Loading...
Elm Street Parking Lot Project_AwardTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Elm Street Parking Lot DATE: August 12, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Sealed bids were received for the Elm Street Parking Lot Project. Parking Division Manager Tim Horsfield recommends award of the contract to the low bidder, Tschiggfrie Excavating, in the amount of $424,939.22, which is 5.66% under the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. bd-144 t, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Tim Horsfield, Parking Division Manager THE CITY OF Dui Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Tim Horsfield, Parking Division Manager SUBJECT: Elm Street Parking Lot DATE: August 8, 2014 Dubuque bitetri All -America City 1 r 2007 • 2012 • 2013 INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the 82 stall public parking lot within the Historic Millwork District. This parking lot will provide a portion of the parking included in the development agreement with Novelty Iron Works. DISCUSSION The Capital Improvement Budget includes $3,280,151 to begin the development of public parking within the Historic Millwork District. The parking will be constructed with concrete curb and gutter and asphalt pavement. The parking lot will have lighting that matches the street lighting used throughout the District and will be gate controlled. A Phase I and Phase II Environmental Site Assessments (ESA) were completed for the area, of the proposed parking lot, in May and June of this year. The Phase II ESA found two areas that show elevated levels of contaminants above the Statewide Standard for Contaminants in Soil. The environmental engineer provided the City with a map documenting the extent of the impacted soils and made recommendations for disposal of the impacted soils. The recommendation is to dispose of the impacted soils at a landfill that is able to accept the material. The Dubuque Metropolitan Area Solid Waste Agency (DMASWA) is capable of accepting this material. The estimated volume of impacted soils to be disposed at a landfill is approximately 1,600 tons. DMASWA quoted a price of $76.84 per ton for disposal. Engineering has estimated that an additional $6.25 per ton would be needed for trucking to this facility. The total fee per ton is estimated to be $83.09 per ton. DMASWA does provide a rebate to the City of $6.73 per ton after three months. This would reduce the fee to$76.36 per ton. The City is exploring other options for the disposal of the impacted soils, in an attempt to reduce project costs. The quantity of impacted soils may vary depending on what is or isn't found during construction. Excavation, along with additional soil sampling and testing, may find additional impacted soils or determine a lessor amount of impacted soils needing to be disposed of at a landfill. The current construction estimate is based on disposal of the impacted soil at the DMASWA facility until further testing can be completed during construction. BID RESULTS Sealed bids were received on the project on August 7, 2014. Tschiggfrie Excavating of Dubuque, Iowa submitted the low bid in the amount of $424,939.22. This amount is 5.66% under the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Bid Results Tschiggfrie Excavating $ 424,939.22 Portzen Construction, Inc. $ 441,875.37 RECOMMENDATION I recommend that the contract be awarded to Tschiggfrie Excavating in the amount of $424,939.22. BUDGET IMPACT The summary of project costs for the Elm Street Parking Lot Project is summarized as follows: Estimate Award Construction Contract $448,275.70 $424,939.22 Pre -purchased lights 41,241.24 41,241.24 Contingency 44,827.57 45,042.57 Construction Engineering & Inspection 73,965.49 67,563.86 Total Project Cost $608,310.00 $578,786.89 The project funding summary is as follows: CIP No. FY Fund Description 3602250 2014 Millwork District Parking Total Project Funding Fund Amount $3,280,150.77 $3,280,150.77 The Elm Street Parking Lot project will be funded through the Millwork District Parking capital improvement project appropriation in the amount of $578,786.89. 