SR wx nm r+c .nal. 50 WE 0 50 FEET GRAPHIC SCALE IN FEET SITE PLAN PROPOSED SURFACE PARKING LOT EAST 11th STREET AND ELM STREET DUBUQUE IOWA 52001 04/15/14 FEHR Q " ENGINEERING & ENVIRONMENTAL C613.1 154-01:13123 IWNOIS IOWA WISCONSIN 2014 FEHR GRAHAM STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: July 25, 2014, and for which the charge is $57.13. Subscribed to before p e, a Notary Public in and for Dubuque County, Iowa, this cati day o Notary Public in and for Dub e County, Iowa. ARY K WE5TERMEYER Commission Number 154885 Mv Corun, w,,.,• ..:s;. • 1, 201' CITY OF DUBUQUE OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE ELM STREET PARKING LOT PROJECT NOTICE IS HEREBY GIVEN: The City Coun- cil of the City of,Dubu- que, Iowa will hold 'a public hearing on the proposed plans, speci- fications form of _con- 1 tract and estimated cost for the Elm Street Parking Lot Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 4th day. of August, 2014, in the Historic Federal. Building Council Cham bers (second °,floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, speci-. fications, form of con- tract and estimated cost are now on file in the office of the City Clerk. At said hearing• any interested person may appear and file objections thereto., The scope of the Proj- ect is as follows:, Construct an 82 stall, public parking lot with- in the Historic Millwork Dis nct. A6y visual or hearing- impaired • persons needing special assis- tance or persons with special accessibility needs should contact the City Clerk'soffice at (563): 589-4120 or TDD at .:(563) 556-9948 at least 48 hours prior to the meeting. Published by order of : the City Council given on the 21st day of July, 2014. Kevin S. Firnstahl, CMC, City Clerk It 7/25 'i NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT ELM STREET PARKING LOT PROJECT Time and Place for, Filing Sealed Propos- als Sealed bids for the • work comprising each improvement as stated below must be filed be- fore 2:00 p.m. on. the 7th day of August, 2014, in the Office of the City. Clerk, City Hall,l - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed ' Proposals Will be Opened and Considered. Sealed proposals':willbe opened and bids tabu- lated at 2:00 p.m. on 7th day of August, 2014, at City Hall -;Con- ference ' Room A, 50 West 13th' Street, Du- buque, Iowa, for con- sideration ±by the City Council (Council) at its meeting on 18th day of August, 2014. The, City of. Dubuque, Iowa, re- serves the right to re- ject any and all bids. Time for Com- niencement and Completion of Work. ,Work on each improve- ment shall be com- menced within 10 days after the Notice to Pro- ceed has been issued and shall be fully com- pleted by :1st day of October, 2014. Bid Security. Each bidder shall .,accompa- ny its bid, with a bid se- curity as -.security that the successful bidder will 'enter into a con- Jract for the work bid upon and will furnish after the award of con- tract a corporate sure- ty bond, acceptable to the governmenal enti- ty, for the faithful per- formance of the con- tract, in an amount equal to one hundred 'percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or cer tified check drawn on a state -chartered orfed- erally chartered bank, or a certified • share draft drawn on a state - chartered or federally ` chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satis- factory to the govern- mental entity. The bid bond shallcontain no conditions excepted as provided in this sec- tion. Contract• Docu- rents. Copies of the construction docu- ments may be obtained at the Engineering De- partment, City Hall - Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. N.o plate deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference willbe given to prod- ucts and provisions grown and coal pro duced within the'State of lowa, and'to' Iowa domestic labor, 'td the extent lawfully re- I quired under Iowa stat- utes. Sales Tax.,The bidder should not include sales tax in its bid. A sales tax ' exemption certificate will; be avail - r for all material purchased for incorpo- ration`in the project. General Nature of Public Improvement. Elm: Street parking Lot Project Construct an 82.stall public parking lot with- in the. Historic MillWork District Published in the Telegraph. Herald, t5 day of July, 2014. I ,