Loading...
US 52 Storm Sewer AwardTHE CITY OF DUB E MasterpiEee on the Mississippi MEMORANDUM June 8, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: US52 North Storm Sewer Improvement Project (CIP#7201810 &CIP#1001122) Sealed bids were received for the US52 North Storm Sewer Improvement Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, McClain Excavating Co., Inc., in the amount of $189,712, which is 21.98% under the engineer's estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval Mic aet C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM June 8, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: US52 North Storm Sewer Improvement Project (CIP#7201810 &CIP#1001122) INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the US52 North Storm Sewer Improvement Project. BACKGROUND On May 7, 2007, the City Council authorized the City Clerk to advertise for bids for the US52 North Storm Sewer Improvement Project. The project consists of replacing a 24-inch diameter storm sewer with a 48-inch diameter storm sewer from the Flexsteel Pumping Station to US52 and replacing the two catch basins located at the low spot (sump) in US52 north of Olympic Heights and south of the Shooting Club drive. With jurisdiction over US52, the IDOT also has an interest in adequate stormwater drainage of the highway. As a result, IDOT has indicated that the project is eligible for minor IDOT cost sharing. DISCUSSION Sealed bids were opened on May 31, 2007. McClain Excavating Company, Inc. of Peosta, Iowa, submitted the low bid in the amount of $189,712.00. This amount is 21.98% under the engineer's estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Total Bid McClain Excavating Co. Inc $189,712.00 Drew Cook & Sons Exc. $194,081.55 Arensdorf Excavating $213,538.00 W.C. Stewart Construction $220,593.22 Connolly Construction. Inc. $227,474.08 Portzen Construction $227,635.55 Tschiggfrie Excavating Co. $237,030.75 RECOMMENDATION I recommend that the contract be awarded to McClain Excavating Company in the amount of $189,712.00. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the US52 North Storm Sewer Improvement Project is summarized as follows: Construction Contract Cost Estimate Award $243,144.00 $189,712.00 Contingency Engineering ROW/Easement 24,314.00 24,314.00 40,119.00 40,119.00 3,072.00 3,072.00 $310,649.00 $257,217.00 According to the guidelines provided by the Iowa DOT, $40,838.19 in project costs are eligible for Iowa DOT cost sharing as part of an interagency agreement. Therefore, the project will be funded as follows: CIP CIP Name Amount 1001122 Jackson & Aquin Drainage $165,560.00 7201810 IDOT Cost Share $ 40,838.19 7201810 US52 Storm Sewer $ 50,818.81 The remaining balance of US 52 Storm Sewer will be reserved for addition storm sewer improvements to be done in conjunction with the Iowa DOT resurfacing of US52 North. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the US52 North Storm Sewer Improvement Project to McClain Excavating Company in the amount of $189,712.00 and that the City Council authorize the City Manager to enter into an agreement with the Iowa DOT that reflects the estimated cost share outlined above. Prepared by Deron Muehring, Civil Engineer II cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II Resolution No. 342-07 RESOLUTION NO. 342-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT Whereas, sealed proposals have been submitted by contractors for the US52 North Storm Sewer Improvement Project (the Project) pursuant to Resolution No.~(~7 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 11 ~' day of May, 2007. Whereas, said sealed proposals were opened and read on the 31st day of May, 2007 and it has been determined that McClain Excavating Company, Inc of Peosta, Iowa, with a bid in the amount of $189,712.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, .IOWA: That a Public Improvement Contract for the Project is hereby awarded to McClain Excavating Company, Inc and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 1 s t n day of Jun e Attest: ~~ eanne F. Schneider, CMC, City Clerk 2007. Roy D. Buol, Mayor US52 NORTH STORM SEWER IMPROVEMENT CIP # : 1001122 8 7201810 BID RESULTS 31-May-07 BIDDER Engineer's Estimate UNIT TOTAL NO. DESCRIPTION QUANTITY PRICE PRICE 1 Clearing 8 Grubbing 25860 SF $0.08 $ 2,068.80 2 Topsoil Strip, Salvage, Stockpile and Spreading 94 CY $6.00 $ 564.00 3 Lime Backfill 2650 Ton $7.00 $ 18,550.00 4 Subbase (Patches) 241 SY $15.00 $ 3,615.00 5 Granular Surfacing 190 Ton $10.00 $ 1,900.00 6 Bedding Stone, 1"Clean 700 Ton $11.00 $ 7,700.00 7 Hot Mix Asphalt (Composite Section) 35 Ton $85.00 $ 2,975.00 8 Patches, Full Depth Finish, By Count 8 Ea $250.00 $ 2,000.00 9 Patches, Full Depth Finish, By Area 224 SY $100.00 $ 22,400.00 10 Plowable Mortar 17 CY $82.00 $ 1,394.00 1 t RCP Storm Sewer 15" 6 LF $27.00 $ 162.00 12 RCP Storm Sewer 18" 6 LF $31.00 $ 186.00 13 RCP Storm Sewer 24" 60 LF $49.00 $ 2,940.00 14 RCP Storm Sewer 36" 6 LF $80.00 $ 480.00 15 RCP Storm Sewer 42" 75 LF $95.00 $ 7,125.00 16 RCP Storm Sewer 48" 923 LF $110.00 $ 101,530.00 17 Storm Sewer, Manhole Type "M-A" 84" 3 Ea $4,100.00 $ 12,300.00 18 Storm Sewer, Manhole Type "M-A" 108" 1 Ea $5,800.00 $ 5,800.00 19 RCP Aprons Storm Sewer 48" 1 Ea $2,000.00 $ 2,000.00 20 Storm Sewer, Intake RA-43 2 Ea $3,400.00 $ 6,800.00 21 Storm Sewer, Intake RA-62 Modified 2 Ea $3,900.00 $ 7,800.00 22 Removal of Intakes 2 Ea $200.00 $ 400.00 23 Removal of Manholes 3 Ea $250.00 $ 750.00 24 Storm Sewer Pipe, 24" HDPE 34 LF $28.00 $ 952.00 25 Seeding, Fertilizing 8 Mulching 2721 SY $0.25 $ 680.25 26 Soil Erosion, Silt fences for ditch checks 90 LF $2.50 $ 225.00 27 Soil Erosion, Silt fence 1050 LF $2.50 $ 2,625.00 28 Stone Revetment Class C (Rip Rap) 50 Ton $18.00 $ 900.00 29 Revetment, Fabric, Engineering 92 SY $2.50 $ 230.00 30 Fence, Remove & Replace Chain link 91 LF $12.00 $ 1,092.00 31 Traffic Control 1 LS $15,000.00 $ 15,000.00 32 Mobilization 1 LS $10,000.00 $ 10 000.00 TOTAL $ 243,144.05 McClain Excavating Co. Inc UNIT TOTAL PRICE PRICE $ 0.10 $ 10.00 $ 6.00 $ 10.00 $ 12.00 $ 10.50 $ 217.00 $ 5.00 $ 65.00 $ 145.00 $ 36.00 $ 37.50 $ 130.00 $ 57.00 $ 58.00 $ 67.50 $5,000.00 $6,960.00 $ 800.00 $2,950.00 $2,570.00 $ 750.00 $ 750.00 $ 40.00 $ 1.00 $ 3.00 $ 1.50 $ 22.00 $ 1.50 $ 1.50 $8,500.00 $5,000.00 TOTAL $ 2,586.00 $ 940.00 $ 15,900.00 $ 2,410.00 $ 2,280.00 $ 7,350.00 $ 7,595.00 $ 40.00 $ 14,560.00 $ 2,465.00 $ 216.00 $ 225.00 $ 7,800.00 $ 342.00 $ 4,350.00 $ 62,302.50 $ 15,000.00 $ 6,960.00 $ 800.00 $ 5,900.00 $ 5,140.00 $ 1,500.00 $ 2,250.00 $ 1,360.00 $ 2,721.00 $ 270.00 $ 1,575.00 $ 1,100.00 $ 138.00 $ 136.50 $ 8,500.00 $ 5 000.00 $ 189,712.00 Over /Under (-) 0% Total -21.98% BIDDER Drew Cook 8 Sons Exc. UNIT TOTAL PRICE PRICE $ 0.10 $ 2,586.00 $ 15.00 $ 1,410.00 $ 5.50 $ 14,575.00 $ 8.00 $ 1,928.00 $ 12.00 $ 2,280.00 $ 13.00 $ 9,100.00 $ 132.00 $ 4,620.00 $ 578.00 $ 4,624.00 $ 46.00 $ 10,304.00 $ 100.00 $ 1,700.00 $ 45.00 $ 270.00 $ 50.00 $ 300.00 $ 50.00 $ 3,000.00 $ 65.00 $ 390.00 $ 59.00 $ 4,425.00 $ 85.00 $ 78,455.00 $ 4,725.00 $ 14,175.00 $ 7,095.00 $ 7,095.00 $ 750.00 $ 750.00 $ 2,280.00 $ 4,560.00 $ 1,920.00 $ 3,840.00 $ 600.00 $ 1,200.00 $ 400.00 $ 1,200.00 $ 25.00 $ 850.00 $ 1.55 $ 4,217.55 $ 5.00 $ 450.00 $ 1.50 $ 1,575.00 $ 15.00 $ 750.00 $ 1.00 $ 92.00 $ 10.00 $ 910.00 $ 8,450.00 $ 8,450.00 $ 4,000.00 $ 4 000.00 TOTAL $ 194,081.55 TOtal -20.18% BIDDER ArensdorF Excavating UNIT TOTAL PRICE PRICE $ 4.00 $ 4.50 $ 14.00 $ 14.00 $ 18.00 $ 150.00 $ 200.00 $ 75.00 $ 190.00 $ 25.00 $ 27.00 $ 36.00 $ 62.00 $ 70.00 $ 74.00 $ 4,450.00 $ 8,500.00 $ 1,500.00 $ 3,500.00 $ 3,000.00 $ 1,500.00 $ 1,500.00 $ 65.00 $ 1.00 $ 5.00 $ 1.00 $ 10.00 $ 3.00 $ 20.00 $ 8,450.00 $18,000.00 $ 376.00 $ 11,925.00 $ 3,374.00 $ 2,660.00 $ 12,600.00 $ 5,250.00 $ 1,600.00 $ 16,800.00 $ 3,230.00 $ 150.00 $ 162.00 $ 2,160.00 $ 372.00 $ 5,250.00 $ 68,302.00 $ 13,350.00 $ 8,500.00 $ 1,500.00 $ 7,000.00 $ 6,000.00 $ 3,000.00 $ 4,500.00 $ 2,210.00 $ 2,721.00 $ 450.00 $ 1,050.00 $ 500.00 $ 276.00 $ 1,820.00 $ 8,450.00 $ 18,000.00 $ 213,538.00 TOTAL Total -12.18% Page 1 of 2 NO. DESCRIPTION Clearing & Grubbing Topsoil Strip, Salvage, Stockpile and Spreading Lime Backfill Subbase (Patches) Granular Surfacing Bedding Stone, 1"Clean Hot Mix Asphalt (Composite Section) Patches, Full Depth Finish, By Count Patches, Full Depth Finish, By Area Plowable Mortar RCP Storm Sewer 15" RCP Storm Sewer 18" RCP Storm Sewer 24" RCP Storm Sewer 36" RCP Storm Sewer 42" RCP Storm Sewer 48" Storm Sewer, Manhole Type "M-A" 84" Storm Sewer, Manhole Type "M-A" 108" RCP Aprons Storm Sewer 48" Storm Sewer, Intake RA-43 Storm Sewer, Intake RA-62 Modified Removal of Intakes Removal of Manholes Storm Sewer Pipe, 24" HDPE Seeding, Fertilizing & Mulching Soil Erosion, Silt fences for ditch checks Soil Erosion, Silt fence Stone Revetment Class C (Rip Rap) Revetment, Fabric, Engineering Fence, Remove & Replace Chain link Traffic Control Mobilization 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 QUANTITY 25860 SF 94 CY 2650 Ton 241 SY 190 Ton 700 Ton 35 Ton 8 Ea 224 SY 17 CY 6 LF 6 LF 60 LF 6 LF 75 LF 