2 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Elm Street Parking Lot project to Tschiggfrie Excavating in the amount of $424,939.22. Prepared by Todd Irwin Cc: Jenny Larson, Budget Director Maurice Jones, Economic Development Director Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II Todd Irwin, Engineering Technician 3 RESOLUTION NO. 261-14 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE ELM STREET PARKING LOT PROJECT Whereas, sealed proposals have been submitted by contractors for the Elm Street Parking Lot Project (the Project) pursuant to Resolution No. 216-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 25th day of July, 2014, and; Whereas, said sealed proposals were opened and read on the 7th day of August, 2014 and it has been determined that Tschiggfrie Excavating of Dubuque, Iowa with a bid proposal in the amount of $424,939.22, is the responsive, responsible bidder for the Project, and; Whereas, it has been determined that it is in the best interest of the City of Dubuque to enter into an improvement contract with Tschiggfrie Excavating for said Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 18th day of August, 2014. Attest: Ke in Firnstahl, City Roy D. Buol, Mayor LINE NO. THE CITY OF DUB Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation Elm Street Parking Lot BID ITEM DESCRIPTION Division2010 - Earthwork, Subgrad e, and Subbase 1 2010-108-13-0 Clearing and Grubbing B 2 2010-108-D-1 Topsoil, On-site 3 2010-108-E-0 Excavation, Class 10 4 2010-108-F-0 Below Grade Excavation (Core Out) 5 2010-108-1-0 Subbase, Granular Subbase - Gradation 12a 6 2010-108-M-0 Disposal, Contaminated Excavation Spoils Division3010 -Trench Excavation and Backfill 7 3010-108-D-0 Trench Foundation- 3" Breaker 8 3010-108-D-0 Bedding Material, Clean Stone,1" 9 3010-108-D-0 Replacement of Unsuitable Backfill Material Gradation 32 (Man. Sand) 10 3010-108-J-3 Trenching, 48 Inch Depth 11 3010-108-1-2 Trenching, 26 Inch Depth Division 4020 - Storm Sewers 12 4020-108-A1 Storm Sewer Gravity Main, Trenched, 15" RCP 13 4020-108-F-0 Concrete Collar Connection- Type PC -1 Division 5020 - Valves, Fire Hydrants, and Appurtenances 14 5020-108-H-0 Fire Hydrant Adjustment Division 6070 - Structures for Sanitary and Storm Sewers 15 6010-108-13-0 Intake Type, Cast -In -Place, SW -501 16 6010-108-13-0 Intake Type, PreCast, SW -501 Division 7070 - Portland Cement Concrete Pavement 17 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 18 7010-108-A0 Pavement, PCC, 8" (Thickness) Division 7020 - Hot Mix Asphalt Pavement 19 7020-108-B-0 Pavement or Overlay, HMA, 6" (Thickness) Division7030 - Sidewalks, Shared Use Paths, and Driveways 20 7030-108-E-0 Sidewalk, PCC, 4" (Thickness) 21 7030-108-G-0 Detectable Warning Division 7040 - Pavement Rehabilitation 22 7040-108-H-0 Removal- Pavement Division 8070 - Traffic Signals & Lighting 23 8010-108-A1 Handhole, PC, Round 24 8010-108-A2 Handhole, Composite, Small 25 8010-108-B-1 Conduit, Trenched, HDPE, 2" 26 8010-108-D.1 Street Light Precast Concrete Base, 2' Dia. x 7' 27 8010-108-G-0 Connections to Handholes and Vauts 28 8010-108-M-0 Street Light, Type DM Bid Date PLAN 0UANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Tschiggfne Excavating Co. BID UNIT PRICE TOTAL PRICE Portzen Construction BID UNIT PRICE TOTAL PRICE 0.75 AC $ 5.00 $ 3.75 $ 6,400.00 $ 4,800.00 $ 7,500.00 $ 5,625.00 400 CY $ 