Loading...
Crescent Health Center Parking LotTHE CITY OF ~.. DUB ~ E Masterpiece cm the Mississippi MEMORANDUM May 29, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Crescent Community Health Center Parking Lot Project CIP 1021848: Community Health Center City Engineer Gus Psihoyos is recommending acceptance of the Crescent Community Health Center Parking Lot Project, as completed by Portzen Construction, Inc., in the final contract amount of $127,552.28, which is a 26.4% increase from the original contract in the amount of $100,937.00. This increase is attributed mainly to stabilization required of the subsoils below the parking lot. It is further recommended that the City Council authorize the payment of $127,552.28 to Portzen Construction, Inc. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on t1~Ie Mississippi MEMORANDUM May 25, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer - ` SUBJECT: Crescent Community Health Center Parking Lot Project CIP 1021848: Community Health Center INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract and authorization of contractor payment for the Crescent Community Health Center (CCHC) Parking Lot Project. BACKGROUND The Crescent Community Health Center (CCHC) Parking Lot Project located in the southwest corner of 18th Street and Elm Street involved reconstruction of the existing parking lot adjacent to CCHC. Phase I of this project involved a parking lot of 30 parking stalls. The project included: the removal of the existing asphalt surface; installation of new curb and gutter; installation of sidewalks around the perimeter of the parking lot; installation of sidewalks directly adjacent to the building serving the parking lot; conduit installation for future security gate installation; installation of storm sewer; installation of pavement; lot striping; and the installation of light bases. The developer, Pine Box, LLC, has completed the remaining parking areas as required on the approved site plan. DISCUSSION The Crescent Community Health Center (CCHC) Parking Lot Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $127,552.28, which is a 26.4% increase from the original contract in the amount of $100, 937.00. This increase over the contract price is attributed mainly to stabilization required of the subsoils below the parking lot. When the original parking lot surface was excavated, it was discovered that the soils were extremely wet and unsuitable. RECOMMENDATION I recommend that the City Council accept the Crescent Community Health Center Parking Lot Project and authorize the payment of $127,552.28 to Portzen Construction, Inc. BUDGET IMPACT The project cost summary for the Crescent Community Health Center Parking Lot Project is as follows: Bid Award Final Construction Contract with Alternate 1 (Concrete Paving) Contingency Construction Engineering & Inspection Total Project Cost $100,937.00 $127,552.28 8,160.25 0 13,464.41 23,091.66 $122,561.66 $150,643.94 The project funding summary is as follows: CIP No. Fund Description Fund Amount 1021848 Community Health Center Total Project Funding ACTION TO BE TAKEN $150,643.94 $150,643.94 The City Council is requested to adopt the attached resolution accepting the Crescent Community Health Center Parking Lot Project and authorizing the payment of $127,552.28 to Portzen Construction, Inc. Prepared by Jon Dienst, PE cc: Cindy Steinhauser, Assistant City Manager Barry Lindahl, City Attorney Jenny Larson, Budget Director Mary Rose Corrigan, Public Health Specialist David Harris, Housing & Community Development Director Bob Schiesl, PE, Assistant City Engineer RESOLUTION