Loading...
Downtown Streetlight_Signalization Pole PaintingTHE CITY OF DUB E ~.~~ MEMORANDUM April 28, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project CIP 2501917: Painting Program for City-Owned Streetlights and Traffic Signals CIP 1021608: Downtown Streetlight Replacement Schedule Sealed bids were received for the Downtown Streetlight & Traffic Signalization Pole Painting Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Alan Jackson Tuckpointing, Inc., in the amount of $46,571, which is 20.03% under the engineer's estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. ~' Mi hael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM ~-~-~ April 27, 2007 TO: Michael C. Van Milligen, City Manag FROM: Gus Psihoyos, City Engineer SUBJECT: Downtown Streetlight & Traffic Signalization Pole Painting Project CIP 2501917: Painting Program for City-Owned Streetlights and Traffic Signals CIP 1021608: Downtown Streetlight Replacement Schedule INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Downtown Streetlight & Traffic Signalization Pole Painting Project. DISCUSSION The Downtown Streetlight and Traffic Signalization Pole Painting Project will consist of painting approximately 180 streetlights and traffic signal poles in the downtown area of Bluff Street to White Street, from 1St Street to 17th Street. The painting will be a three-step process: sanding; application of primer coat; and application of a finish coat of paint. If, during the process, it is determined that the pole is in poor condition, it will be replaced with available inventory. If the inventory becomes depleted or the pole type is not available, the pole will be painted and the necessary replacement will be included in a future capital improvement project. BID RESULTS Sealed bids were received on the project on April 26, 2007. Alan Jackson Tuckpointing, Inc. of Bellevue, Iowa, submitted the low bid in the amount of $46,571.00. This amount is 20.03% under the engineer's estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid Alan Jackson Tuckpointing, Inc. $46,571.00 Joe McMahon $73,105.00 A third bid was received during the letting; the painting contractor modified the bid tab by including an additional bid item. This is not acceptable; and therefore, the third bid was rejected according to the City of Dubuque specifications. RECOMMENDATION I recommend that the contract be awarded to Alan Jackson Tuckpointing, Inc. in the amount of $46,571.00. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the Downtown Streetlight and Traffic Signalization Pole Painting Project is summarized as follows: Cost Estimate Bid Award Construction Contract $58,236.00 $46,571.00 Contingency 5,823.60 5,823.60 Construction Engineering & Inspection 9,608.94 9,608.94 $73,668.54 $62,003.54 The funding summary is as follows: CIP No. Fund Description Fund Amount 2501917 Painting Program for City-Owned Streetlights and Traffic $31,250.00 Signals 1021608 Downtown Streetlight Replacement Schedule 30,753.54 Total Project Funding $62,003.54 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Downtown Streetlight and Traffic Signalization Pole Painting Project to Alan Jackson Tuckpointing, Inc. in the amount of $46,571.00. Prepared by David Ness, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Public Works Bob Schiesl, Assistant City Engineer RESOLUTION NO. 249-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE