Loading...
Asphalt Paving Program Award 2007THE CITY OF DUB E ~-~-~ MEMORANDUM April 30, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2007 Asphalt Paving Project CIP 3001953 -Fiscal Year 2008 Street Construction Project Sealed bids were received for the 2007 Asphalt Paving Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Mathy Construction Co., in the amount of $734,864.53, which includes the base bid of $695,470.00 and Alternative 1 of $39,393.54. I concur with the recommendation and respectfully request Mayor and City Council approval. IG J V~ Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM ~- ~- ~ April 30, 2007 TO: Michael C. Van Milligen, City Manager I FROM: Gus Psihoyos, City Engineer SUBJECT: 2007 Asphalt Paving Project CIP 3001953 -Fiscal Year 2008 Street Construction Project INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the 2007 Asphalt Paving Project. BACKGROUND The 2007 Asphalt Paving Project includes the following street and park drive asphalt overlay improvements: 1. Main Street (From 1St Street to 4th Street) 2. Almond Street (From Ellis Street to Foye Street) 3. Ellis Street (From West Locust Street to Almond Street) 4. Flora Park Drive and Volleyball Court Parking 5. Murphy Park Drive and Parking Lot 6. Bunker Hill Golf Course Entrance Drive and Parking Lot 7. City Parking Lot 10 8. City Parking Lot 4 The 2007 Asphalt Paving Project will provide for resurfacing the above-mentioned streets, park drives, and parking lots. The Engineering Department has been coordinating with the Leisure Services Department and the Parking Division on the development of plans and scope of these projects: • The resurfacing of Main Street is being coordinated with the Historic Main Street Lighting and Sidewalk Replacement Project that the Engineering Department is currently managing. This work will be completed prior to the end of September, 2007. • The resurfacing of Parking Division Lot 10. This parking lot is located on the west side of Main Street between 5t" and 6t" Streets and is behind Ecumenical Towers. This provides for the milling and resurfacing of City Lot 10. This will also include re-striping the lot after the paving is complete. This work will be completed prior to the end of September, 2007. • The resurfacing of Parking Division Lot 4. This parking lot is located on the southwest corner of Bluff Street & 12t" Street. This parking lot was recently purchased by the City of Dubuque to provide additional parking for the Carnegie- Stout Library. This provides for the milling and resurfacing of the parking lot and includes re-striping the lot after the paving is complete. This work will be completed prior to the end of September, 2007. When the project was initiated, it included the resurfacing of the Dubuque Regional Airport Parking Lot adjacent to the University of Dubuque Air Service building. Due to additional work completed at