Loras Blvd Signalization Project AcceptTHE CITY OF ~LJBI ~E Masterpiece cm the Mississippi MEMORANDUM May 29, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Loras Boulevard Traffic Signalization Replacement Project (CIP 1011133 -Traffic Signal Mastarm Retrofit) City Engineer Gus Psihoyos is recommending acceptance of the Loras Boulevard Traffic Signalization Replacement Project, as completed by Portzen Construction, Inc., in the final contract amount of $289,081.02. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~~ ~~~~Z Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos; City Engineer THE CITY OF DuB E MEMORANDUM ~-~~ May 29, 2007 TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer _ - SUBJECT: Loras Boulevard Traffic Signalization Replacement Project (CIP 1011133 -Traffic Signal Mastarm Retrofit INTRODUCTION The enclosed resolution provides for the acceptance of the contract for the Loras Boulevard Traffic Signalization Replacement Project. BACKGROUND This project provides for the standardization of mastarm-mounted signals along the Loras corridor: Bluff and 14th Streets, Locust and 14th Streets, Main and 14th Streets, and Iowa and 14th Streets. The project included pre-emption capabilities and battery backup systems. The project has been expanded from its original scope to include sidewalk ramp improvements, a fiber optic conduit inner-connect between the signals and some additional roadway pavement improvements near the intersections. New traffic controller equipment and mast-arms were purchased by the City for the project to eliminate the long lead time in ordering. DISCUSSION The Loras Boulevard Traffic Signalization Replacement Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $289,081.02 RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $289,081.02 BUDGET IMPACT The project cost summary for the Loras Boulevard Traffic Signalization Replacement Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP Fund Description Bid Award Final $282,680.25 $289,081.02 28,268.03 0 46,642.24 26,441.58 $ 357,590.52 $315,522.60 Fund Amount 1001133 Traffic Signal Mastarm Retrofit $214,551.57 2501615 Traffic Signal Intersection Reconstruction $ 27,048.04 3001266 Traffic Signal Interconnect Conduit Replacement $ 39,633.65 1021608 Downtown Streetlight Replacement Schedule $ 10,483.26 3001041 Curb/Catch Basin Replacement $ 11,045.65 350-1425 City of Dubuque Sidewalk Program $ 10,150.65 720-1008 Storm General $ 2,609.78 Total Project Funding $ 315,522.60 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost for the Loras Boulevard Traffic Signalization Replacement Project. Prepared by David Ness, PE cc: Dawn Lang, Budget Director Bob Schiesl, PE, Assistant City Engineer Chris Kohlmann, Information Services Laura Carstens, Planning Services Manager David Johnson, Assistant Planner David Ness, PE RESOLUTION NO. 311-07 ACCEPTING THE LORAS BOULEVARD TRAFFIC SIGNALIZATION REPLACEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Loras Boulevard Traffic Signalization Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Traffic Signal Mastarm Retrofit Funds, Traffic Signal Intersection Reconstruction Funds, Traffic Signal Interconnect Conduit Replacement Funds, Downtown Streetlight Replacement Schedule Funds, Curb/Catch Basin Replacement Funds, Storm General Funds and City of Dubuque Sidewalk Program Capital Improvement Project Funds appropriation for the contract amount of $289,081.02 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of June 2007. ~~ Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LORAS BOULEVARD TRAFFIC SIGNALIZATION REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Loras Boulevard Traffic Signalization Replacement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $315,522.60 Dated this 29th day of May, 2007. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the 29th day of May 2007 Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: Loras Boulevard Traffic Signal Mastarm Retrofit Project 100-1133 DATE: May 25, 2007 CONTRACTOR: POrtZen Construction, Inc. BID ITEM DESCRIPTION UNIT UNIT COST QUANTITY AMOUNT EARNED TO DATE TO DATE 1 3/4" Graded Stone Base Ton $ 15.00 323.86 $ 4,857.90 ~ ~ ..~ .;"+ . 2 PC Concrete Pavement, (8") w/ Integeral Curb, Class "C" w/ CD Baskets SY $ 48.00 413.21 $ 19,834.08 3 Remove and Replacement of PC Curb & Gutter LF $ 30.00 14.3 $ 429.00 4 PC Concrete Curb Ramp, 6" SF $ 6.00 1743.25 $ 10,459.50 5 PC Concrete Access Ramp, Detectable Warning Each $ 200.00 16 $ 3,200.00 6 PC Concrete Sidewalk, 4", Remove and Construct SF $ 5.25 1948.66 $ 10,230.47 7 Sawcut Concrete LF $ 4.00 334.3 $ 1,337.20 8 HMA Full Depth Repair Patches Ton $ 110.00 2.2 $ 242.00 9 HMA Sawcut LF $ 3.50 88.8 $ 310.80 ,fir ... I ~M SC~I:L~ ,., ;.r ~ ... r ~ ;?' f,rr R ~, ,:„i~ 1, f~~~L?<~~~+ .. _ ,,. . V _ . . 10 , Backfill Topsoil SY $ 38.00 84 $ 3,192.00 11 Sodding SY $ 10.00 167 $ 1,670.00 12 Traffic and Safety Control LS $ 5,000.00 1 $ 5,000.00 13 Mobilization LS $ 12,000.00 1 $ 12,000.00 14 Tree Preservation Measures LS $ 1,000.00 1 $ 1,000.00 .>~, . r ., ~ d~~'F ~, ~' -.. ~ '_ t `t r 15 4"HDPE Trenched (with 4-1"HDPE inside) LF $ 15.00 395 $ 5,925.00 16 4" HDPE Bored (with 4-1" HDPE inside) LF $ 30.00 650 $ 19,500.00 17 2" HDPE Bored LF $ 20.00 1404 $ 28,080.00 18 36" Fiber Optics Junction Vault, Precast Concrete EA $ 3,000.00 6 $ 18,000.00 _ 7 .,~Y~ ~~ '~M~~{~~,, ,'l~l'iW Y rf 4~'~ 2i ,. Lrw livw,'~t'w~[ alk~,~r~i~. ~ T~ t ,~,I~u J~1R~ 3 1~ 19 Traffic Signal -Iowa Street, Equipment Installation LS $ 29,000.00 1 $ 29,000.00 20 Traffic Signal -Main Street, Equipment Installation LS $ 28,000.00 1 $ 28,000.00 21 Traffic Signals -Locust Street, Equipment Installation LS $ 28,000.00 1 $ 28,000.00 22 Traffic Signals -Bluff Street, Equipment Installation. LS $ 27,000.00 1 $ 27,000.00 23 12"x12"x18" Synertech Hand Hole EA $ 1,000.00 6 $ 6,000.00 24 17"x30"x18" Synertech Hand Hole EA $ 1,000.00 4 $ 4,000.00 25 4" HDPE Bored LF $ 26.00 365 $ 9,490.00 26 4" HDPE Trenched LF $ 15.00 331 $ 4,965.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 281,722.95 J n~} ~ ~}yf ~~l~/'l~ ~.7`~ K ~e~~y 4 y~~~~~~~ ~y~~ r''~. ~'N '~,i Yr'.. ~ .. .¢T"i+'+C ~'~ ~ I~. ~l ~l~;p~. 1 l ~ ~~'~~ `, a _u~~ki~ ~'~~, ~i. E1 Iowa Street Storm Sewer Work on 10-13-2006 Each $1,769.57 1 $1,769.57 E2 Iowa Street Fiber Relocation Work010-16-2006 Each $923.50 1 5923.50 E3 Main Street Fiber Relocation Work 10-16-2006 Each $522.50 1 $522.50 E4 Addition Rebar along Iowa Street 10-18-2006 Each $186.00 1 5186.00 E5 Tree Stump Removal at Main Street Each $419.50 1 5419.50 E6 Concrete Curb around Building at Bluff and Loras Each $915.50 1 $915.50 E7 PVC Pipe Repair and Intake Repair at Iowa Each $621.50 1 5621.50 E8 Thicker Pavement Removal at Main and Locust Intersections Each $2,000.00 1 52,000.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: S 7,358.07 TOTAL AMOUNT EARNED TO DATE: S 289,081.02 TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY $ 289,081.02 $ 26,441.58 S 315,522.60 1 hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, anager City of Du e I w APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Portzen Co truction Inc. BY: TITLE: DATE: 5" Z `~- "O7