DOWNTOWN STREETLIGHT 8~ TRAFFIC SIGNALIZATION POLE PAINTING PROJECT Whereas, sealed proposals have been submitted by contractors for the Downtown Streetlight & Traffic Signalization Pole Painting Project (the Project) pursuant to Resolution No./ G-d and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 6th day of April, 2007. Whereas, said sealed proposals were opened and read on the 26th day of April, 2007, and it has been determined that Alan Jackson Tuckpointing, Inc. of Bellevue, Iowa, with a bid in the amount of $46,571.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Alan Jackson Tuckpointing, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 7th day of May , 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Bid Proposal Form CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEE" DATE: April 27, 2007 BID TABULATION FOR: DOWNTOWN STREETLIGHT AND TRAFFIC SIGNALIZATION POLE PAINTING PROJECT Photo ITEM ENGINEERING ESTIMATE REF #'s LOCATION UNIT G~TY. UNIT COST TOTAL COST 10TH 8:=BLtl~'F 4 CONTROL CABINETS 2 20' MASTARM POLE 1,3 PEDESTAL SIGNAL 6,7,8 LARGE OVERHEAD MAST w/ 2 POLES 5 PEDESTRIAN HEAD w/BRACKETS TRAFFIC SIGNAL HEAD w/BRACKETS TOTAL COST PER INTERSECTION 9TH B:~BL.UFF 13 30' LIGHT POLE 11 CONTROL CABINETS 12,14 20' MASTARM POLE 10 30' COMBINATION POLE 9 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w! BRACKETS TOTAL COST PER INTERSECTION 8TH & BLUFF 15,19 30' LIGHT POLE 18 CONTROL CABINETS 16,17,18 PEDESTAL SIGNAL PEDESTRIAN HEAD w/BRACKETS TRAFFIC SIGNAL HEAD w/BRACKETS TOTAL COST PER INTERSECTION 5TH 8, BLUFF 24 CONTROL CABINETS 20-25 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION 2ND & BLUFF 26 CONTROL CABINETS 26 20' MASTARM POLE 27 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION EACH 1 $56.00 EACH 1 $404.00 EACH 3 $103.00 EACH 1 $808.00 EACH 3 $10.00 EACH 6 $19.00 EACH 1 $353.00 EACH 1 $56.00 EACH 2 $404.00 EACH 1 $520.00 EACH 1 $103.00 EACH 8 $10.00 EACH 8 $19.00 EACH 2 $353.00 EACH 1 $56.00 EACH 3 $103.00 EACH 8 $10.00 EACH 6 $19.00 EACH 1 $56.00 EACH 6 $103.00 EACH 8 $10.00 EACH 6 $19.00 EACH 1 $56.00 EACH 1 $404.00 EACH 1 $103.00 EACH 2 $10.00 EACH 4 $19.00 Alan Jackson Tuckpointing Joe McMahon UNIT COST TOTAL COST UNIT COST TOTAL COST $70.00 $70.00 $zlo.oo $zio.oo $439.00 $439.00 $285.00 $285.00 $63.00 $189.00 $195.00 $585.00 $1,757.00 $1,757.00 $1,420.00 $1,420.00 $29.00 $87.00 $55.00 $165.00 $37.00 $222.00 $60.00 $360.00 $2,764.00 $3,025.00 $121.00 $121.00 $350.00 $350.00 $70.00 $70.00 $210.00 $210.00 $439.00 $878.00 $285.00 $570.00 $608.00 $608.00 $350.00 $350.00 $63.00 $63.00 $195.00 $195.00 $29.00 $232.00 $55.00 $440.00 $37.00 $296.00 $60.00 $480.00 $2,268.00 $2,595.00 $121.00 $242.00 $275.00 $550.00 $70.00 $70.00 $210.00 $210.00 $63.00 $189.00 $195.00 $585.00 $29.00 $232.00 $55.00 $440.00 $37.00 $222.00 $60.00 $360.00 5955.00 $2,145.00 $70.00 $70.00 $210.00 $210.00 $63.00 $378.00 $195.00 $1,170.00 $29.00 $232.00 $55.00 $440.00 $37.00 $222.00 $60.00 $360.00 $902.00 $2,180.00 $70.00 $70.00 $210.00 $210.00 $439.00 $439.00 $285.00 $285.00 $63.00 $63.00 $195.00 $195.00 $29.00 $58.00 $55.00 $110.00 $37.00 $148.00 $60.00 $240.00 $778.00 $1,040.00 K:\PROJECTS\Downtown Signal 8 Light Painting 20071Council 8 Statf Documentation\Award\Downtown Pole Painting Bid Tab to Council Page 1 of 7 Photo ITEM REF #'s LOCATION UNIT ~ TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST 4TH & LOCUST 28,31,32 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 28,29 PEDESTAL SIGNAL EACH 3 $103.00 $309.00 $63.00 $189.00 $195.00 $585.