Loading...
Asbury Plaza Waste Water Pumping FacilityTHE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM C7 May 15, 2007 ~ ~ -~ c ~~% a, ;7 .~a ~~ ~ ~ ~. TO: The Honorable Mayor and City Council Members ~' ~ °D ~ FROM: Michael C. Van Milligen, City Manager SUBJECT: Asbury Plaza Area Wastewater Pumping Facilities 2007 Project (CIP#7101350) In February of 2006, IIW Engineers completed the Northwest Asbury Plaza Area Wastewater Pumping Feasibility Report. It outlined the recommended sanitary sewer system collection system to serve the property north of Asbury Road. The Pre- Annexation Agreement with Motor City LLC and John Herrig called for the City to construct a lift station and force main sanitary sewer to serve the property. Sealed bids were received for the Asbury Plaza Area Wastewater Pumping Facilities 2007 Project. City Engineer Gus Psihoyos is recommending award to the low bidder, McDermott Excavating, in the amount of $618,342.84. This amount is 18.31 % under the engineer's estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~~~ ~G2 1~ ~-~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM May 11, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer _ SUBJECT: Asbury Plaza Area Wastewater Pumping Facilities 2007 Project (CIP#7101350) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the Asbury Plaza Area Wastewater Pumping Facilities 2007 Project. BACKGROUND In February of 2006, IIW Engineers & Surveyors, PC (IIW) (Dubuque, Iowa) completed the Northwest Asbury Plaza Area Wastewater Pumping Feasibility Report (Report). It outlined the recommended sanitary sewer system collection system to serve property north of Asbury Plaza. The specific properties that could be served by the proposed system are owned by: Motor City LLC; John Herrig; Grand View United Methodist Church; Dean and Patricia Butler; Leo and Arlene Dietz*; Clement and Jeannine Hilby*; Douglas and Eileen Coates*; and Laverne and Marlene Brimeyer'~. (" Currently not within City limits) With the adoption of the Fiscal Year 2007 Capital Improvement Budget, the City Council established funding (CIP#7101350) for City participation in the extension of sanitary sewers into new development areas or recently-annexed areas as part of pre-annexation agreements. The voluntary annexation of the Motor City (Corey) property and the Herrig property were approved by the City Council in June and July of 2006, respectively. The pre-annexation agreement calls for the City to "construct a lift station and force main sanitary sewer to serve the property." This sewer project will provide sanitary sewer service to the Motor City (Corey) property and the eastern portion of the Herrig property. The City will incur all expenses of the wastewater pumping facilities and forcemain; and when properties in the drainage basin connect to this system, the property owners would be required to