SRF Green Alley Project_Bid Set 2 - Year 2 Postponement of the AwardTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 2 - Year 2 DATE: August 27, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Sealed bids were received for the SRF Green Alley Bid Set 2 — Year 2 Project. The City received only one bid in the amount of $1,006,608.30 from Drew Cook and Sons Excavating, Inc., which was 33.9% over the original estimate of probable cost. Fehr - Graham, the engineering firm that designed this bid package for the City, originally provided the City with an estimate of $751,989.00, but subsequently revised it's estimate to $967,665.50 after the project was put out for bid. Upon reviewing the one bid received, staff has identified that the proposed concrete pavement prices and modified quantities for other items were the main reasons the bid exceeded the original estimate of probable cost. Additionally, the accelerated completion schedule potentially had an impact on contractor pricing. Staff would like to consult with the City's engineer on the project, Fehr -Graham, and the one bidder, Drew Cook & Sons Excavating, to review the bid submitted and the various scope of work elements to further evaluate the bid. City Engineer Gus Psihoyos recommends the City Council postpone the award of the contract until the September 15, 2014 City Council meeting. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: SRF Green Alley Bid Set 2 — Year 2 DATE: August 25, 2014 INTRODUCTION Dubuque kraZA AI-Amaieaclty 111113, 2007 • 2012 • 2013 The purpose of this memo is to recommend that the City Council postpone the award of the competitive bid proposal for the SRF Green Alley Bid Set 2 — Year 2 Project through the adoption of the enclosed resolution. BACKGROUND Bid Set 2 — Year 2 was to involve the reconstruction of eight (8) alleys in the Bee Branch Watershed. The alley locations are as follows: • AIIey from Loras Blvd. to Fillmore St between Adair Street and North Grandview Avenue • AIIey from Fillmore Street to Decorah Street between Adair Street and North Grandview Avenue • AIIey from Decorah Street to Delaware Street between Adair Street and North Grandview Avenue • AIIey from Custer Street to Loras Blvd. between North Grandview Avenue and Atlantic Street (This alley includes water main that will be replaced) • Alley from Loras Blvd. to Fillmore Street between North Grandview Avenue and Atlantic Street • AIIey from Fillmore Street to Decorah Street between North Grandview Avenue and Atlantic Street • Alley from Decorah Street to Delaware Street between North Grandview Avenue and Atlantic Street • AIIey from Poplar Street to Bunker Hill Road between Asbury Road and Finley Street This project will reconstruct the second bid set of green alleys slated for year 2 in the Bee Branch Watershed. Currently, there are 26 alleys under contract. Of these 26 alleys, 10 alleys are complete and currently being used by the abutting property owners. The remaining 16 alleys are under construction. The reconstruction of the alleys will include: Removal of the existing alley pavement — Excavation of the subgrade to allow the placement of clean washed stone for a storage medium — Installation of a concrete border for the brick pavers — Installation of concrete headers at the alley intersection with the intersecting streets. — Reconstruction of the' pavement surface with interlocking concrete pavers Sanitary Sewer section repair — Installation of a water main in one alley This project will reconstruct the alleys into green alleys. These alleys allow rainwater to infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows for filtering of the water and recharge back into the aquifer. Monitoring wells are also planned to be installed so that water quality improvements can be documented. A water