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $19.00 $76.00 $37.00 $148.00 $60.00 $240.00 TOTAL COST PER INTERSECTION $1,524.00 $932.00 $2,090.00 5TH & LOCUST > ' :; .; 33,36,37 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 35 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 34,35 PEDESTAL SIGNAL EACH 2 $103.00 $206.00 $63.00 $126.00 $195.00 $390.00 PEDESTRIAN HEAD w! BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $19.00 $95.00 $37.00 $185.00 $60.00 $300.00 TOTAL COST PER INTERSECTION $1,496.00 $976.00 $2,165.00 7TH 8 LOCUST " "" 38,39 30' LIGHT POLE EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 TOTAL COST PER INTERSECTION $706.00 $242.00 $550.00 8TH 8~ LOCUST 40,42 30' LIGHT POLE EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 41 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 43 PEDESTAL SIGNAL EACH 1 $103.00 $103.00 $63.00 $63.00 $195.00 $195.00 PEDESTRIAN HEAD w/ BRACKETS EACH 2 $10.00 $20.00 $29.00 $58.00 $55.00 $110.00 TRAFFIC SIGNAL HEAD w! BRACKETS EACH 2 $19.00 $38.00 $37.00 $74.00 $60.00 $120.00 TOTAL COST PER INTERSECTION $923.00 $507.00 $1,185.00 =9TH 8 LOCUST ; . - ,.., 44,45,47 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 48 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 46,48 PEDESTAL SIGNAL EACH 2 $103.00 $206.00 $63.00 $126.00 $195.00 $390.00 PEDESTRIAN HEAD w/ BRACKETS EACH 6 $10.00 $60.00 $29.00 $174.00 $55.00 $330.00 TRAFFIC SIGNAL HEAD wl BRACKETS EACH 3 $19.00 $57.00 $37.00 $111.00 $60.00 $180.00 TOTAL COST PER INTERSECTION $1,438.00 $844.00 $1,935.00 ZQTH &iOCUST < < ;: 51 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 49-52 PEDESTAL SIGNAL EACH 5 $103.00 $515.00 $63.00 $315.00 $195.00 $975.00 56 LARGE OVERHEAD MAST w/ 2 POLES EACH 1 $808.00 $808.00 $1,757.00 $1,757.00 $1,420.00 $1,420.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/BRACKETS EACH 4 $19.00 $76.00 $37.00 $148.00 $60.00 $240.00 TOTAL COST PER INTERSECTION $1,535.00 $2,522.00 $3,285.00 12TH $ LOCUST - 55 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 53-55 PEDESTAL SIGNAL EACH 3 $103.00 $309.00 $63.00 $189.00 $195.00 $585.00 PEDESTRIAN HEAD w/BRACKETS EACH 4 $10.00 $40.00 $29.00 $116.00 $55.00 $220.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 3 $19.00 $57.00 $37.00 $111.00 $60.00 $180.00 TOTAL COST PER INTERSECTION $462.00 $486.00 $1,195.00 K:\PROJECTS\Downtown Signal & Light Painting 2007\Council 8 Stag DocumentationWward\Downlown Pole Painting Bid Tab to Council Page 2 of 7 Photo REF #'s LOCATION 12TH 8 MAIN 57,58 30' LIGHT POLE 60 CONTROL CABINETS 59,60 PEDESTAL SIGNAL PEDESTRIAN HEAD w! BRACKETS TRAFFIC SIGNAL HEAD w/BRACKETS TOTAL COST PER INTERSECTION 11TH & MAIN 61,62 30' LIGHT POLE TOTAL COST PER INTERSECTION 10TH 8 MAIN 63,64 30' LIGHT POLE 67 CONTROL CABINETS 65-67 PEDESTAL SIGNAL PEDESTRIAN HEAD w! BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION 9TH &-MAIN 68-71 30' LIGHT POLE TOTAL COST PER INTERSECTION Slli 8 MAIN 72 30' LIGHT POLE TOTAL COST PER INTERSECTION 4T7#~'MAIN 78 30' LIGHT POLE TOTAL COST PER INTERSECTION ,~jD 8 MAIN 73 30' LIGHT POLE TOTAL COST PER INTERSECTION 2ND & MAIN 74,75 30' LIGHT POLE TOTAL COST PER INTERSECTION 1ST 8 MAIN 76,77 30' LIGHT POLE TOTAL COST PER INTERSECTION 4TH 81OWA' 79-81 30' LIGHT POLE