923 LF 3 Ea 1 Ea 1 Ea 2 Ea 2 Ea 2 Ea 3 Ea 34 LF 2721 SY 90 LF 1050 LF 50 Ton 92 SY 91 LF 1 LS 1 LS Over /Under (-) US52 NORTH STORM SEWER IMPROVEMENT CIP # : 1001122 8 7201810 BID RESULTS 31-May-07 BIDDER BIDDER W.C. Stewart Construction Connolly Construction. Inc. UNIT TOTAL UNIT TOTAL PRICE PRICE PRICE PRICE $ 0.02 $ 10.00 $ 5.92 $ 10.76 $ 9.76 $ 11.47 $ 131.00 $ 1,016.50 $ 48.00 $ 150.00 $ 25.22 $ 31.76 $ 37.40 $ 66.60 $ 72.18 $ 90.99 $ 5,747.77 $ 7,904.35 $ 1,391.98 $ 2,872.28 $ 1,920.00 $ 500.00 $ 500.00 $ 30.40 $ 0.75 $ 6.43 $ 2.83 $ 21.00 $ 10.88 $ 20.00 $ 8,450.00 $15,000.00 TOTAL Total $ 517.20 $ 940.00 $ 15,688.00 $ 2,593.16 $ 1,854.40 $ 8,029.00 $ 4,585.00 $ 8,132.00 $ 10,752.00 $ 2,550.00 $ 151.32 $ 190.56 $ 2,244.00 $ 399.60 $ 5,413.50 $ 83,983.77 $ 17,243.31 $ 7,904.35 $ 1,391.98 $ 5,744.56 $ 3,840.00 $ 1,000.00 $ 1,500.00 $ 1,033.60 $ 2,040.75 $ 578.70 $ 2,971.50 $ 1,050.00 $ 1,000.96 $ 1,820.00 $ 8,450.00 $ 15,000.00 $ 220,593.22 -9.27% $ 0.46 $ 8.10 $ 9.20 $ 10.80 $ 12.94 $ 14.74 $ 103.40 $ 605.00 $ 74.50 $ 110.97 $ 34.64 $ 38.10 $ 40.80 $ 58.75 $ 58.55 $ 73.00 $ 3,900.00 $ 6,725.00 $ 1,025.00 $ 5,245.00 $ 3,230.00 $ 1,130.00 $ 830.00 $ 47.00 $ 1.80 $ 5.70 $ 1.85 $ 22.50 $ 1.60 $ 18.50 $12,750.00 $ 7,210.00 TOTAL Total $ 11,895.60 $ 761.40 $ 24,380.00 $ 2,602.80 $ 2,458.60 $ 10,318.00 $ 3,619.00 $ 4,840.00 $ 16,688.00 $ 1,886.49 $ 207.84 $ 228.60 $ 2,448.00 $ 352.50 $ 4,391.25 $ 67,379.00 $ 11,700.00 $ 6,725.00 $ 1,025.00 $ 10,490.00 $ 6,460.00 $ 2,260.00 $ 2,490.00 $ 1,598.00 $ 4,897.80 $ 513.00 $ 1,942.50 $ 1,125.00 $ 147.20 $ 1,683.50 $ 12,750.00 $ 7 210.00 $ 227,474.08 -6.44% BIDDER Portzen Construction UNIT TOTAL PRICE PRICE $ 0.15 $ 6.00 $ 6.50 $ 14.00 $ 14.00 $ 13.00 $ 150.00 $ 200.00 $ 85.00 $ 125.00 $ 50.00 $ 55.00 $ 60.00 $ 70.00 $ 75.00 $ 65.00 $ 4,600.00 $ 6,500.00 $ 1,500.00 $ 3,500.00 $ 3,000.00 $ 1,500.00 $ 1,500.00 $ 65.00 $ 1.55 $ 5.00 $ 1.50 $ 25.00 $ 3.00 $ 20.00 $ 8,450.00 $30,000.00 TOTAL Total $ 3,879.00 $ 564.00 $ 17,225.00 $ 3,374.00 $ 2,660.00 $ 9,100.00 $ 5,250.00 $ 1,600.00 $ 19,040.00 $ 2,125.00 $ 300.00 $ 330.00 $ 3,600.00 $ 420.00 $ 5,625.00 $ 59,995.00 $ 13,800.00 $ 6,500.00 $ 1,500.00 $ 7,000.00 $ 6,000.00 $ 3,000.00 $ 4,500.00 $ 2,210.00 $ 4,217.55 $ 450.00 $ 1,575.00 $ 1,250.00 $ 276.00 $ 1,820.00 $ 8,450.00 $ 30 000.00 $ 227,635.55 -6.38% ~r~ Tschiggfrie Excavating Co. UNIT TOTAL PRICE PRICE $ 0.45 $ 14.00 $ 7.70 $ 9.50 $ 12.70 $ 13.75 $ 110.00 $ 300.00 $ 100.00 $ 117.00 $ 32.90 $ 34.65 $ 39.45 $ 56.65 $ 65.60 $ 82.95 $ 4,912.00 $ 9,264.00 $ 2,319.00 $ 3,478.00 $ 3,141.00 $ 575.00 $ 700.00 $ 39.00 $ 1.70 $ 5.50 $ 1.65 $ 26.50 $ 2.50 $ 25.00 $ 9,295.00 $ 10,000.00 TOTAL $ 11,637.00 $ 1,316.00 $ 20,405.00 $ 2,289.50 $ 2,413.00 $ 9,625.00 $ 3,850.00 $ 2,400.00 $ 22,400.00 $ 1,989.00 $ 197.40 $ 207.90 $ 2,367.00 $ 339.90 $ 4,920.00 $ 76,562.85 $ 14,736.00 $ 9,264.00 $ 2,319.00 $ 6,956.00 $ 6,282.00 $ 1,150.00 $ 2,100.00 $ 1,326.00 $ 4,625.70 $ 495.00 $ 1,732.50 $ 1,325.00 $ 230.00 $ 2,275.00 $ 9,295.00 $ 10,000.00 $ 237,030.75 Total -2.51 Page 2 of 2