the Dubuque Regional Airport as part of the 2006 Asphalt Paving Project, insufficient funds are available to include this portion in this year's program. Therefore, as part of the 2007 Asphalt Paving Project award, a change order will be developed to remove this portion from the project. The parking lot will be budgeted for FY 2009. The FY08 budget includes $41,000 for the Ellis Street Storm Sewer Project (CIP#7201913). It was programmed in FY08 to coincide with the re-surfacing of Ellis Street as part of the Street Program. The storm sewer project involves the extension of storm sewer on Ellis Street from W. Locust to Almond Street. Currently, there is no storm sewer on either Ellis Street or Almond Street. The construction of the sewer will prevent stormwater from ponding in the street to such a depth that it exceeds the curb height and flows onto private property. To gain favorable bid pricing and ensure project coordination, Alternate 1 -Almond & Ellis Streets Storm Sewer, was added as an addendum to the bid documents. BID RESULTS Sealed bids were received on the project on April 26, 2007. River City Paving, a Division of Mathy Construction Co. of Dubuque, Iowa, submitted the low base bid in the amount of $695,470.99. This amount is 2.37% under the engineer's estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name River City Paving, Division of Mathy Construction Co. Portzen Construction, Inc. Base Bid $695,470.99 Alternate 1 $39,393.54 Total Bid $734,864.53 $743,094.10 $61,406.00 Tschiggfrie Excavating, Inc. $807,010.25 $45,883.00 $804, 500.10 $852,893.25 RECOMMENDATION I recommend that the contract be awarded to River City Paving, A Division of Mathy Construction Co. in the amount of $734,864.53, which includes the base bid of $695,470.00 and Alternate 1 of $39,393.54. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the 2007 Asphalt Paving Project is summarized as follows: Cost Estimate Construction Contract (Base + Alternate1) $ 745,525.11 Contingency (10%) 74,552.51 Construction Engineering & Inspection (10%) 82,007.76 $ 902,085.38 The project funding summary is as follows: CIP No. Fund Description 3001953 FY 2008 Annual Street Program 7401405 Water Main Replacement Program 7201066 General Storm Sewer Repair Funds 7101638 Street Program Related Sanitary Sewer 1021764 Flora Park -Overlay Main Roadway 1021868 Flora Park -Overlay Volleyball Courts Parking Lot 3001366 Murphy Park -Asphalt Overlay Main Road 3501884 Bunker Hill -Overlay Main Road and Parking Lot 7301380 Parking Division -Maintenance of Municipal Parking Lots 3901698 Terminal Frontage Road Rehab 7201913 Alternate 1 -Almond & Ellis Street Storm Sewer Total Project Funding Rirl Aw~rrl $734,864.53 74,552.51 82, 007.76 $891,424.80 Fund Amount $340,429.94 9,571.73 2,057.36 60,180.91 47,500.00 45, 000.00 103,000.00 137,510.10 51,895.39 54,885.83 39, 393.54 $891,424.80 Due to funding levels, a change order will be prepared to remove this portion of the work from the project award. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the 2007 Asphalt Paving Project to River City Paving, A Division of Mathy Construction Co., in the amount of $734,864.53. Prepared by: Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Green, Water Plant Manager Gil Spence, Leisure Services Manager Todd Dalsing, Dubuque Regional Airport Tim Horsfield, Parking Division Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 248-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2007 ASPHALT PAVING PROGRAM Whereas, sealed proposals have been submitted by contractors for the 2007 Asphalt Paving Program (the Project) pursuant to Resolution No./ 3p9and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 6th day of April, 2007. Whereas, said sealed proposals were opened and read on the 26th day of April, 2007 and it has been determined that River City Paving, a Division of Mathy Construction Co. of Dubuque, Iowa, with a bid in the amount of $734,864.53, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to River City Paving, a Division of Mathy Construction Co. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 7th day of May , 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schnei er, CMC, City Clerk City of Dubuque -Engineering Division Bid TabuWtion Form REVISED PER ADDENDUM N0.2 DATE BID PROPOSAL FOR: 200]ASpAaB Pavbp Project ENGIN EER'S ES TMATE e100ER: Nvar 04ty R.vl ,hc. :roN m ca mfiuctbn. bc. MD OFR:THN Fxuran ed Main sheN, AingnE EhaN, ENis ElrseL Bunker Hill, MuryNy Park Fbra Park, Lot {, Lp110, Air port Parking Lot BID ITEM DESCRIPTION ME60TIMALaNTET ESTIMAETE ESi MATE ESOTUMATE AIES~TI STET DIVISION UNIT pUANTITY UNIT CO6T TOTAL CO6T UNR CO6T TOtAI COST UNR COST TOTAL COST UN IT COST TOTAL LOST NM4 RAVEMEMT 1 Gretletl 6tprc Bate 15.00 15.00 15.00 Ton 45.00 S 13.80 S 621.00 § 14.55 § 654.]5 S 20.00 S 900.00 S td 30 S 643.50 2 ExwvaEOn Uncbaaified 12.00 12.00 29.00 100.00 15.00 CV 16600 S 18.11 f 3.062.68 S 15.65 f 2628.20 f 13.00 S 2184.00 E 13.15 f 2209.20 3 HMA FWI DepM Repair Patches 36.00 60.00 13].00 65.00 49.00 ST 32d.DD t fi3.00 E 20,412.00 E 62.95 S 20395.60 S fi4.83 S 21,004.92 E 6935 S 22,43].00 6 HMA 300k Wetlfle a LAVekrq Courees,l2" (PG 6422) 3]9.00 82.00 132.00 659.00 266.00 129.00 Ton _ 162]. W S 50.62 f 82 033.34 E 50.25 5 81 ]56.]5 5 51.]5 f 86 19].25 S 55.30 S ~ 9]3.10 5 HMA 300k, 1, 12"(PG 64-22) 569.00 2dd.110 132.00 8]6.00 Ton 1923,00 t 5100 f 980]3.00 E 50.50 E 9],111.50 f 52.01 f 100015.23 S 55.55 S 106,822.65 6 HMA 300k, 6. 12"IPG 64221 325.00 264.00 2285.00 369.00 350.00 Ton 159300 E 5100 f 183,243.00 E 50.50 5 181646.50 5 5201 S 186,8]1.93 S 55.55 S 198,591.15 ] HIM 100k, 6, 12" (PG ]0-3a) 589.00 Ton 569.00 5 Sd.00 f 30,]26.00 E 56.50 S 31010.