main is proposed in the alley from Custer Street to Loras Boulevard between North Grandview Avenue and Atlantic Street. Currently there are three houses that take service from a long copper service line. This public water main froze this past winter, a new water main will be installed at a greater depth to prevent the freezing in the future. Installing a new water main will improve the service to these properties by providing a water main loop, thus removing the dead end line and minimizing the potential for freezing. The project construction documents will follow the Statewide Urban Design and Specifications (SUDAS) in the development of the construction documents. The Iowa Department of Natural Resources (IDNR) have reviewed and approved the plans so that the City cost can be covered with SRF funds. The Water Department will be funding the water main costs in one of the alleys. There are no private water services being replaced and assessed. This project will have special assessments. BID RESULTS Competitive sealed bids were received for the project on August 21, 2014. The City received only one bid for the project. The bid of $1,006,608.30 was provided by Drew Cook and Sons Excavating, Inc. of Dubuque, Iowa which was 33.9% over the original estimate of probable cost. Fehr -Graham, the Engineering firm that designed this bid package for the City, originally provided the City with an estimate of $751,989.00. Fehr - Graham subsequently revised its estimate after the project was put out for bid. The revised estimate for the project is $967,665.50. A summary of the bid proposals received is as follows: 2 Contractor Name Drew Cook and Sons Excavating, Inc. DISCUSSION Total Bid $1,006,608.30 Upon reviewing the one bid received, staff has identified that the proposed concrete pavement prices and modified quantities for other items were the main reasons the bid exceeded the original estimate of probable cost. Additionally, the accelerated completion schedule potentially had an impact on contractor pricing. I recommend that staff consult with the City's engineer on the project, Fehr -Graham, and the one bidder, Drew Cook & Sons Excavating, to review the bid submitted and the various scope of work elements to further evaluate the bid. RECOMMENDATION I recommend that the City Council postpone the award of the contract for the SRF Green Alley Bid Set 2 — Year 2. This will allow staff to consult with the City's engineer, Fehr -Graham, for its review of the bid submitted and decide if the bid should be rejected or awarded. ACTION TO BE TAKEN I respectfully request the City Council postpone the award of the contract for the SRF Green Alley Bid Set 2 — Year 2 until the September 15, 2014 City Council meeting through the adoption of the attached resolution Prepared by Jon Dienst, Civil Engineer cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Deron Muehring, Civil Engineer Denise Ihrig, Environmental Engineer 3 RESOLUTION NO. 284-14 POSTPONING THE AWARD OF THE CONTRACT FOR THE SRF GREEN ALLEY BID SET 2 — YEAR 2 PROJECT Whereas, competitive sealed bid proposals have been submitted by contractors for the SRF Green Alley Bid Set 2 — Year 2 (the Project) pursuant to Resolution No.. 217-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 25th day of July, 2014; and Whereas, said competitive sealed bid proposals were opened and read on the 21St day of August, 2014; and Whereas, a contract for the Project was scheduled to be awarded at the September 2, 2014, City Council meeting; and Whereas, the City Council deems it advisable to postpone the award of a contract for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The award of a contract for the SRF Green Alley Bid Set 2 — Year 2 Project is postponed to the City Council meeting on September 15, 2014. Passed, approved