TOTAL COST PER INTERSECTION ITEM UNIT (QTY. TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 EACH 2 $103.00 $206.00 $63.00 $126.00 $195.00 $390.00 EACH 6 $10.00 $60.00 $29.00 $174.00 $55.00 $330.00 EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 $1,142.00 $834.00 $1,840.00 EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 $706.00 $242.00 $550.00 EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 EACH 3 $103.00 $309.00 $63.00 $189.00 $195.00 $585.00 EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 $1,265.00 $955.00 $2,145.00 EACH 4 $353.00 $1,412.00 $121.00 $484.00 $275.00 $1,100.00 $1,412.00 $484.00 $1,100.00 EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 $706.00 $242.00 $550.00 EACH 1 $353.00 $353.00 $121.00 $121.00 $275.00 $275.00 $353.00 $121.00 $275.00 - _, EACH 1 $353.00 $353.00 $121.00 .. $121.00 $275.00 , $275.00 $353.00 $121.00 $275.00 EAGH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 EACH 2 $353.00 EACH 3 $353.00 K:\PROJECTS1Downtown Signal 8 Light Painting 2007\Council 8 Staff Do< Page 3 of 7 $706.00 $242.00 $550.00 $706.00 $121.00 $242.00 $275.00 $550.00 $706.00 $242.00 $550.00 $1,059.00 $121.00 $363.00 $275.00 $825.00. $1,059.00 Pole Painting Bid Tab to Council $363.00 $825.00 Photo ITEM REF #'s LOCATION UNIT (QTY. TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST STH St10WA 85-87 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 82,84 30' COMBINATION POLE EACH 2 $520.00 $1,040.00 $608.00 $1,216.00 $350.00 $700.00 83 PEDESTAL SIGNAL EACH 1 $103.00 $103.00 $63.00 $63.00 $195.00 $195.00 PEDESTRIAN HEAD w/ BRACKETS EACH 4 $10.00 $40.00 $29.00 $116.00 $55.00 $220.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $19.00 $95.00 $37.00 $185.00 $60.00 $300.00 TOTAL COST PER INTERSECTION $2,337.00 $1,943.00 $2,240.00 6TH &-IOWA 88-92 30' LIGHT POLE EACH 5 $353.00 $1,765.00 $121.00 $605.00 $275.00 $1,375.00 TOTAL COST PER INTERSECTION $1,765.00 E605.00 $1,375.00 7TH & IOWA 94,100,101 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 97 30' COMBINATION POLE EACH 1 $520.00 $520.00 $608.00 $608.00 $350.00 $350.00 93,95,96,98,99 PEDESTAL SIGNAL EACH 5 $103.00 $515.00 $63.00 $315.00 $195.00 $975.00 PEDESTRIAN HEAD w/ BRACKETS EACH 10 $10.00 $100.00 $29.00 $290.00 $55.00 $550.00 TRAFFIC SIGNAL HEAD w! BRACKETS EACH 9 $19.00 $171.00 $37.00 $333.00 $60.00 $540.00 TOTAL COST PER INTERSECTION $2,365.00 $1,909.00 $3,240.00 8TH 8'~QWA . . 102-105 30' LIGHT POLE EACH 4 $353.00 $1,412.00 $121.00 $484.00 $275.00 $1,100.00 TOTAL COST PER INTERSECTION $1,412.00 $484.00 $1,100.00 9TH &IOWA ' 106,108,111,112 30' LIGHT POLE EACH 4 $353.00 $1,412.00 $121.00 $484.00 $275.00 $1,100.00 108 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 117 20' MASTARM POLE EACH 1 $404.00 $404.00 $439.00 $439.00 $285.00 $285.00 107,109 30' COMBINATION POLE EACH 2 $520.00 $1,040.00 $608.00 $1,216.00 $350.00 $700.00 108,110 PEDESTAL SIGNAL EACH 2 $103.00 $206.00 $63.00 $126.00 $195.00 $390.00 PEDESTRIAN HEAD w/ BRACKETS EACH 10 $10.00 $100.00 $29.00 $290.00 $55.00 $550.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 TOTAL COST PER INTERSECTION $3,332.00 $2,847.00 $3,595.00 10TH 8C IOWA 120 30' LIGHT POLE EACN 1 $353.00 $353.00 $121.00 $121.00 $275.00 $275.00 116 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 114 20' MASTARM POLE EACH 1 $404.00 $404.00 $439.00 $439.00 $285.00 $285.00 121 30' COMBINATION POLE EACH 1 $520.00 $520.00 $608.00 $608.00 $350.00 $350.00 113.115,118,119 PEDESTAL SIGNAL EACH 4 $103.00 $412.00 $63.00 $252.00 $195.00 $780.