`A f %.14 S 31 943.66 f 59.95 E 31111.55 8 HMA HaM PNMirg 15.00 15.00 15.00 60.00 15.00 30.00 Ton 150.00 S 92.00 E 13,800.00 E 90.00 f 13500.00 f 92.]0 f 13,905.00 S 99.00 f 11,850.00 8 HMA SUrbcbp of piveway aM PalcMa 15.00 15.00 15.00 30.00 Ton ]5.00 S 9200 f 6.900.00 f 90.00 S 6]50.00 f 92.]0 S 6952.50 S 9900 5 ]625.00 10 PCL LreckE6eat %19.00 SY %19.00 S 100 f 5,619.00 E 1.]5 S 9833.25 E 1.60 f 10,114.20 E 195 S 1095].05 11 HAU Pavement SrarMcitbn-FW 5¢e 2]84.00 2394.00 2630.00 312.00 450.00 SV 8560.00 t 255 E 21,828.00 f 198 S 16,092.110 f 2.10 S 1],9]600 S 2.05 S 1],548.00 12 HIM Pavemem SCarifintion-Mini s¢ 233.00 SV 23].00 5 ].35 S 1,]12.55 § 9.98 S 2315.34 f 103] S 2392.91 S 11.00 S 2563.00 13 HMA Sawcut 120.00 168.00 225.00 15.00 LF 58600 S 1.20 f 1,293.fi0 E 1.50 S 882.00 S 21T E 1,331.]6 f 210 S 161130 it HMA Lurk 100.00 LF 100.00 S ].00 S ]00.00 § 6.00 E 600.00 E 6.18 S fi18.00 f e60 S 660.00 15 Petm Mal dA6.W SY 44400 t 1.50 f 666.00 E 6.50 S 2886.00 f 6.18 f 2]43.92 S 6.fi0 S 2930.411 16 Cbankg aM PreParatbn of Bau 5619.00 2]&1.00 2394.00 2]660.00 d4fifi.W %03.00 SY 1fi846.W E 1.05 S 69,166.30 f 0.95 S 44,503.]0 S 1.00 § 16.846.00 S 105 S 49,188.30 1] AdjuMxm of Fixlum ManNOk ].00 1.00 6.00 5.00 1.00 Each 11.00 E 368.00 f ],]28.00 § 38.5.00 S 8085.00 f 36030 S ]5]0.50 5 38500 S 6085.00 18 Adjuspnem of FMUm Water VaNS/MPMOr va4 3.00 3.00 1.00 1.00 200 Each 10.00 f 32600 f 3,2W.00 S 310.00 S 3,400.00 f J31.]5 f 3,3/].50 S 358.00 S 1580.00 19 Atljustrrcm of Fixtures GlM Basin TOP 3.00 4.00 2.00 Each 9.00 S 60000 f 5600.00 S 550.00 S 49°A.00 S 900.00 E 8100.00 S 440.00 f 3,960.00 PC CONCRETE PAVBENT 30 PC Cprcrele Pavemert 6csrificatipn 6090.00 SY fi090.00 S 6.00 E 3fi,540.00 S 1.22 S 25899.80 f 4.43 E 269]8.]0 S 4.65 S 26 318.50 21 Remove aM Repbument al PC Concrete Lur6 d Gulley 15(1.00 225.00 LF 3]5.00 S 18.00 E 6,]50.00 t 20.]5 t T ]81.25 f 15.75 f 5,906.25 S 20.85 f ] 818.]5 22 PC Concrete CuM Ramp, fi 1 44.00 SF 14400 E 10.00 E 1,440.00 S 6.46 t 930.21 f 4.13 E 661 11 S 1].65 f 23]0.40 23 PC Corcrtte Curb Rang, Debaabk Wambp 3.00 EacM1 3.00 S 366.00 § ]96.00 S 168.00 f 504.00 f 183.]5 5 55125 S 226.00 S fi]8.00 2d PC Concrete Dmeway, 6', Remove arai Cpnstmct 16.00 1.00 SV 20.00 S 4].00 f 910.00 S 51.30 f 1028.00 S 42.52 S 85060 S 5].10 S 1,1M.00 25 PC COncMe SkswaM, d', Remove aM COnMmct S4p.00 SF 54000 S 6.50 f 2430.00 S 1.T8 S 2581.20 S 3.61 f 1981.80 f 5.70 S 30]8.00 26 PC Concrete FW Depth Repair Patches 100.00 SV 10000 E 62.]4 S 6,216.00 S 00.95 S 6,095.00 S 4].25 E 1,J25.00 E 85.10 f 6,510.00 2] PLC SawcLL 25.00 _ LF 25.00 f 3.63 S 90.]5 E 3.00 f ]5.00 f 4.20 § 105.00 f 6.35 S 106.]5 28 PC Concrete FJI DepM Saw 2561.00 LF 2581.00 f 6.00 S 10,326.00 E 2.50 S fi 452.50 S 3.15 E 6 130.15 S 6.55 S 1fi 905.55 29 PC Concrete Wal 85.00 LF 85.00 S 35.00 f 2,915.00 f 58.60 S 1,981.00 S ]e.]5 E b,fi93.]5 S 210.00 S 11850.00 ]0 PCL Lurd Sewcul 20.00 LF 20.00 E 15.00 5 300.00 E 3.00 f 80.00 § 4.20 E 84.00 6.55 S 131.00 Cky of Dubuque -Engineering