reimburse the City the respective connection fees based on $500 per acre. BID RESULTS Sealed bids were received on the project on May 10, 2007. McDermott Excavating of Dubuque, Iowa, submitted the low bid in the amount of $618,342.84. This amount is 18.31 % under the engineer's estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid McDermott Excavating $618,342.84 WC Stewart Construction $649,653.42 Tschiggfrie Excavating $809,978.60 Portzen Construction, Inc. $902,220.50 RECOMMENDATION I recommend that the contract be awarded to McDermott Excavating in the amount of $618, 342.84. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the Asbury Plaza Area Wastewater Pumping Facilities 2007 Project is summarized as follows: Construction Contract Cost Estimate Bid Award $ 756,930.00 $618,342.84. Contingency Construction Engineering & Inspection 113, 540.00 113, 540.00 130, 000.00 130, 000.00 $1,000,470.00 $861,882.84 The project will be funded with the Fiscal Year 2006 appropriation of $1,012,000 (Sanitary Sewer External Extensions -Annexation) using General Obligation Bond proceeds. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Asbury Plaza Area Wastewater Pumping Facilities 2007 Project to McDermott Excavating in the amount of $618,342.84. Prepared by Deron Muehring, Civil Engineer II cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II RESOLUTION NO. 304-07 AWARDING PUBLIC IMPROVEMENT CONTRACT fOR THE ASBURY PLAZA WASTEWATER PUMPING FACILITIES 2007 PROJECT Whereas, sealed proposals have been submitted by contractors #or the Asbury Plaza Wastewater Pumping Facilities 2007 Project the Pfioject) pursuant to Resolution Nov 23-07; and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 20th day of April, 2007. Whereas, said sealed proposals were opened and read on the 10th day of May, 2007 and it has been determined that McDermott Excavating of Dubuque, Iowa, with a bid in the amount of $618,342.84, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, $E IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded #o McDermott Excavating and the City Manager is hereby directed #o execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 21st day of May, 2007. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, Assistant City Clerk ASBURY PLAZA AREA WASTEWATER PUMPING FACILITIES PROJECT CIP NO. 7101350 BID RESULT TABULATION 10-May-07 NO. DESCRIPTION GENERAL 1 Mobilization and Miscellaneous 2 Traffic Control 3 Silt Fence, Installation and Removal 4 Temporary Construction Entrance 5 Storm Water Pollution Prevention Plan incl. Inspection, Reports, Maintenance, etc 6 Seeding, Fertilizing, and Mulching SANITARY SEWER 7 10"DIP Sanitary Sewer Class 51 8 8" DIP Sanitary Sewer Class 51 9 8" PVC Sanitary Sewer SDR 26 10 10" Sanitary Sewer Cap 11 8" Sanitary Sewer Cap 12 Manhole Base 13 Manhole Sidewal 14 Bolt Down Frame and Cover (R1916D) 15 Standard