3.00 $ 1,200.00 $ 9.75 $ 3,900.00 $ 11.00 $ 4,400.00 2050 CY $ 9.00 $ 18,450.00 $ 14.50 $ 29,725.00 $ 18.00 $ 36,900.00 1000 TON $ 29.00 $ 29,000.00 $ 19.35 $ 19,350.00 $ 13.00 $ 13,000.00 2600 TON $ 15.00 $ 39,000.00 $ 13.65 $ 35,490.00 $ 20.00 $ 52,000.00 1600 TON $ 83.09 $ 132,944.00 $ 60.00 $ 96,000.00 $ 25.00 $ 40,000.00 Sub Total $ 220,597.75 Sub Total $ 189,265.00 Sub Total $ 151,925.00 15 TON $ 20.00 $ 300.00 $ 33.20 $ 498.00 $ 65.00 $ 975.00 90 TON $ 15.00 $ 1,350.00 $ 20.35 $ 1,831.50 $ 35.00 $ 3,150.00 715 TON $ 15.00 $ 10,725.00 $ 23.55 $ 16,838.25 $ 20.00 $ 14,300.00 530 LF $ 4.50 $ 2,385.00 $ 20.45 $ 10,838.50 $ 14.00 $ 7,420.00 80 LF $ 2.50 $ 200.00 $ 15.35 $ 1,228.00 $ 12.00 $ 960.00 Sub Total $ 14,960.00 Sub Total $ 31,234.25 Sub Total $ 26,805.00 208 LF $ 85.00 $ 17,680.00 $ 61.00 $ 12,688.00 $ 75.00 $ 15,600.00 3 EA $ 350.00 $ 1,050.00 $ 603.00 $ 1,809.00 $ 1,800.00 $ 5,400.00 Sub Total $ 18,730.00 Sub Total $ 14,497.00 Sub Total $ 21,000.00 1 EA $ 500.00 $ 500.00 $ 1,110.00 $ 1,110.00 $ 1,800.00 $ 1,800.00 $ $ 500.00 Sub Total $ 1,110.00 Sub Total $ 1,800.00 1 EA $ 2,500.00 $ 2,500.00 $ 4,260.00 $ 4,260.00 $ 45,000.00 $ 45,000.00 6 EA $ 1,800.00 $ 10,800.00 $ 3,160.00 $ 18,960.00 $ 2,200.00 $ 13,200.00 $ $ 13,300.00 Sub Total $ 23,220.00 Sub Total $ 58,200.00 1165 LF $ 27.00 $ 31,455.00 $ 20.15 $ 23,474.75 $ 29.00 $ 33,785.00 227 SY $ 52.00 $ 11,788.40 $ 52.25 $ 11,845.08 $ 65.00 $ 14,735.50 Sub Total $ 43,243.40 Sub Total $ 35,319.83 Sub Total $ 48,520.50 2804.26 SY $ 30.00 $ 84,127.80 $ 24.40 $ 68,423.94 $ 27.00 $ 75,715.02 Sub Total $ 84,127.80 Sub Total $ 68,423.94 Sub Total $ 75,715.02 16 SY $ 50.00 $ 800.00 $ 38.85 $ 621.60 $ 85.00 $ 1,360.00 12 SF $ 35.00 $ 420.00 $ 34.55 $ 414.60 $ 60.00 $ 720.00 Sub Total $ 1,220.00 Sub Total $ 1,036.20 Sub Total $ 2,080.00 150 SY $ 10.00 $ 1,500.00 $ 19.15 $ 2,872.50 $ 20.00 $ 3,000.00 Sub Total $ 1,500.00 Sub Total $ 2,872.50 Sub Total $ 3,000.00 1 EA $ 1,200.00 $ 1,200.00 $ 1,250.00 $ 1,250.00 $ 1,500.00 $ 1,500.00 8 EA $ 650.00 $ 5,200.00 $ 660.00 $ 5,280.00 $ 1,200.00 $ 9,600.00 1,260 LF $ 6.50 $ 8,190.00 $ 20.25 $ 25,515.00 $ 9.00 $ 11,340.00 9 EA $ 1,200.00 $ 10,800.00 $ 1,375.00 $ 12,375.00 $ 2,200.00 $ 19,800.00 2 EA $ 100.00 $ 200.00 $ 480.00 $ 960.00 $ 300.00 $ 600.00 9 EA $ 2,500.00 $ 22,500.00 $ 890.00 $ 8,010.00 $ 425.00 $ 3,825.00 Sub Total $ 48,090.00 Sub Total $ 53,390.00 Sub Total $ 46,665.00 LINE NO. Project Name: ITEM NUMBER Elm Street Parking Lot BID ITEM DESCRIPTION IDOT Division 2527 -Pavement Marking 29 IDOT 2527.04-A-1 Painted Pavement Markings 30 IDOT 2527.04-A-4 Painted Symbols and Legends Division 9010 -Seeding 31 9010-108-A-0 Conventional - Seeding, Fertilizing, and Mulching, Type 1 Division 9040 - Erosion and Sediment Control 32 9040-108-D-1 Filter Socks, 12" 33 9040-108-D-2 Filter Socks, Removal 34 9040-108-0-2 Stabilized Construction Entrance Wt Bid Date 7 -Aug -14 PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Tschiggfrie Excavating Co. BID UNIT PRICE TOTAL PRICE Portzen Construction BID UNIT PRICE TOTAL PRICE 15.27 STA $ 25.00 $ 381.75 $ 50.00 $ 763.50 $ 55.00 $ 15 EA $ 60.00 $ 900.00 $ 50.00 $ 750.00 $ 55.00 $ Sub Total $ 1,281.75 Sub Total $ 1,513.50 Sub Total $ 1,664.85 839.85 825.00 0.15 AC $ 4,500.00 $ 675.00 $ 7,000.00 $ 1,050.00 $ 8,000.00 $ 1,200.00 Sub Total $ 675.00 Sub Total $ 1,050.00 Sub Total $ 1,200.00 100 LF $ 10.00 $ 1,000.00 $ 3.50 $ 350.00 $ 10.00 $ 1,000.00 100 LF $ 3.00 $ 300.00 $ 1.00 $ 100.00 $ 2.00 $ 200.00 60 TON $ 15.00 $ 900.00 $ 25.95 $ 1,557.00 $ 35.00 $ 2,100.00 %Over/ Under (-) Sub Total $ 2,200.00 Sub Total $ 2,007.00 Sub Total $ 3,300.00 Total Est. $ 450,425.70 Contract Award Amount: $ 450,425.70 Total Bid $ 424,939.22 Total Bid $ 441,875.37 -5.66% -1 90% $ 424,939.22 $ 441,875.37