and adopted this 2nd day of Septembe, 2014. Attest: Trish L. Gleason, Assistant City Clerk Roy D. Buol, Mayor LINE NO. Masterpiece on the Mississippi Project Name: ITEM NUMBER City of Dubuque, Iowa Bid Tabulation SRF ALLEY PROJECT YR 2 - BID SET 2 BID ITEM DESCRIPTION Division 1 - General Provisions 1 1090-105-D Mobilization Division 2010 - Earthwork, Subgrade, and Subbase 2 2010-108-C-0 Clearing and Grubbing C 3 2010-108-0-3 Topsoil, Off-site 4 2010-108-E-0 Excavation, Class 13 5 2010-108-F-0 Below Grade Excavation (Core Out) 6 2010-108-G-0 Subgrade Preparation 7 2010-108-1-0 Subbase, Special Backfill - Gradation 30 8 2010-108-1-0 Subbase, Granular Subbase - Gradation 12a 9 2010-108-1-0 Subbase, Coarse Aggregate Subbase - 3" Breaker 10 2010-108-1-0 Subbase, Porous Aggregate - Gradation 3 (ASTM 57) 11 2010-108-1-0 Subbase, Porous Aggregate - Gradation 13 (ASTM 2) Division 3010 -Trench Excavation and Backfill 12 3010-108-L-0 Rigid Insulation Board Division 4010 -Sanitary Sewers 13 4010-108-E-1 Sanitary Sewer Service Pipe, Trenched, 4" PVC 14 4010-108-E-1 Sanitary Sewer Service Pipe, Trenched, 6" DIP Division 4020 -Ston Sewers 15 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 12" DIP 16 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 15" RCP 17 4020-108-A-1 Storm Sewer Gravity Main, Trenched, 24" RCP 18 4020-108-C-0 Removal of Storm Sewer, Under 36" Dia. 19 4020-108-F-0 Concrete Collar Connection - Type PC -1 Bid Date PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Drew Cook & Sons BID UNIT PRICE TOTAL PRICE 1 LS $ 24,000.00 $ 24,000.00 $ 16,700.00 $ 16,700.00 Sub Total $ 24,000.00 Sub Total $ 16,700.00 1 LS $ 5,000.00 $ 5,000.00 $ 3,700.00 $ 3,700.00 300 CY $ 50.00 $ 15,000.00 $ 55.00 $ 16,500.00 6050 CY $ 12.00 $ 72,600.00 $ 13.50 $ 81,675.00 890 TON $ 15.00 $ 13,350.00 $ 15.00 $ 13,350.00 6620 SY $ 2.00 $ 13,240.00 $ 1.60 $ 10,592.00 50 TON $ 18.00 $ 900.00 $ 18.00 $ 900.00 1040 TON $ 18.00 $ 18,720.00 $ 18.00 $ 18,720.00 890 TON $ 25.00 $ 22,250.00 $ 16.00 $ 14,240.00 2015 TON $ 21.00 $ 42,315.00 $ 21.00 $ 42,315.00 6685 TON $ 28.00 $ 187,180.00 $ 29.00 $ 193,865.00 Sub Total $ 390,555.00 Sub Total $ 395,857.00 256 SF $ 10,00 $ 2,560.00 $ 4.00 $ 1,024.00 Sub Total $ 2,560.00 Sub Total $ 1,024.00 130 LF $ 30 OD $ 3,900.00 $ 88.00 $ 11,440.00 342 LF $ 38.00 $ 12,996.00 $ 27.00 $ 9,234.00 Sub Total $ 16,896.00 Sub Total $ 20,674.00 10 LF $ 45.00 $ 450.00 $ 200.00 $ 2,000.00 108 LF $ 38.00 $ 4,104.00 $ 32.00 $ 3,456.00 76 LF $ 50.00 $ 3,800.00 $ 46.00 $ 3,496.00 194 LF $ 15.00 $ 2,910.00 $ 6.00 $ 1,164.00 4 EA $ 200.00 $ 800.00 $ 400.00 $ 1,600.00 Sub Total $ 12,064.00 Sub Total $ 11,716.00 LINE NO. Project Name: ITEM NUMBER SRF ALLEY PROJECT YR 2 - BID SET 2 BID ITEM DESCRIPTION Division 4040 - Subdrains and Footing Drain Collectors 20 4040-108-A-0 Subdrain, 6" Perforated CPE 21 4040-108-C-0 Groundwater Sampling Port 22 4040-108-D-0 Subdrain Outlets and Connections, Core Drill, 6" Division 4050 - Pipe Rehabilitation 23 4050-108-A-0 Pipe Lining, CIPP, 8" Division 5010 -Pipe and Fittings 24 5010-108-A-1 Water Main, Trenched, DIP, 6" 25 5010-108-C-1 Fittings, Mega lug, 6" 26 5010-108-C-2 Fittings by Weight, DI 27 5010-108-E-0 Water Service Relocation, Copper, 3/4", Inc New Tap Division 5020 - Valves, Fire Hydrants, and Appurtenances Bid Date PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Drew Cook & Sons BID UNIT PRICE TOTAL PRICE 3067 LF $ 12.00 $ 36,804.00 $ 8.00 $ 24,536.00 19 EA $ 600.00 $ 11,400.00 $ 420.00 $ 7,980.00 9 EA $ 450.00 $ 4,050.00 $ 300.00 $ 2,700.00 Sub Total $ 52,254.00 Sub Total $ 35,216.00 176 LF $ 40.00 $ 7,040.00 $ 90.00 $ 15,840.00 Sub Total $ 7,040.00 Sub Total $ 15,840.00 596 LF $ 38.00 $ 22,648.00 $ 25.00 $ 14,900.00 20 EA $ 100.00 $ 2,000.00 $ 55.00 $ 1,100.00 251 LBS $ 6.00 $ 1,506.00 $ 6.00 $ 1,506.00 