Frame and Cover (R1642A) 16 Reinstall Existing Frame and Cover (on MH 4, 5) 17 Outside Drop at MH AA (PS #2) 18 Connect to MH A (w/Direct Drive Sleeve) 19 Remove Manhole (MH B and MH C) 20 Connect to Existing Sewer (MH 4 and MH 5) 21 Sanitary Sewer Rock Excavation 0 FORCE MAIN 22 6" DIP Force Main Class 51 23 6" PVC Force Main Sch. 40 (at meter) 24 8" PVC Force Main C900 DR 18 (open cut) 25 8" PVC Force Main C900 DR 18 (directional drilling) 26 8" Gate Valve w/Box and Adaptor II 27 Force Main Fittings (compact ductile iron) 28 Tracer Wire Terminal Boxes 29 Tracer Wire, Open Cut (#12 stranded copper) 30 Tracer Wire, Drilled (#8 stranded SST) 31 Air Release Structure (w/MH, air valve, pipe, fittings, ball valve, vent, couplings, e 32 Connect to MH 3 33 Force Main Rock Excavation 34 Select Force Main Backfill Crushed Stone (at proposed streets) 35 Initial Soil Backfill in Rock Trenches PUMPING STATIONS 36 Meter Manhole (incl. meter, stone, pipe support, casting, and mantwle) 37 Pumping Station Rock Excavation 38 Finish Grading Pump Station Site 39 Crushed Stone Base (under PCC) 40 6" PCC Driveway 41 4" PCC Sidewalk 42 6" Crushed Stone Surfacing 43 6 Ft. Chain Link Fence 44 16 Ft. Doublegate w/Gate Latch 45 Pump Station #1 (incl. wet well, valve vault, building, electrical, gen-set) 46 Pump Station #2 (incl. wet well, valve vault, building, electrical, gen-set) 47 Transformer Pad 48 1" PVC Conduit w/Control Wires BIDDER Engineers Estimate McDermott Excavating UNIT TOTAL UNIT TOTAL QUANTITY PRICE PRICE PRICE PRICE 1 LS $ 25,000.00 $ 25,000.00 $ 11,750.00 $ 11,750.00 1 LS $ 2,500.00 $ 2,500.00 $ 950,00 $ 950.00 2900 LF $ 3.00 $ 8,700.00 $ 1.72 $ 4,988.00 2 EA $ 750.00 $ 1,500.00 $ 965.00 $ 1,930.00 1 LS $ 1,500.00 $ 1,500.00 $ 600.00 $ 600.00 3.5 AC $ 1,500.00 $ 5,250.00 $ 1,072.50 $ 3,753.75 36 LF $ 40.00 $ 1,440.00 $ 39.25 $ 1,413.00 138 LF $ 30.00 $ 4,140.00 $ 27.03 $ 3,730.14 1110 LF $ 19.00 $ 21,090.00 $ 13.33 $ 14,796.30 1 EA $ 100.00 $ 100.00 $ 107.20 $ 107.20 2 EA $ 90.00 $ 180.00 $ 78.50 $ 157.00 6 EA $ 700.00 $ 4,200.00 $ 591.53 $ 3,549.18 68 LF $ 100.00 $ 6,600.00 $ 87.91 $ 5,977.88 3 EA $ 500.00 $ 1,500.00 $ 381.40 $ 1,144.20 1 EA $ 400.00 $ 400.00 $ 300.00 $ 300.00 2 EA $ 150.00 $ 300.00 $ 125.00 $ 250.00 1 EA $ 700.00 $ 700.00 $ 1,773.00 $ 1,773.00 1 EA $ 1,000.00 $ 1,000.00 $ 300.00 $ 300.00 2 EA $ 500.00 $ 1,000.00 $ 225.00 $ 450.00 2 EA $ 500.00 $ 1,000.00 $ 150.00 $ 300.00 910 CY $ 45.00 $ 40,950.00 $ 45.00 $ 40,950.00 18 LF $ 50.00 $ 900.00 $ 28.73 $ 517.14 20 LF $ 70.00 $ 1,400.00 $ 21.07 $ 421.40 5370 LF $ 19.00 $ 102,030.00 $ 15.81 $ 84,899.70 1420 LF $ 35.00 $ 49,700.00 $ 31.78 $ 45,127.60 3 EA $ 850.00 $ 2,550.00 $ 896.00 $ 2,688.00 600 LBS $ 3.00 $ 1,800.00 $ 2.79 $ 1,674.00 12 EA $ 85.00 $ 1,020.00 $ 38.83 $ 465.96 5500 LF $ 0.50 $ 2,750.00 $ 0.31 $ 1,705.00 1500 LF $ 1.00 $ 1,500.00 $ 0.29 $ 435.00 1 EA $ 5,300.00 $ 