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 TOTAL COST PER INTERSECTION $1,939.00 $1,944.00 $2,700.00 11TH $ IOWA 122,123 30' LIGHT POLE EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 TOTAL COST PER INTERSECTION $706.00 $242.00 $550.00 K:\PROJECTS\Downtown Signal 8 Light Painting 2007\Council & Staff DowmentationlAward\Downtown Pole Painting Bid Tab to Council Page 4 017 Photo REF #'s LOCATION 12TH & IOWA 126,128 30' LIGHT POLE 124,125,127 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION 13TH 8 IOWA 129,130 30' LIGHT POLE TOTAL COST PER INTERSECTION .17TH 8 CENTRAL 132 CONTROL CABINETS 134 20' MASTARM POLE 133 30' COMBINATION POLE 132,135 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION 16TH 8~ CENTRAL 136-138 30' LIGHT POLE TOTAL COST PER INTERSECTION 15TH 8~ CENTRAL 141,143 30' LIGHT POLE 140 CONTROL CABINETS 139,140,142 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/ BRACKETS TOTAL COST PER INTERSECTION ' 145'H 8 CENTRAL 145 30' LIGHT POLE 150 20' MASTARM POLE 152 20' MASTARM w/ 2 POLES 151 30' COMBINATION POLE 144 PEDESTAL SIGNAL PEDESTRIAN HEAD w/ BRACKETS TRAFFIC SIGNAL HEAD w/BRACKETS TOTAL COST PER INTERSECTION iiiFi ~ CENTRAL 146 30' LIGHT POLE TOTAL COST PER INTERSECTION 1QTH 8~ CENTRAL 147,148 30' LIGHT POLE TOTAL COST PER INTERSECTION ITEM UNIT ~ TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 EACH 3 $103.00 $309.00 $63.00 $189.00 $195.00 $585.00 EACH 6 $10.00 $60.00 $29.00 $174.00 $55.00 $330.00 EACH 5 $19.00 $95.00 $37.00 $185.00 $60.00 $300.00 $1,170.00 $790.00 $1,765.00 EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 $706.00 $242.00 $550.00 EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 EACH 1 $404.00 $404.00 $439.00 $439.00 $285.00 $285.00 EACH 1 $520.00 $520.00 $608.00 $608.00 $350.00 $350.00 EACH 3 $103.00 $309.00 $63.00 $189.00 $195.00 $585.00 EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 $1,483.00 $1,760.00 $2,230.00 EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 $1,059.00 $363.00 $825.00 EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 EACH 5 $103.00 $515.00 $63.00 $315.00 $195.00 $975.00 EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 $1,471.00 $1,081.00 $2,535.00 EACH 1 $353.00 $353.00 $121.00 $121.00 $275.00 $275.00 EACH 1 $404.00 $404.00 $439.00 $439.00 $285.00 $285.00 EACH 1 $509.00 $509.00 $762.00 $762.00 $550.00 $550.00 EACH 1 $520.00 $520.00 $608.00 $608.00 $350.00 $350.00 EACH 1 $103.00 $103.00 $63.00 $63.00 $195.00 $195.00 EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 EACH 7 $19.00 $133.00 $37.00 $259.00 $60.00 $420.00 $2,102.00 $2,484.00 $2,515.00 EACH 1 $353.00 $353.00 $121.00 $121.00 $275.00 $275.00 $353.00 $121.00 $275.00 EACH 2 $353.00 K.IPROJECTS1Downlown Signal 8 Light Painting 2007\Ccuncil & Staff Doi Page 5 of 7 $121.00 Pole Painting Bitl Tab to Council $242.00 $275.00 $550.00 $242.00 $550.00 Photo ITEM REF #'s LOCATION UNIT (~,TY. TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST 9TH 8 CENTRAL _ 149 30' LIGHT POLE EACH 1 $353.00 $353.00 $121.00 $121.00 $275.00 $275.00 149 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 158 20' MASTARM POLE EACH 1 $404.00 $404.00 $439.00 $439.00 $285.00 $285.00 154 20' MASTARM w/ 2 POLES EACH 1 $509.00 $509.00 $762.00 $762.00 $550.00 $550.00 153 30' COMBINATION POLE EACH 1 $520.00 $520.00 $608.00 $608.00 $350.00 $350.