73 LF $ 120.00 $ 8,760.00 $ 140.00 $ 10,220.00 Sub Total $ 34,914.00 Sub Total $ 27,726.00 28 5020-108-A-0 Valve, Gate, DIP, 6" 15 EA $ 700.00 $ 10,500.00 $ 1,050.00 $ 15,750.00 29 5020-108-C-0 Fire Hydrant Assembly 1 EA $ 4,000.00 $ 4,000.00 $ 2,700.00 $ 2,700.00 Sub Total $ 14,500.00 Sub Total $ 18,450.00 Division 6010 - Structures for Sanitary and Storm Sewers 30 6010-108-B-0 Intake Type, CIP, SW -501 31 6010-108-E-0 Manhole Adjustment, Minor 32 6010-108-E-0 Intake Adjustment, Minor 33 6010-108-G-0 Connection to Existing Intake 34 6010-108-1-1-0 Remove Intake Division 7010 -Portland Cement Concrete Pavement 35 7010-108-A-0 Pavement, PCC, 7" (Thickness) 36 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) Division 7030 -Sidewalks, Shared Use Paths, and Driveways 37 7030-108-E-0 Sidewalk, PCC, 4" (Thickness) 38 7030-108-E-0 Sidewalk, PCC, 6" (Thickness) 39 7030-108-G-0 Detectable Warning 40 7030-108-H-1 Driveway, Paved, PCC, 6" (Thickness) 41 7030-108-1-1-2 Driveway, Granular Division 7040 - Pavement Rehabilitation 42 7040-108-A-0 Full Depth Patches HMA 43 7040-108-H-0 Removal - Pavement 11.02 VF $ 450.00 $ 4,959.00 $ 510.00 $ 5,620.20 2 EA $ 400.00 $ 800.00 $ 640.00 $ 1,280.00 4 EA $ 400.00 $ 1,600.00 $ 550.00 $ 2,200.00 2 EA $ 500.00 $ 1,000.00 $ 650.00 $ 1,300.00 2 EA $ 500.00 $ 1,000.00 $ 350.00 $ 700.00 Sub Total $ 9,359.00 Sub Total $ 11,100.20 1769 SY $ 48.00 $ 84,912.00 $ 85.00 $ 150,365.00 1,205 LF $ 25.00 $ 30,125.00 $ 35.00 $ 42,175.00 Sub Total $ 115,037.00 Sub Total $ 192,540.00 56 SY $ 42.00 $ 2,352.00 $ 50.00 $ 2,800.00 67 SY $ 45.00 $ 3,015.00 $ 63.00 $ 4,221.00 100 SF $ 35.00 $ 3,500.00 $ 40.00 $ 4,000.00 409 SY $ 42.00 $ 17,178.00 $ 75.00 $ 30,675.00 70 TON $ 25.00 $ 1,750.00 $ 18.00 $ 1,260.00 Sub Total $ 27,795.00 Sub Total $ 42,956.00 808 SY $ 85.00 $ 68,680.00 $ 50.00 $ 40,400.00 2754 SY $ 6.00 $ 16,524.00 $ 6.00 $ 16,524.00 LINE NO. Project Name: ITEM NUMBER SRF ALLEY PROJECT YR 2 - BID SET 2 BID ITEM DESCRIPTION Division 7080 -Permeable Concrete Block Pavers 44 7080-108-A-0 Brick Pavement, Permeable, Type 1 45 7080-108-A-0 Brick Pavement, Permeable, Type 2 46 7080-108-C-1 Waterproofing, Surface Leveling 47 7080-108-D-1 Waterproofing, Sealer 48 7080-108-E-1 Geotextile Fabric IDOT Division 2528 -Traffic Control 49 IDOT 2528.04-A Traffic Control Phase I 50 IDOT 2528.04-A Traffic Control Phase II 51 IDOT 2528.04-A Traffic Control Phase III 52 IDOT 2528.04-A Traffic Control Phase IV Division 9020 -Sodding 53 9020-108-A-0 Sod Division 9040 -Erosion and Sediment Control 54 9040-108-A-2 SWPPP Management 55 9040-108-A-3 SWPPP Qualifying Rainfall Event Inspection 56 9040-108-D-1 Filter Socks, 8" 57 9040-108-D-2 Filter Socks, Removal 58 9040-108-P-1 Dust Control, Water Bid Date PLAN QUANTITY UNIT Engineer's Estimate ESTIMATED UNIT PRICE Sub Total TOTAL PRICE $ 85,204.00 Drew Cook & Sons BID UNIT PRICE Sub Total TOTAL PRICE $ 56,924.00 14936 SF $ 5.50 $ 82,148.00 $ 4.10 $ 61,237.60 3890 SF $ 8.00 $ 31,120.00 $ 9.75 $ 37,927.50 84 SF $ 2.00 $ 168.00 $ 5.00 $ 420.00 84 SF $ 1.00 $ 84.00 $ 5.00 $ 420.00 8400 SY $ 3.00 $ 25,200.00 $ 1.70 $ 14,280.00 Sub Total $ 138,720.00 Sub Total $ 114,285.10 1 LS $ 1,250.00 $ 1,250.00 $ 1,900.00 $ 1,900.00 1 LS $ 1,250.00 $ 1,250.00 $ 1,750.00 $ 1,750.00 1 LS $ 1,250.00 $ 1,250.00 $ 2,850.00 $ 2,850.00 1 LS $ 1,250.00 $ 1,250.00 $ 3,200.00 $ 3,200.00 Sub Total $ 5,000.00 Sub Total $ 9,700.00 178 SQ $ 85.00 $ 15,130.00 $ 150.00 $ 26,700.00 Sub Total $ 15,130.00 Sub Total $ 26,700.00 1 LS $ 1,000.00 $ 1,000.00 $ 750.00 $ 750.00 20 EA $ 400.00 $ 8,000.00 $ 35.00 $ 700.00 925 LF $ 5.00 $ 4,625.00 $ 6.00 $ 5,550.00 925 LF $ 2.50 $ 2,312.50 $ 2.00 $ 1,850.00 35 MGAL $ 20.00 $ 700.00 $ 10.00 $ 350.00 Sub Total $ 16,637.50 Sub Total $ 9,200.00 Total Est. $ 967,665.50 Total Bid $ 1,006,608.30 %Over1 Under (-) 4.02%