5,300.00 $ 5,877.70 $ 5,877.70 1 EA $ 500.00 $ 500.00 $ 150.00 $ 150.00 1640 CY $ 45.00 $ 73,800.00 $ 45.00 $ 73,800.00 1000 TON $ 10.00 $ 10,000.00 $ 11.10 $ 11,100.00 650 CY $ 8.00 $ 5,200.00 $ 7.00 $ 4,550.00 2 EA $ 9,000.00 $ 18,000.00 $ 5,876.30 $ 11,752.60 80 CY $ 100.00 $ 8,000.00 $ 45.00 $ 3,600.00 2 EA $ 1,000.00 $ 2,000.00 $ 175.00 $ 350.00 60 TON $ 11.00 $ 660.00 $ 15.80 $ 948.00 110 SY $ 36.00 $ 3,960.00 $ 40.90 $ 4,499.00 34 SY $ 30.00 $ 1,020.00 $ 37.41 $ 1,271.94 90 TON $ 11.00 $ 990.00 $ 13.55 $ 1,219.50 300 LF $ 22.00 $ 6,600.00 $ 16.80 $ 5,040.00 2 EA $ 900.00 $ 1,800.00 $ 840.00 $ 1,680.00 1 LS $ 150,000.00 $ 150,000.00 $108,547.46 $ 108,547.46 1 LS $170,000.00 $ 170,000.00 $130,218.19 $ 130,218.19 2 EA $ 350.00 $ 700.00 $ 755.00 $ 1,510.00 1100 LF $ 5.00 $ 5,500.00 $ 13.75 $ 15,125.00 Over f Under (-) Total $ 756,930.00 Total $ 618,342.84 -18.31 ASBURY PLAZA AREA WASTEWATER PUMPING FACILITIES PROJECT CIP NO. 7101350 BID RESULT TABULATION 10-May-07 NO. DESCRIPTION GENERAL 1 Mobilization and Miscellaneous 2 Traffic Control 3 Sill Fence, Installation and Removal 4 Temporary Construction Entrance 5 Storm Water Pollution Prevention Plan incl. Inspection, Reports, Maintenance, el~ 6 Seeding, Fertilizing, and Mulching SANITARY SEWER 7 10" DIP Sanitary Sewer Class 51 8 8"DIP Sanitary Sewer Class 51 9 8" PVC Sanitary Sewer SDR 26 10 10" Sanitary Sewer Cap 11 8" Sanitary Sewer Cap 12 Manhole Base 13 Manhole Sidewak 14 Bolt Down Frame and Cover (R1916D) 15 Standard Frame and Cover (R1642A) 16 Reinstall Existing Frame and Cover (on MH 4, 5) 17 Outside Drop at MH AA (PS #2) 18 Connect to MH A (w/Direct Drive Sleeve) 19 Remove Manhole (MH B and MH C) 20 Connect to Existing Sewer (MH 4 and MH 5) 21 Sanitary Sewer Rock Excavation 0 FORCE MAIN 22 6" DIP Force Main Class 51 23 6" PVC Force Main Sch. 40 (at meter) 24 8" PVC Force Main C900 DR 18 (open cut) 25 8" PVC Force Main C900 DR 18 (directional drilling) 26 8" Gate Valve w/Box and Adaptor II 27 Force Main Fittings (compact ductile iron) 28 Tracer Wre Terminal Boxes 29 Tracer Wre, Open Cut (#12 stranded copper) 30 Tracer Wre, Drilled (#8 stranded SST) 31 Air Release Structure (w/MH, air valve, pipe, fittings, ball valve, vent, couplings, e 32 Connect to MH 3 33 Force Main Rock Excavation 34 Select Force Main Backfill Crushed Stone (at proposed streets) 35 Initial Soil Backfill in Rock Trenches PUMPING STATIONS 36 Meter Manhole (incl. meter, stone, pipe support, casting, and manhole) 37 Pumping Station Rock Excavation 38 Finish Grading Pump Station Site 39 Crushed Stone Base (under PCC) 40 6" PCC Driveway 41 4" PCC Sidewalk 42 6" Crushed Stone Surfacing 43 6 Ft. Chain Link Fence 44 16 Ft. Doublegate w/Gale Latch 45 Pump Station #1 (incl. wet well, valve vault, building, electrical, gen-set) 46 Pump Station #2 (incl. wet well, valve vault, building, electrical, gen-set) 47 Transformer Pad 48 