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $19.00 $95.00 $37.00 $185.00 $60.00 $300.00 TOTAL COST PER INTERSECTION $2,017.00 $2,417.00 $2,410.00 8TH 8 CENTRAL . , _ - 155,156 30' LIGHT POLE EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 TOTAL COST PER INTERSECTION $706.00 $242.00 $550.00 7TH 8 CENTRAL , . .- 157,160-162,165 30' LIGHT POLE EACH 5 $353.00 $1,765.00 $121.00 $605.00 $275.00 $1,375.00 163 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 163-166 PEDESTAL SIGNAL EACH 5 $103.00 $515.00 $63.00 $315.00 $195.00 $975.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 6 $19.00 $114.00 $37.00 $222.00 $60.00 $360.00 TOTAL COST PER INTERSECTION $2,530.00 $1,444.00 $3,360.00 6TH 8 CENTRAL 167-168 30' LIGHT POLE EACH 2 $353.00 $706.00 $121.00 $242.00 $275.00 $550.00 TOTAL COST PER INTERSECTION $706.00 $242.00 $550.00 5TH 8 CENTRAL _. : ' ~ - 170,173,175 30' LIGHT POLE EACH 3 $353.00 $1,059.00 $121.00 $363.00 $275.00 $825.00 171 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 171-174 PEDESTAL SIGNAL EACH 4 $103.00 $412.00 $63.00 $252.00 $195.00 $780.00 PEDESTRIAN HEAD w/ BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 5 $19.00 $95.00 $37.00 $185.00 $60.00 $300.00 TOTAL COST PER INTERSECTION $1,702.00 $1 102.00 $2 555.00 , , 9TH $-WHITE _ `_ `" -- - 178 CONTROL CABINETS EACH 1 $56.00 $56.00 $70.00 $70.00 $210.00 $210.00 176 20' MASTARM w/ 2 POLES EACH 1 $509.00 $509.00 $762.00 $762.00 $550.00 $550.00 177,179 30' COMBINATION POLE EACH 2 $520.00 $1,040.00 $608.00 $1,216.00 $350.00 $700.00 178 PEDESTAL SIGNAL EACH 1 $103.00 $103.00 $63.00 $63.00 $195.00 $195.00 PEDESTRIAN HEAD w! BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w! BRACKETS EACH 4 $19.00 $76.00 $37.00 $148.00 $60.00 $240.00 TOTAL COST PER INTERSECTION $1,864.00 $2,491.00 $2,335.00 14TH ~ WHITE . 183,184 20' MASTARM POLE EACH 2 $404.00 $808.00 $439.00 $878.00 $285.00 $570.00 185 20' MASTARM w/ 2 POLES EACH 1 $509.00 $509.00 $762.00 $762.00 $550.00 $550.00 180 PEDESTAL SIGNAL EACH 1 $103.00 $103.00 $63.00 $63.00 $195.00 $195.00 PEDESTRIAN HEAD wl BRACKETS EACH 8 $10.00 $80.00 $29.00 $232.00 $55.00 $440.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 8 $19.00 $152.00 $37.00 $296.00 $60.00 $480.00 TOTAL COST PER INTERSECTION $1,652.00 $2,231.00 $2,235.00 K~\PROJECTS1Downtown Signal & Light Pain ting 2007\Council 8 Staf( Dowm n Pole Painting Bid Tab to Coun cil Page 6 of 7 Photo ITEM REF #'s LOCATION UNIT (~. TY. 15TH & WHITE 181 CONTROL CABINETS EACH 1 $56.00 182 20' MASTARM POLE EACH 1 $404.00 181 30' COMBINATION POLE EACH 1 $520.00 PEDESTRIAN HEAD w/ BRACKETS EACH 2 $10.00 TRAFFIC SIGNAL HEAD w/ BRACKETS EACH 4 $19.00 TOTAL COST PER INTERSECTION TOTAL COST UNIT COST TOTAL COST UNIT COST TOTAL COST $56.00 $70.00 $70.00 $210.00 $210.00 $404.00 $439.00 $439.00 $285.00 $285.00 $520.00 $608.00 $608.00 $350.00 $350.00 $20.00 $29.00 $58.00 $55.00 $110.00 $76.00 $37.00 $148.00 $60.00 $240.00 $1,076.00 $1,323.00 $1,195.00 Bid Sub-Total $58,236.00 Bid Sub-Total $46,571.00 Bid Sub-Total $73,285.00 Contingency (10%) $5,823.60 Construction Engineering & Inspection (15%) 9$ ,608.94 Total Construction Estimate: $73,668.54 % UndeNOver -$20.03 % UnderlOver 25.84 K:\PROJECTS\Downtown Signal 8 Light Painting 2007\Council & Staff DocumentationlAward\Downtown Pole Painting Bid Tab to Council Page 7 of 7