NO. 310-07 ACCEPTING THE CRESCENT COMMUNITY HEALTH CENTER PARKING LOT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Crescent Community Health Center Parking Lot Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Community Health Center appropriation for the contract amount of $127,552.28 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of June, 2007 Roy Buol, Mayor Att t: Jeanne F. Schneider, CMC, City Clerk June 007. ~I ~ Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CRESCENT COMMUNITY HEALTH CENTER PARKING LOT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Crescent Community Health Parking Lot Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $127,552.58. Dated this 29th Day of May, 2007 Gus Psihoyos City Engineer Filed in the office of the City Clerk on the 29th day of May, 2007 ~/~ Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Crescent Community Health Center Parking Lot CONTRACTOR: Portzen Construction, Inc. DATE: May 25, 2007 CONTRACT AMOUNT: 5100,937.00 BID ITEM DESCRIPTION UNIT UNIT COST OUANTITY AMOUNT EARNED TO DATE TO DATE 1 Excavation, Unclassified CY $ 7.00 1782.0 $ 12,474.00 2 Backfill, Topsoil SY $ 3.50 345.0 $ 1,207.50 3 Graded Stone Base Ton $ 12.50 940.4 $ 11,755.13 4 3" Crushed Stone Base Ton $ 11.50 954.0 $ 10,971.00 5 Remove Existing Sign Foundation Each $ 1,200.00 1.0 $ 1,200.00 6 HMA 300k Binder Course, 1/2" (PG 64-22) Ton $ 57.00 $ - 7 HMA 300k Surface Course, 1/2" (PG 64-22) Ton $ 57.00 $ - 8 PC Concrete Sidewalk -Thickened Edge, 4", Construct SF $ 5.00 751.9 $ 3,759.50 9 PC Concrete Sidewalk, 4", Remove and Construct SF $ 4.00 1458.5 $ 5,834.00 10 PC Concrete Sidewalk, 6", Remove and Construct SF $ 4.50 303.9 $ 1,367.55 11 PC Concrete Access Ramp, Detectable SF $ 10.00 99.50 $ 995.00 12 PC Concrete Curb & Gutter, 2.5', Construct LF $ 12.00 311.00 $ 3,732.00 13 PC Concrete Driveway, 6", Remove and Construct SY $ 39.00 34.2 $ 1,333.80 14 Remove & Replacement of PC Curb & Gutter LF $ 25.00 174.6 $ 4,365.00 15 HMA Sawcut LF $ 2.50 299.6 $ 749.00 16 15" RCP Storm Pipe LF $ 44.00 16.0 $ 704.00 17 18" RCP Storm Pipe LF $ 42.50 64.0 $ 2,720.00 18 Storm Sewer, Intake 101-B, Complete LS $ 1,850.00 1.0 $ 1,850.00 19 Manhole 48" Diameter, Complete LS $ 2,500.00 1.0 $ 2,500.00 20 Storm Water Curb Opening Neenah R-3262-3 Each $ 125.00 $ - 21 Trench Grate, Neenah W/R 4990, Type D Cover Each $ 1,800.00 $ - 22 8" PVC Pipe LF $ 22.00 113.0 $ 2,486.00 23 12" PVC Pipe LF $ 29.00 194.0 $ 5,626.00 24 Sod SY $ 8.00 115.0 $ 920.00 25 Pavement Markings - Text/Symbols Each $ 30.00 2.0 $ 60.00 26 Pavement Markings -Linear LF $ 0.30 645.0 $ 193.50 27 Light Bases, Complete Each $ 700.00 2.0 $ 1,400.00 28 2" PVC Conduit LF $ 6.00 442.0 $ 2,652.00 29 1-1/2" PVC Conduit LF $ 5.00 499.3 $ 2,496.50 30 4" PVC Conduit LF $ 8.00 270.4 $ 2,163.20 31 Mobilization LS $ 5,000.00 1.0 $ 5,000.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: S 90,514.68 .~, e~f'~ideli~ate' s~~s= E1 PC Concrete Pavement, (7"), Class "C" SY $ 26.00 1345.6 $ 34,985.60 TOTAL AMOUNT EARNED TO DATE -ALTERNATE BID -DEDUCT: $ 34,985.60 C1 3" PVC Conduit LF $ 7.00 111.0 $ 777.00 C2 Water box adjustment Each $ 125.00 3.0 $ 375.00 C3 Storm Sewer Intake Top Adjustment Each $ 450.00 2.0 $ 900.00 $ - TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: ~~ 2,052.00 TOTAL AMOUNT EARNED TO DATE: S 127,552.28 TOTAL DUE CONTRACTOR: S 127,552.28 ENGINEERING: 523,091.66 TOTAL CONSTRUCTION COST: 5150,643.94 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van ~ Manager City of Du ue, Iowa -!/~ APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: TITLE: DATE: 5 -" 7 ~( •- D