POD Outdoor Plaza Phase ITHE CITY OF DUB E ~,-~-~ MEMORANDUM May 2, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Port of Dubuque Outdoor Plaza -Phase I CIP: 3601855 Sealed bids were received for the Port of Dubuque Outdoor Plaza Project -Phase I. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Nauman Nursery, in the amount of $283,000, which is 11.3% over the estimate of probable cost of $256,315. A delay in the construction of a booth for the parking lot to a future budget year will provide adequate funding. I concur with the recommendation and respectfully request Mayor and City Council approval. ~ l ~~~ ~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DuB E MEMORANDUM ~-~~ April 30, 2007 TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer SUBJECT: Port of Dubuque Outdoor Plaza -Phase I CIP: 3601855 INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Port of Dubuque Outdoor Plaza Project -Phase I. BACKGROUND On July 5, 2006, the City Council approved the selection of Durrant Group, Inc. to provide architectural and engineering services for the Port of Dubuque park, outdoor plaza, and parking lot festival enhancements associated with the McGraw-Hill building project. On a regular basis, City staff, including Assistant City Manager Cindy Steinhauser, Project Manager Steve Brown, Economic Development Director David Heiar, Leisure Services Manager Gil Spence, Park Division Manager Bob Fritsch, Parking System Supervisor Tim Horsfield and Associate Planner Kyle Kritz, have met with representatives from McGraw-Hill and Durrant to discuss design issues and coordination of project construction. As part of the design process for the park, the view corridor established with the construction of the Grand River Center will be preserved. In addition, there are six retail vendor locations identified along Bell Street and Fifth Street. These vendor locations provide an alternate to the first floor retail component that is normally required in new construction at the Port of Dubuque. The design for the park and parking lot also maximizes the utilization of this area for public, private, and commercial usage as a festival site area. Based on available funding, the project has been divided into two major phases. - The Port of Dubuque Outdoor Plaza - Phase I public improvement contract includes the construction of retail vending locations, a concrete plaza area in front of the McGraw-Hill building main entrance, landscaping and turf establishment of the park area along 5th Street. Other separately bid work that will happen during the first major phase includes, the construction of amenities for the parking lot including a gated control system, emergency telephone system locators, 5th Street storm sewer extension, and electrical and water services in the parking lot for festivals. - Phase II includes the: landscaping (40-foot wide decorative concrete surface for the length of the view corridor, raised flower beds, ornamental trees, shrubbery, and accent lighting for the park) and an approximate 40- by 40-foot children's play area at the western end of the park. Funding for Phase II has been budgeted in FY2012. DISCUSSION The Port of Dubuque Outdoor Plaza Project - Phase I contract that is being recommended for award to Nauman Nursery includes the following work: - A public outdoor plaza area that will consist of an approximately 45-foot by 30-foot area between the Bell Street sidewalk and the front entrance to the office building for McGraw-Hill Companies. - A park that consists of a greenspace area approximately 100-foot by 400-foot between the 5th Street sidewalk and the proposed McGraw-Hill building. The Port of Dubuque Outdoor Plaza Project - Phase I contract is anticipated to be completed by July 18, 2007. As part of the development agreement with McGraw-Hill, the City of Dubuque is responsible for the design and construction of the following by the opening of the McGraw-Hill Building in August 2007: - A gated control system for the parking lot. McGraw-Hill will be responsible for construction of the parking lot that will consist of 513 parking spaces immediately west of the McGraw-Hill office building. This parking lot will primarily serve as office parking for employees of McGraw-Hill Companies from 7 a.m. to 6 p.m., Monday through Friday. The parking lot will also be used as a festival site for the Port of Dubuque, with electric and water services sufficient to support these events. The gate control system will be installed at three locations to control access into the parking lot. The system will let McGraw-Hill employees into the lot by card access and allow the public to pay by cash, debit or credit card when using the lot. BID RESULTS Sealed bids were received on the project on April 25, 2007. Nauman Nursery of Dubuque, Iowa, submitted the low bid in the amount of $283,000. This amount is 11.3% over the estimate of probable cost of $256,315.00. A summary of the bid proposals received are as follows: Contractor Name Total Bid Nauman Nursery $283,000.00 Portzen Construction, Inc. $292,300.00 Tricon $311,000.00 Tschiggfrie Excavating Co. $375,180.00 r ~ RECOMMENDATION recommend that the contract for the Port of Dubuque Outdoor Plaza Project -Phase I be awarded to Nauman Nursery in the amount of $283,000.00. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the Port of Dubuque Outdoor Plaza Project -Phase I Replacement Project is summarized as follows: BASE DESIGN - Fifth Street and Bell Street -Plaza Area' - Vendor Spaces - Fifth and Bell Irrigation - Construction Contingency (5%) Subtotal Construction Subtotal ASSOCIATED EXPENDITURES FOR WORK AT MCGRAW -HILL SITE - Parking Lot Festival Utility Enhancements2 - Parking Control (Gated Access, Card Reader and Payment System for McGraw-Hill Employees and the Public) 2 - Code Blue Emergency Telephone System Locations (2) - Parking Attendant Booth z - Fiber Optic Installation for Parking Control2 - Storm Sewer Extension to Accommodate Future Port of Dubuque Site Development2 - Consultants/City Engineering Fees - Reimbursable Expenses Other Cost Subtotal Pre-Bid Estimate Award $ 155,543 $ 73,405 $ 25,367 $ 254,315 $ 12,715 $ 267,030 $ 153,079 $ 144,761 $ 12,000 $ 140,785 $ 42,000 $ 118,000 $ 89,000 $ 2,500 $ 702,125 Total Project Cost $ 969,155 ' Revised to make correction to previous consultant estimate of $ 73,405 2 Will be bid under a different contract. $ 283,000 $ 14,150 $ 297,150 $ 153,079* $ 144, 761 $ 12,000'` $ 40,000* $ 42,000* $ 118,000 $ 89,000 2 500 $ 702,125 $ 898,491 (Estimated Cost) To provide additional funding for the low bid being 11.3% higher than the engineer's estimate ($30,120) and cost of the typographical error in the consultants Pre-Bid Estimate ($82,138), the Engineering Office recommends deferring the construction of the Parking Attendant Booth to a later time. A small prefabricated shelter will still be required to house the electronic and irrigation controls. This change will result in an overall savings of $100,785 to the project budget. The project funding summary is as follows: CIP No. Fund Description Fund Amount 3601855 McGraw-Hill Land Sale (General) $ 369,560 7001050 Ice Harbor/Port of Dubuque Utilities $ 109,000 7001521 Port of Dubuque Existing Lots $ 45,945 7001511 Port of Dubuque Fiber Optics $ 76,166 7301958 Parking Construction Fund (Cash Balance) $ 200,000 7001052 Conference Center -Savings $ 102,455 Available Total Project Funding $ 903,126 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolutions awarding the Port of Dubuque Outdoor Plaza Project -Phase Ito Nauman Nursery in the amount of $283,000.00. Prepared by Steven Sampson Brown, Project Manager cc: Cindy Steinhauser, Assistant City Manager David Heiar, Economic Development Director Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Gil Spence, Leisure Services Manager Bob Fritsch, Park Division Manager Tim Horsfield, Parking System Supervisor Kyle Kritz, Associate Planner F:IPROJECTS\Port of Dubuque - McCraw-Hill\Council\Award\Port of Dubuque Outdoor Plaza - Phase I Award Memo DRAFT.doc RESOLUTION NO. 262-07 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE PORT OF DUBUQUE OUTDOOR PLAZA -PHASE I PROJECT NOW THEREFORE,. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the -Port of Dubuque Outdoor Plaza - Phase I Project, in the estimated amount $283,000.00, are hereby approved. Passed, adopted and approved this 7th day of May, 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 263-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE PORT OF DUBUQUE OUTDOOR PLAZA -PHASE I Whereas, sealed proposals have been submitted by contractors for the Port of Dubuque Outdoor Plaza - Phase I Project (the Project) pursuant to Resolution No. and Notice to Bidders published in a newspaper .published in the City of Dubuque, Iowa on the 3~d and 6th days of April, 2007. Whereas, said sealed proposals were opened and read on the 25thday of April, 2007, and it has been determined that Nauman Nursery of Dubuque, Iowa, with a bid in the amount of $283,000.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY .COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby .awarded to Nauman Nursery and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 7th day of May, 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk ,:: ~G 17l_`hIZAIti''1' 700 Locust Street Suite 942 Dubuque,lA 52001 T 563.583.9131 F 563.557.9078 [Select Location] www durrant.com ,a ~~ ,~,ar. ~~, _, Chicago, IL Denver. CO Des Moines, IA Dubuque, IA Hilo, HI Honolulu, HI Madison, WI Milwaukee, WI Minneapolis, MN Phoenix, AZ SL Louis, MO Tucson, AZ rlpri125, 2007 Gus Psihoyos, City Engineer City of Dubuque 50 West 13~h Street Dubuque, Iowa 52001 Project: City of Dubuque's Outdoor Plaza Receipt of Bids Project No.: 07001.00 Gus, Attached please find the Bid Tally for the above noted project. Four bids were received and Nauman Nursery of Dubuque appears to be the low bid. We have reviewed the bids and recommend that the contract be awarded to Nauman Nursery. We would recommend the base bid be accepted and neither of the deductive alternates. Sincerely ~e~e~ s Steven Ulstad SU/ag Enclosure copies: Steve Brown Lynn Schlueter V:AVrojccts\O7U01.U0.Crty of Dub Outdoor Plaza & Parking I,crt\\X~P\CORR\O\K'N rSR\Ps~hoyos bid recommendanon hr.doc BID TALLY SHEET Project: Port of Dubuque Outdoor Plaza Phase 1 Address: Dubuque, Iowa Date: 4.25.07 Project No.: 07001.00 Company Addendum 1 Bid Proposal Form 1B Bid Bond Base Bid Alternate 1 Irrigation System Alternate 2 Vendor Areas Nauman Nursery X X $ 283,000.00 $-13,350.00 $-65,350.00 Portzen X X $ 292,300.00 $-13,350.00 $-63,751.00 Tricon X X $ 311,000.00 $-13,500.00 $-36,000.00 Tschiggfrie X X $ 375,180.00 $-18,350.00 $-131,713.00 Durrant SPC (3/26/07) $ 256,315.00 $ 25,367.00 $ 73,405.00 P:APm~eccs~0~00L00-Cnp of Dub (Andoor Plaza & Parking LotAACP\MISC~B,d Tally.doc