1" PVC Conduit w/Control Wires BIDDER BIDDER WC Stewart Construction Tschiggfrie Excavating UNIT TOTAL UNIT TOTAL QUANTITY PRICE PRICE PRICE PRICE 1 LS $ 40,000.00 $ 40,000.00 $ 31,700.00 $ 31,700.00 1 LS $ 2,000.00 $ 2,000.00 $ 1,925.00 $ 1,925.00 2900 LF $ 5.00 $ 14,500.00 $ 2.20 $ 6,380.00 2 EA $ 850.00 $ 1,700.00 $ 1,180.00 $ 2,360.00 1 LS $ 7,500.00 $ 7,500.00 $ 1,080.00 $ 1,080.00 3.5 AC $ 1,500.00 $ 5,250.00 $ 1,073.00 $ 3,755.50 36 LF $ 39.72 $ 1,429.92 $ 41.65 $ 1,499.40 138 LF $ 33.80 $ 4,664.40 $ 36.45 $ 5,030.10 1110 LF $ 26.07 $ 28,937.70 $ 27.70 $ 30,747.00 1 EA $ 97.50 $ 97.50 $ 162.00 $ 162.00 2 EA $ 78.50 $ 157.00 $ 145.00 $ 290.00 6 EA $ 450.00 $ 2,700.00 $ 619.00 $ 3,714.00 68 LF $ 85.00 $ 5,780.00 $ 117.00 $ 7,956.00 3 EA $ 350.00 $ 1,050.00 $ 412.00 $ 1,236.00 1 EA $ 275.00 $ 275.00 $ 343.00 $ 343.00 2 EA $ 125.00 $ 250.00 $ 124.00 $ 248.00 1 EA $ 850.00 $ 850.00 $ 423.00 $ 423.00 1 EA $ 300.00 $ 300.00 $ 369.00 $ 369.00 2 EA $ 850.00 $ 1,700.00 $ 410.00 $ 820.00 2 EA $ 850.00 $ 1,700.00 $ 369.00 $ 738.00 910 CY $ 5.00 $ 4,550.00 $ 19.00 $ 17,290.00 18 LF $ 31.00 $ 558.00 $ 33.90 $ 610.20 20 LF $ 25.36 $ 507.20 $ 28.15 $ 563.00 5370 LF $ 27.50 $ 147,675.00 $ 29.50 $ 158,415.00 1420 LF $ 53.20 $ 75,544.00 $ 52.80 $ 74,976.00 3 EA $ 850.00 $ 2,550.00 $ 900.00 $ 2,700.00 600 LBS $ 4.00 $ 2,400.00 $ 4.85 $ 2,910.00 12 EA $ 57.60 $ 691.20 $ 156.00 $ 1,872.00 5500 LF $ 0.50 $ 2,750.00 $ 0.40 $ 2,200.00 1500 LF $ 0.45 $ 675.00 $ 0.40 $ 600.00 1 EA $ 5,000.00 ~ $ 5,000.00 $ 5,825.00 $ 5,825.00 1 EA $ 350.00 $ 350.00 $ 369.00 $ 369.00 1640 CY $ 5.00 $ 8,200.00 $ 19.00 $ 31,160.00 1000 TON $ 13.00 $ 13,000.00 $ 4.90 $ 4,900.00 650 CY $ 3.50 $ 2,275.00 $ 3.50 $ 2,275.00 2 EA $ 11,500.00 $ 23,000.00 $ 8,435.00 $ 16,870.00 80 CY $ 5.00 $ 400.00 $ 19.00 $ 1,520.00 2 EA $ 1,250.00 $ 2,500.00 $ 2,160.00 $ 4,320.00 60 TON $ 13.00 $ 780.00 $ 11.90 $ 714.00 110 SY $ 44.25 $ 4,867.50 $ 38.05 $ 4,185.50 34 SY $ 33.00 $ 1,122.00 $ 32.85 $ 1,116.90 90 TON $ 13.00 $ 1,170.00 $ 11.90 $ 1,071,00 300 LF $ 20.00 $ 6,000.00 $ 22.00 $ 6,600.00 2 EA $ 1,750.00 $ 3,500.00 $ 550.00 $ 1,100.00 1 LS $100,831.56 $ 100,831.56 $169,450.00 $ 169,450.00 1 LS $107,490.44 $ 107,490.44 $187,020.00 $ 187,020.00 2 EA $ 675.00 $ 1,350.00 $ 435.00 $ 870.00 1100 LF $ 8.25 $ 9,075.00 $ 7.00 $ 7,700.00 Total $ 649,653.42 Total $ 809,978.60 Over /Under (-) -14.17 7.01 °h ASBURY PLAZA AREA WASTEWATER PUMPING FACILITIES PROJECT CIP NO. 7101350 BID RESULT TABULATION 10-May-07 BIDDER Portzen Construction, Inc. UNIT TOTAL NO. DESCRIPTION QUANTITY PRICE PRICE GENERAL 1 Mobilization and Miscellaneous 1 LS $ 15,000.00 $ 15,000.00 2 Traffic Control 1 LS $ 2,500.00 $ 2,500.00 3 Silt Fence, Installation and Removal 2900 LF $ 2.50 $ 7,250.00 4 Temporary Construction Entrance 2 EA $ 1,500.00 $ 3,000.00 5 Storm Water Pollution Prevention Plan incl. Inspection, Reports, Maintenance, eta 