2014 Access Ramp Installation Project Phase 3 AwardTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2014 Access Ramp Installation Project - Phase 3 DATE: September 8, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Through the competitive quotation process for public improvements, the 2014 Access Ramp Installation Project -Phase 3 was awarded on August 25, 2014, to Midwest Concrete, Inc., in the amount of $54,415. City Engineer Gus Psihoyos recommends that the award for the 2014 Access Ramp Installation Project -Phase 3 be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. 7- Mic ael C. Van Milligen 1,,i1144 .., MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dui Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 3, 2013 SUBJECT: 2014 Access Ramp Installation Project — Phase 3 Dubuque kraal AA-Americaetty 11111 20117 • 2012 21114 The 2014 Access Ramp Installation Project — Phase 3 includes reconstruction of access curb ramps in conjunction with City of Dubuque Public Works Department asphalt overlay program. The following is a summary of the bids received: Midwest Concrete, Inc. $54,415.00 Through the competitive quotation process for public improvements, this project was awarded on August 25, 2014 to Midwest Concrete, Inc. of Peosta, Iowa, in the amount of $54,415.00. In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 2014 Access Ramp Installation Project — Phase 3 to be officially recorded in the minutes of the City Council. cc: Jon Dienst, PE Tom Kopp, Engineering Tech LINE NO. THECrTY OF DUB Masterpiece an the Mississippi City of Dubuque, Iowa Bid Tabulation Project Name: CITY OF DUBUQUE ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PHASE THREE ITEM NUMBER BID ITEM DESCRIPTION Division 1 - General Provisions 1090.105-D Mobilization Division 2010 - Earthwork, Subgrade, and Subbase 2 2010-108-A-0 Clearing and Grubbing A Bid Date 25 -Aug -14 PLAN QUANTITY UNIT 3 2010-108-D-3 Topsoil, Off-site 4 2010-100-1-0 Subbase, Granular Subbase - Gradation 12a Division 6010 - Structures for Sanitary and Storm Sewers 5 6010-108-E-0 Manhole Adjustment, Minor Engineer's Estimate ESTIMATED UNIT PRICE TOTAL PRICE Midwest Concrete BID UNIT PRICE TOTAL PRICE LS $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 Sub Total $ 2,000.00 Sub Total $ 2,000.00 5 UNIT $ 50.00 $ 250.00 $ 50.00 $ 250.00 12 CY $ 25.00 $ 300.00 $ 25.00 $ 300.00 75 TON $ 23.00 $ 1,725.00 $ 23.00 $ 1,725.00 Sub Total $ 2,275.00 Sub Total $ 2,275.00 6 8010-108-G-0 Connection to Existing Manhole 7 8010-108-0-0 Intake Type, CIP, SW -501 8 6010-108-H-0 Remove Intake Division 7010 - Portland Cement Concrete Pavement 1 EA $ 300.00 $ 300.00 $ 300.00 $ 300.00 1 EA $ 300.00 $ 300.00 $ 500.00 $ 500.00 5 VF $ 200.00 $ 1,000.00 $ 200.00 $ 1,000.00 1 EA $ 500.00 $ 500.00 $ 500.00 $ 500.00 Sub Total $ 2,100.00 Sub Total $ 2,300.00 9 7010.108-A-0 Pavement, PCC, 8" (Thickness) 20 SY $ 60,00 $ 1,200.00 $ 60.00 $ 1,200.00 10 7010-108-E-0 Curb and Gutter, 30" (Width), 6" (Thickness) 480 LF $ 28.00 $ 13,440.00 $ 25.00 $ 12,000.00 11 7010-108-E-0 Curb and Gutter, 30" (Width), 8" (Thickness) 20 LF $ 25.00 $ 500.00 $ 28.00 $ 560.00 12 7010-108-F-0 Beam Curb 50 LF $ 35.00 $ 1,750.00 $ 18.00 $ 900.00 Sub Total $ 16,890.00 Sub Total $ 14,660.00 Division 7030 - Sidewalks, Shared Use Paths, and Driveways 13 7030-108-A-0 Removal of Sidewalk 265 SY $ 22.00 $ 5,830.00 $ 22.00 $ 5,830.00 14 7030-108-A-0 Removal of Driveway 20 SY $ 22.00 $ 440.00 $ 22.00 $ 440.00 15 7030-108-8-0 Removal of Curb 480 LF $ 8.50 $ 4,080.00 $ 8.00 $ 3,840.00 16 7030.108-6-0 Sidewalk, PCC, 4" (Thickness) zoo SY $ 40.00 $ 8,000.00 $ 40.00 $ 8,000.00 17 7030-108-E-0 Sidewalk, PCC, 6" (Thickness) 65 SY $ 60.00 $ 3,900.00 $ 60.00 $ 3,900.00 18 7030-108-G-0 Detectable Warning 168 SF $ 25.00 $ 4,200.00 $ 25.00 $ 4,200.00 19 7030-108-1-1-1 Driveway, Paved, HMA, 6" (Thickness) 20 7040.108-H-0 Division 7040 - Pavement Rehabilitation Removal - Pavement IDOT Division 2528 - Traffic Control 5 SY $ 35.00 $ 175.00 $ 25.00 $ 125.00 Sub Total $ 26,625.00 Sub Total $ 26,335.00 100 SY $ 22.00 $ 2,200.00 $ 22.00 $ 2,200.00 Sub Total $ 2,200.00 Sub Total $ 2,200.00 21 IDOT2528.04-A Traffic Control 1 LS $ 1,400.00 $ 1,400.00 $ 2,500.00 $ 2,500.00 Sub Total $ 1,400.00 Sub Total $ 2,500.00 Division 8040 - Signing Materials 22 Existing Sign, Remove and Reinstall Division 9010 - Seeding 23 0010-108-A-0 Conventional - Seeding, Fertilizing, and Mulching, Type 1 3 $ 75.00 $ 225.00 $ 50.00 $ 150.00 Sub Total $ 225.00 Sub Total $ 150.00 0.05 AC $ 10,000.00 $ 500.00 $ 20,000.00 $ 1,000.00 24 9010.108-B-0 Hydraulic - Seeding, Fertilizing, and Mulching, Type 1 Division 9020 - Sodding Division 9040 - Erosion and Sediment Control 25 9040-108-D-1 Fiker Socks, 8" 26 9040-108-T-2 Inlet Protection Device, Maintenance 27 9040-108-0-2 Filter Socks, Removal Division 9080 - Concrete Steps, Handrails, and Safety Rail 28 9080-108-A-0 Concrete Steps, Type A 0 AC $ 20,000.00 $ 1,000.00 $ 12,500.00 $ 625.00 Sub Total $ 1,500.00 Sub Total $ 1,625.00 Sub Total $ Sub Total $ eo LF $ 3.00 $ 180.00 $ 3.00 $ 180.00 10 EA $ 5.00 $ 50.00 $ 5.00 $ 50.00 60 LF $ 1.00 $ 60.00 $ 1.00 $ 60.00 Sub Total $ 290.00 Sub Total $ 290.00 8 5F $ 7.00 $ 56.00 $ 10.00 Sub Total $ 56.00 Sub Total % Over 1 Under (-) 80.00 Sub Total $ Sub Total $ 80.00 Sub Total $ Sub Total $ Total Est. $ 55,561.00 Total Bid $ 54,415.00 -2.06% Total Bid Amount $ 55,561.00 $ 54,415.00 Total Selected Alternate(s) Amount $ - $ - Contract Award Amount: $ 55,561.00 $ 54,415.00