Division Bid Tabulation Form REVISED PER ADDENDUM NO. 2 GATE: ENGINEER'S ES TIMATE (peoER: Rler clry hM .bc. elWEll:rokan t-o &D PROPOSAL FOR: 206]A ph NP bNP ject Main aNeet AtmoM Street, Elvis Streel Bunker Hill MuryhY Park Fbra Park Lot! let 10, Al rpoN Partln9 Lot BID ITEM DESCRIPTION ME UANTET l ESTRMA E ESTIMATE EOUAN?E ME DUAN?ET mV~~ UNIT OUANTITV UNIT CO6T TOTAL CO6T UNIT COST tOTALCQST UNfi COST TOTALCQST UNR CO6T TO TAL CAST SAgTARy SEWER 1 8 00 5V 396.00 S 63.00 E .. 2d 822.00 f 46.30 S 19 030.20 5 100.00 S 39,400.00 E 6935 E 2] 264.50 31 HMl1 FJI Deem Repa'r PatMes Menhde 0.epboemerR 1000 32 Manhob Rin98COVar-Neenah R-1fid2A ].00 . 256.00 2 4.tp 4.00 5.00 1.00 EA 2100 S 45100 f 9.6]1.00 E 3]5.00 S ],8]5.00 E 30000 S 6300.110 E 3]5.00 S ],6]5.00 ALMOND 33 SeMaN Seer Manhole Remove aM Reconstruct Campkb-MH M1 1.00 LS 1.00 E 6,300.00 S 4,300.00 E 3821.W S 3,92163 E 4,50000 S 4,500.00 S 2,500.00 E 2,500.00 34 SaMary Sever Manhole Remove antl Remrrtruct Compkh - MN A-2 1.00 LS 1.00 S 6,300.00 S d 300.00 f 3,6]1.63 E 3,6]1.63 S 4,500.00 S !500.00 S 2,500.00 E 2,500.00 ~ 6 Marv Se ManhoN Remme and RawmW 1 Complete - MN A-3 100 LS 1.00 E 4.300.00 S 4,300.00 E 3 ]91.W E 3 ]9163 S 4500.00 S 4,500.00 S 2350.00 f 2 350.00 36 6anihry Sever Manhole Remove and Recprelria;t Compete-MH Ad 1.00 LS 1.00 f 4.300.00 E 1,300.00 S 3.6]163 S 3,fi]163 S 4,500.00 S 4,500.00 f 2,500.00 f 2,500.00 EWS 3] S rrla Sever Manhole Remove and R<wmtrud Complete - MH E-1 1.00 LS 1.00 E 6,300.00 S x,300.00 S 3 ]39.20 E 3 ]3930 S d 500.00 E 4,500.00 S 2500.00 f 2500.00 36 San6ary Sever Manhole Remove aM Recomhucl Compote-MME-2 1.00 lS 160 S 4,80000 E 4,BOO.eD f 4,135.3] E 4,1353] f !50000 S 4,500.00 S 3250.00 f 3250.00 S3oRU aLaNEIE 39 swnn wRera oxnma Neee+nc ..; ~ s.oD s.DD Each 10.00 E 222.00 S 2.2z0.ao E 1]o.a3 E 1~oD.3o S 12s.aD s t2so oD s zoo.o6 f 2000.00 WATER REPEACEIFJ[T ~ Wrter VaNa Box (ftree0 Rephn Upper SeceiOr~s and LHa 3.00 3.00 1.00 1.00 Each B.OD E 110.25 S 662.00 f 141.51 E 1 132.08 - E 155.00 S 1460.00 E 130.00 S t Od0.00 41 fi dP Cbu 52 WlPOlyvrap 25.00 tO.OD LF 35.00 E 40.25 f 1,606.]5 E 26.86 E 1,010.60 S 4500 S 15]5.00 S 55.00 S 1,925.00 a2 6" Mega wv 2.00 Each 2.00 E 60.00 S 120.00 E 65.60 S 91.20 S 60.00 S 120.00 E 105.00 f 210.00 636^441 cppd~ 2.00 2.06 EecM1 4.60 E 250.00 E 1060.00 S 180.3fi S ]21 d4 E 1]500 E ]00.00 S 210.00 E 640.00 44 6xfixfi MOhor Tee 1.00 Each 1.00 E 450.00 f 450.00 E 205.85 E 20595 S 251.00 E 251.60 f JSO.eD E 350.00 d5 Hyaant 1.00 Each 1.00 E 2,000.00 E 2,000.00 S 2,152.32 E 2,152.32 S 2000.00 S 2000.00 S 2 .W S 220D.00 6fi 6- Valve M.pW Box .. _ .._ .. .. 