1 LS $ 8,500.00 $ 8,500.00 6 Seeding, Fertilizing, and Mulching 3.5 AC $ 1,500.00 $ 5,250.00 SANITARY SEWER 7 10"DIP Sanitary Sewer Class 51 36 LF $ 48.00 $ 1,728.00 8 8" DIP Sanitary Sewer Class 51 138 LF $ 52.00 $ 7,176.00 9 8" PVC Sanitary Sewer SDR 26 1110 LF $ 38.00 $ 42,180.00 10 10" Sanitary Sewer Cap 1 EA $ 160.00 $ 160.00 11 8" Sanitary Sewer Cap 2 EA $ 140.00 $ 280.00 12 Manhole Base 6 EA $ 600.00 $ 3,600.00 13 Manhole Sidewal 68 LF $ 130.00 $ 8,840.00 14 Bolt Down Frame and Cover (R1916D) 3 EA $ 375.00 $ 1,125.00 15 Standard Frame and Cover (R1642A) 1 EA $ 325.00 $ 325.00 16 Reinstall Existing Frame and Cover (on MH 4, 5) 2 EA $ 125.00 $ 250.00 17 Outside Drop at MH AA (PS #2) 1 EA $ 1,100.00 $ 1,100.00 18 Connect to MH A (w/Direct Drive Sleeve) 1 EA $ 1,500.00 $ 1,500.00 19 Remove Manhole (MH B and MH C) 2 EA $ 450.00 $ 900.00 20 Connect to Existing Sewer (MH 4 and MH 5) 2 EA $ 375.00 $ 750.00 21 Sanitary Sewer Rock Excavation 910 CY $ 40.00 $ 36,400.00 0 FORCE MAIN 22 6"DIP Force Main Class 51 18 LF $ 52.00 $ 936.00 23 6" PVC Force Main Sch. 40 (at meter) 20 LF $ 45.00 $ 900.00 24 8" PVC Force Main C900 DR 18 (open cut) 5370 LF $ 30.00 $ 161,100.00 25 8" PVC Force Main C900 DR 18 (directional drilling) 1420 LF $ 21.00 $ 29,820.00 26 8" Gate Valve w/Box and Adaptor II 3 EA $ 1,000.00 $ 3,000.00 27 Force Main Fittings (compact ductile iron) 600 LBS $ 4.50 $ 2,700.00 28 Tracer Wire Terminal Boxes 12 EA $ 110.00 $ 1,320.00 29 Tracer Wire, Open Cut (#12 stranded copper) 5500 LF $ 0.50 $ 2,750.00 30 Tracer Wire, Drilled (#8 stranded SST) 1500 LF $ 0.50 $ 750.00 31 Air Release Structure (wlMH, eir valve, pipe, fittings, ball valve, vent, couplings, e 1 EA $ 9,700.00 $ 9,700.00 32 Connect to MH 3 1 EA $ 500.00 $ 500.00 33 Force Main Rock Excavation 1640 CY $ 40.00 $ 65,600.00 34 Select Force Main Ball Crushed Stone (al proposed streets) 1000 TON $ 12.50 $ 12,500.00 35 Initial Soil Backfill in Rock Trenches 650 CY $ 8.00 $ 5,200.00 PUMPING STATIONS 36 Meter Manhole (incl. meter, stone, pipe support, casting, and manhole) 2 EA $ 11,742.00 $ 23,484.00 37 Pumping Station Rock Excavation 80 CY $ 75.00 $ 6,000.00 38 Finish Grading Pump Station Site 2 EA $ 2,000.00 $ 4,000.00 39 Crushed Stone Base (under PCC) 60 TON $ 15.00 $ 900.00 40 6" PCC Driveway 110 SY $ 45.00 $ 4,950.00 41 4" PCC Sidewalk 34 SY $ 40.00 $ 1,360.00 42 6" Crushed Stone Surfacing 90 TON $ 17.00 $ 1,530.00 43 6 Ft. Chain Link Fence 300 LF $ 18.00 $ 5,400.00 44 16 Ft. Doublegate w/Gate Latch 2 EA $ 880.00 $ 1,760.00 45 Pump Station #1 (incl. wet well, valve vault, building, electrical, gen-set) 1 LS $179,251.00 $ 179,251.00 46 Pump Station #2 (incl. wet well, valve vault, building, electrical, gen-set) 1 LS $218,945.50 $ 218,945.50 47 Transformer Pad 2 EA $ 900.00 $ 1,800.00 48 1" PVC Conduit wlControl Wires 1100 LF $ 7.50 $ 8,250.00 Total $ 902,220.50 % Ov er /Under (-) 19.19%