US 52 North Storm Sewer ImprovementTHE CITY OF DUB E ~~-~ MEMORANDUM April 30, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: US 52 North Storm Sewer Improvement Project (CIP#7201810 and CIP#1001122) City Engineer Gus Psihoyos recommends initiation of the bidding process for the US 52 North Storm Sewer Improvement Project, and further recommends that a public hearing be set for May 21, 2007. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM April 30, 2007 TO: Michael C. Van Milligen, City Ma e FROM: Gus Psihoyos, City Engineer SUBJECT: US52 North Storm Sewer Improvement Project (CIP#7201810 & CIP#1001122) INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the US52 North Storm Sewer Improvement Project. BACKGROUND In the fall of 1993, Flexsteel Industries, Dubuque County, and the City of Dubuque officially formed a partnership to address the inadequate drainage in the vicinity of Flexsteel. The City and County each committed to funding an equal third, up to $100,000, for the improvement project that was recommended by IIW Engineers. The project was completed in the winter of 1995 for $301,672.99. The project consisted of the construction of a levee, detention area, and pump station to handle stormwater from Olympic Heights, Highway US52, and Jackson Street. Figure 1 shows the components of the stormwater drainage plan established in 1995. In 1998, the City discovered that debris had filled the storm sewers that convey stormwater from Olympic Heights and US52 to the pump station. While storm sewers are typically designed to pass sediment that naturally passes through a watershed, the gradient, or slope, of the existing storm sewers and the high water table makes them susceptible to debris buildup. A Fiscal Year 1999 appropriation of $338,000 was established for drainage improvements. It was important to design a system not susceptible to the buildup of debris. The levee constructed in 1995 proved effective at preventing the flow of groundwater from north to south of the levee. As a result, it was possible to lower the water surface elevation south of the levee by reconfiguring the pump station. A lower water surface elevation would allow two things: storm sewers less susceptible to debris buildup and a detention basin with increased storage volume. Figure 1. Stormwater drainage system in the vicinity of Flexsteel that was established in 1995. Pump Station e~ ,.'~ ___~ o-.-- 1 -__ r r11 ~~._: ~~ ~ ' ~ ~~ tit ~ ~. _- ; _~•.~~ ~ T'R 7 (D ~' ~ ~ ~a R s? ~~ ~> .~ d ~ *'~ y §f ?p '~,^^ t` ~ U^ ~. ~, /~ ~~~ t P~ ~~ ~ ' . rem :~;, s ~ ~~ ,.. ¢: ~¢/ \\~\ ~ ~ ~~ r 1~~ `~ :'~ -~. The drainage improvements in the vicinity of Flexsteel were split into three projects. The first project involved the excavation of the existing Flexsteel detention basin to increase the available storage volume. It was completed in the fall of 1999 for $32,760.26. The second project, completed in the spring of 2001 for $70,205.91, involved adding a second pump to the pump station with the capability of lowering the water surface elevation two feet below the level previously achieved level established in 1995. The last phase involves storm sewer reconstruction. In addition to the storm sewer improvements associated with the US52 North Storm Sewer Improvement Project, planned additional improvements involve adding ten additional catch basins to better drain US52. When complete, the current number of catch basins on US52 will be doubled. / ~e .~ The Iowa DOT has indicated that the second project could include substantial IDOT funding support. In addition, it can be done in conjunction with IDOT's resurfacing of US52 from W. 32"d Street to the NW Arterial. DISCUSSION The US52 North Storm Sewer Improvement Project consists of replacing a 24-inch diameter storm sewer with a 48-inch diameter storm sewer from the Flexsteel Pumping Station to US52. It will alleviate the ponding condition shown in Figure 3 below. With jurisdiction over US52, the IDOT also has an interest in adequate stormwater drainage of the highway. As a result, IDOT has indicated that the project is eligible for minor IDOT cost sharing. Poor stormwater drainage condition on US52 North. The total estimated project cost is as follows: Construction $ 243,144 Contingency 24,314 Engineering 40,119 ROW/Easement 3,072 Total Project Estimate $ 310,649 The schedule for the project will be as follows: Advertisement for Bids May 11, 2007 Notice of Hearing on Plans & Specifications May 11, 2007 Public Hearing May 21, 2007 Receipt of Bids May 31, 2007 Award of Contract June 18, 2007 Final Completion Date October 12, 2007 RECOMMENDATION I recommend that the City Council establish the date for the public hearing and authorize the City Clerk to advertise for bids for the US52 North .Storm Sewer Improvement Project. BUDGET IMPACT The project will be funded by the following: Balance of CIP#1001122, Jackson & Aquin Drainage: $165,560 Portion of CIP#7201810, US 52 Storm Sewer: $228,000 According to the guidelines provided by District Engineer, Jim Schoebelen provided in January of 2006, up to $50,000 in project costs are eligible for IDOT funding. The actual amount will depend on a negotiated agreement with IDOT. The remaining balance of US 52 Storm Sewer will be reserved for addition storm sewer improvements to be done in conjunction with the IDOT resurfacing of US52 North. ACTION TO BE TAKEN The City Council is ,requested to establish the date for the public hearing and to authorize the City Clerk to advertise for proposals for the US52 North Storm Sewer Improvement Project through adoption of the attached resolutions. Prepared by Deron Muehring cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 254-07 PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the US52 North Storm Sewer Improvement Project, in the estimated amount $310,649.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 7th day of May ,2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 255-07 FIXING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval to the proposed plans, specifications, form of contract, and estimated cost for the US52 North Storm Sewer Improvement Project (the Project) and ordered the same to be on file in the office of the City Clerk for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a public hearing will be held on the 21St day of May, 2007, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published. not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file .objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Passed, adopted and approved this 7th day of May, 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION N0. 256-07 ORDERING THE ADVERTISEMENT FOR BIDS FOR THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the US52 North Storm Sewer Improvement Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published more than twenty days but not more than forty-five days before the date for filing bids at 2:00 p.m. on the 31St day of May, 2007. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at the public hearing at 6:30 p.m. on the 18th day of June, 2007, in the Public Library Auditorium, 360 West 11th Street, Dubuque, Iowa. Passed, adopted and approved this 7th day of May, 2007. Attest: Roy D. Buol, Mayor Jeanne F. Schneider, CMC, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the US52 North Storm Sewer Improvement Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 21St day of May, 2007, in the Public Library Auditorium, 360 West 11tt' Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The US52 North Storm Sewer Improvement Project consists of replacing a 24- inch diameter storm sewer with a 48-inch diameter storm sewer from the Flexsteel Pumping Station to US52. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of , 2007. Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT US52 NORTH STORM SEWER IMPROVEMENT PROJECT Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 31St day of May, 2007, in the Office of the City Clerk, City Hall -First Floor, 50 West 13t" Street, Dubuque, Iowa. Time and Place Sealed Proposals will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on the 31S day of May, 2007, at City Hall - Conference Room B, 50 West 13t" Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on the 18t" day of June, 2007. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by October 12, 2007. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on astate-chartered or federally chartered bank, or a certified share draft drawn on astate-chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall -Second Floor, 50 West 13t" Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. US52 North Storm Sewer Improvement Project (CIP 7201810 &CIP 1001122) The US52 North Storm Sewer Improvement Project consists of replacing a 24-inch diameter storm sewer with a 48-inch diameter storm sewer from the Flexsteel Pumping Station to US52. Pre-Bid Construction Conference. Each prospective bidder is encouraged to attend the Pre-Bid Construction Conference to be held at 2:00 PM on May 24, 2007, at the Conference Room A, City Hall, 50 W. 13th Street, Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, May 11, 2007.