2.00 100 on m x m EecM1 Tm 3.00 E 8`A.00 55.00 E 6.00 S S 2,550.00 4/0.00 S ~2.9t S E 11.60. E t 958.]3 638.00 S ]OO.OD S E 8.00 S 2 100.00 440.00 S ]W.00 S ].50 S E 2,100.00 612.50 City of Dubuque-Engineering Division BiE Tabulation Form REVISED PER ADDENDUM NO. 2 DarE ENGINEER'S ES TMATE &OOER: Rivnr c4rY PaN .ka. GOER: Perrr n COmmrcOm, kc. d0pEll: Tc &D PROPOSAL FOR: 2001A haNP gP je Main aheN AYnontl Street ct ENis Stree[ Bunker HIII Murphy Park Fbra Park. Lot 4, La110, Ai rport Parking Lot BID ITEM DESCRIPTION M SDUAN~T ESTIMATE EST ATE EQ gry?E AIESOTIMANTET ~~VRISRION UNR OUAtIJOTITY UNIT COST TOTAL COST UNIT COST TOTAL COST UNR COST TOTAL COST UNn COST TOTAL COST flnGElJ:/iI~WS ~ Gnder Sha - 58300 _ SY 563.00 S 3.06 3 1 ]%.60 3 3.00 S 1 )49.OD S 10.00 E 5,830.00 S 5.50 S 32%.`A 49 Remove Cpncrck Bogcrtls Complete _ 100 LS 1.00 5 800.00 S 800.00 f )(10.00 S ]OO.OD 5 200 00 S 200.00 E 2,]50.00 S 2 ]50.00 ~ Remove antl InahN Bobrda Gompkte 1.00 L8 1.00 S 1500.00 S 1500.00 S 3,200.00 E 3 200.00 S 500.00 S 500.00 f 2 ]50.00 E 2 ]50.00 51 Remove 6 Reinaml EakNng Prccaat Parking Bum pers %.00 Each %00 S 50.00 f 6,80000 E t? 00 E 1,63] 00 3 10.00 3 960.00 E 110.00 S 10,560.00 ~ Ba<MS TOpwil 84.00 )500 SY 159.00 S 5.04 S 801.36 5 6.85 S 711.15 S 6.00 E 6%.00 E 8.55 S 1159.45 53 6otl 84.00 )5.00 SY 159.00 5 15.75 5 2504.25 f 4.15 S 659.% S ].00 S 1113.00 f 1].75 5 2188.25 `~ Waknn9 2.60 250 MGAL 5.10 E 600.00 S 3,OW.00 E 550.00 E 2805.00 E 50.00 S 255.00 S 110.00 5 561.00 % Pavemer4lAarldr9 8500.00 168000 LF 10180.00 E 0.85 E 8653.00 E 0.26 E 2666.80 f 0.]5 f 7835.00 S 0.45 S 4581.00 56 Fkyger 10.00 SOD 500 10.00 3.00 6.00 DeY l].OO E 315.00 f 11,655.00 f 265.00 5 9,805.00 S 2)820 S 10,293.40 f 300.00 f 11100.00 57 Tni6c arM Sakry CoMrd 58 LS 1.00 E 1.00 LS 1.00 E 1.00 S E 1.00 1.00 f 16,600.00 E S 14,5%.00 S 16800.00 1455fi.00 510,000.00 S )350.00 E 20,000.00 3 7.350.00 516,D60.00 f24,OW.00 f S 16,060.00 2d 000.00 Nobi¢atbn 0 f 807 010 25 BASE BW TOTAL: f T12,NS.02 t t%,4]0.% f 7N,0%.1 , . (BN hems rva.1 to SB ToWI UrMer/OVer EnBmeefa Estimate -2.63% 6.61% ].92% PROJECT BID ALTERNATE 1-AY11oM ernd ENk St1aaN Sbrm Sa+wr 59 ppake 10141 1 Each 4.00 S 1900.00 S ).60000 S 1.866.68 5 7,666.12 51900.00 5 ?600.00 E 1,400.00 f 5,600.00 60 IrNke 101-8 Remove Each 1.00 E 600.00 S 800.00 E 3]500 f 3]5.00 S 400.00 E 400.00 f 650.00 f 650.00 fit Manhole 48'Oismeter COmpkh 1 lS 6.00 S 2,500.00 S 10000.00 f t,028.3T S 6,113.48 f 4.500.00 E 18,000.00 S 1,600.00 E 6,600.00 fit Stprm Sever, 15" RCP, CL III 20 LF 51 00 E 33.00 E 1683.00 S 30 % S 1.023.% 5 15.00 S 1 ]85.00 f 38.00 S 1,938.00 69 Stam 5<eer 2d' RCP CL III 49 555 LF 614.00 5 40.00 E 2d 560.00 S 3t 37 E 19,261.16 3 42.00 S 25 ]88.00 E d0.0O E 36 560.00 668ackM, Limestone 50 _ Ten 620.00 E 8.00 5 3.408.00 E 11.60 S 6,961 fi0 S 8.00 S 3,608.00 S 7.50 E 3,1%.00 65HA Saecut 155 LF 14)5.00 E 2.20 E 3,20.5.00 3 1.50 S 2,212.50 S 3.00 S 4,625.00 S 2.40 E 3540.00 ALTERNATE ND. 1 TOTAL: f 51,0%.00 S 39,399.54 S 61,b6.g0 f 43.883.00 UMer/OVer Enpineefs ES[imak -29.]1% 20.18% -1030% TOTAL CONSTRUCTN)N ESTIMATE: f 763.0.19.02 S T36,864.A S 904,300.10 f 952.995.25 UMer/Wer Enplneeh Estimate -3.99% 5.33% 11.]2%