Loading...
Upper Bee Branch Creek_429 Stabilization Project_InitiateTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque band AI -America City r 2007 • 2012 • 2013 SUBJECT: Upper Bee Branch Creek Restoration Project, Property Acquisition, 429 Rhomberg Stabilization Project (CIP #3401654) DATE: September 9, 2014 City Engineer Gus Psihoyos recommends initiation of the bidding process for the 429 Rhomberg Stabilization Project, and further recommends that a public hearing be set for October 6, 2014. I concur with the recommendation and respectfully request Mayor and City Council approval. IA/1144 ,,,,, Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer 6 � DATE: September 8, 2014 Dubuque tratid All -America City 1111 1f 200 •2012.21113 SUBJECT: Upper Bee Branch Creek Restoration Project, Property Acquisition, 429 Rhomberg Stabilization Project (CIP# 3401654) INTRODUCTION The enclosed resolutions authorize the public bidding procedure and establish the date of a public hearing for the 429 Rhomberg Stabilization Project required as part of the Upper Bee Branch Creek Restoration Project. BACKGROUND In April of 2010 the City Council adopted Resolution 92-10 authorizing the City to enter into a Programmatic Agreement (PA) among the U.S. Army Corp of Engineers (USACE), the Iowa Department of Natural Resources (IDNR), the State Historic Preservation Officer (SHPO), and the City of Dubuque regarding the construction of the Bee Branch Creek Restoration Project. The PA outlines the manner in which the City can proceed with the Bee Branch Creek Restoration Project in accordance with the requirements set forth in 36 CFR Part 800, Section 106 (Section 106 Process) which ensures that no unnecessary harm comes to historic properties. As outlined in the PA, "the City shall ensure that all historic architectural properties ... whose removal is not necessary for the project will be protected from both direct and indirect adverse effects produced by activities associated with (construction of the project)." On November 18 of 2013 the City Council adopted Resolution 327-13 authorizing the acquisition of 427-429 Rhomberg as necessary for the Bee Branch Creek Restoration Project. On November 20, 2013 the City acquired 427-429 Rhomberg Avenue. DISCUSSION The acquisition of 429 Rhomberg was necessary to enable the City to stabilize and protect the historic building to prevent and repair damage that might occur as a result of the construction activity associated with the Upper Bee Branch Creek Restoration Project. To that end, contract documents have been prepared for the 429 Rhomberg Stabilization Project (Project). The Project involves the removal (deconstruction) of the steel sided building addition and to stabilize or otherwise "mothball" the original 3 -story masonry building to a weatherproof condition that can be maintained until such time when it will be fully developed following construction of the Upper Bee Branch Creek Restoration Project. The stabilization will be done in conformance with the U. S. Department of the Interior's guidelines to ensure the building retains its eligibility for historic rehabilitation tax credits. The work includes masonry repair (patching and/or limited replacement) and tuckpointing, a complete roof membrane and insulation system removal and replacement, temporary existing opening wall infill, and other selective building envelop repair. The work also includes removal and salvage of the existing metal cornice at the top of the parapet, and steel fire escapes and ladders for potential future restoration and reinstallation. The schedule for the 429 Rhomberg Stabilization Project is as follows: Initiate Public Bidding Processing Advertisement for Bids Publish Notice of Hearing on Plans & Specifications Public Hearing Receipt of Bids Award of Contract Construction Complete RECOMMENDATION September 15, 2014 September 19, 2014 September 19, 2014 October 6, 2014 October 9, 2014 October 20, 2014 December 31, 2014 I recommend that the City Council establish the date for the public hearing and authorize the City Clerk to advertise for proposals for the 429 Rhomberg Stabilization Project. BUDGET IMPACT The estimate of probable costs for the 429 Rhomberg Stabilization Project is as follows: Construction Contingency Engineering Total Project Cost $ 182,817.00 36,564.00 36,500.00 $ 255,881.00 The work will be completed using funds established for the $200 million Bee Branch Watershed Flood Mitigation Project. ACTION TO BE TAKEN I respectfully request that the City Council adopt the attached resolutions that establish the date of the public hearing and authorize the City Clerk to advertise for proposals for the 429 Rhomberg Stabilization Project. Attach. Prepared by Deron Muehring, Civil Engineer II cc: Barry Lindahl, City Attorney Jenny Larson, Budget Director Ken TeKippe, Finance Director Deron Muehring, Civil Engineer II RESOLUTION NO. 294-14 429 RHOMBERG STABILIZATION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the 429 Rhomberg Stabilization Project in the estimated amount $255,881.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 6th day of October, 2014, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The 429 Rhomberg Stabilization Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 9th day of October, 2014. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 20th day of October, 2014, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 15th day of Septe ber, 2014. Attest: Kevi S. Firnstahl, CM City Clerk (0 LI Roy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE: 429 RHOMBERG STABILIZATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 429 Rhomberg Stabilization Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 6th day of October 2014, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The work involves the removal (deconstruction) of the steel sided lower building addition and to stabilize or otherwise "mothball" the original 3 -story masonry building to a weatherproof condition that can be maintained until an undetermined time when it will be fully developed. The stabilization will require brick masonry repair (patching and/or limited replacement) and tuckpointing , a complete roof membrane and insulation system removal and replacement, temporary existing opening wall infill, and other selective building envelop repair. In addition, the work will also include removal and salvage of the existing metal cornice at the top of the parapet, and steel fire escapes and ladders for potential future restoration and reinstallation. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 556-9948 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of 2014. Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT (Reissued with Revised Bid Date) 429 Rhomberg Demolition and Building Stabilization Time and Place for Filing Sealed Proposals: Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on October 14, 2014, in the Office of the City Clerk, City Hall, First Floor, 50 West 13 Street, th Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered: Sealed proposals will be opened and bids tabulated at 2:00 p.m. on October 14, 2014, at City Hall, 50 West 13 Street, Dubuque, Iowa, for consideration by the City Council th (Council) at its meeting on October 20, 2014. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Project: Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by June 1, 2015. Bid Security: Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier’s check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or the governmental entity may provide for a bidder’s bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents: Copies of the plans and specifications may be obtained at the Engineering Department, City Hall – Second Floor, 50 West 13 Street, Dubuque, Iowa 52001. No deposit is required. th Award of Project: Award of the project to low bidder may be dependent on approval of the proposed work by the SHPO (State Historic Preservation Office). Preference for Iowa Products: By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, to the extent lawfully required under Iowa statutes. Sales Tax: The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Bidder Status Form: Under Iowa law, Bidders are required to submit the Bidder Status Form that follows the Bid Form in the specifications. Failure to provide the form with the bid may result in the bid being deemed nonresponsive. This may result in the bid being rejected by the Owner. Debarments and Suspensions: Any bidder or equipment supplier whose firm or affiliate is listed in on the U.S. General Services Administration Excluded Parties List System web site at http://www.epls.gov/ will be prohibited from the bidding process. Anyone submitting a bid who is listed on this web site will be determined to be a non-responsive bidder in accordance with 40 CFR Part 31. General Nature of Public Improvement: The intent of the project is to remove (deconstruct) the steel sided lower building addition and to stabilize or otherwise “mothball” the original 3-story masonry building to a weatherproof condition that can be maintained until an undetermined time when it will be fully developed. The stabilization will require brick masonry repair (patching and/or limited replacement) and tuckpointing, a complete roof membrane and insulation system removal and replacement, temporary existing opening wall infill, and other selective building envelop repair. In addition, the work will also include removal and salvage of the existing metal cornice at the top of the parapet, and steel fire escapes and ladders for potential future restoration and reinstallation. A-1 Reports: The Hazardous Materials Survey Report and the Phase I Environmental Site Assessment are available for review by bidders at City of Dubuque, City Hall, 50 West 13 Street, Dubuque, IA 52001. th Pre Bid Meeting: 10:00 a.m., September 23, 2014 at the project site. Attendance is voluntary. A-2 NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT 429 Rhomberg Demolition and Building Stabilization Time and Place for Filing Sealed Proposals: Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on October 9, 2014, in the Office of the City Clerk, City Hall, First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered: Sealed proposals will be opened and bids tabulated at 2:00 p.m. on October 9, 2014, at City Hall, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on October 20, 2014. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Project: Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by December 31, 2014. Bid Security: Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state -chartered or federally chartered bank, or a certified share draft drawn on a state -chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents: Copies of the plans and specifications may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No deposit is required. Award of Project: Award of the project to low bidder will be dependent on approval of the proposed work by the National Park Service. Preference for Iowa Products: By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, to the extent lawfully required under Iowa statutes. Sales Tax: The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Bidder Status Form: Under Iowa law, Bidders are required to submit the Bidder Status Form that follows the Bid Form in the specifications. Failure to provide the form with the bid may result in the bid being deemed nonresponsive. This may result in the bid being rejected by the Owner. Debarments and Suspensions: Any bidder or equipment supplier whose firm or affiliate is listed in on the U.S. General Services Administration Excluded Parties List System web site at http://www.epls.gov/ will be prohibited from the bidding process. Anyone submitting a bid who is listed on this web site will be determined to be a non-responsive bidder in accordance with 40 CFR Part 31. General Nature of Public Improvement: The intent of the project is to remove (deconstruct) the steel sided lower building addition and to stabilize or otherwise "mothball" the original 3 -story masonry building to a weatherproof condition that can be maintained until an undetermined time when it will be fully developed. The stabilization will require brick masonry repair (patching and/or limited replacement) and tuckpointing, a complete roof membrane and insulation system removal and replacement, temporary existing opening wall infill, and other selective building envelop repair. In addition, the work will also include removal and salvage of the existing metal cornice at the top of the parapet, and steel fire escapes and ladders for potential future restoration and reinstallation. A-1 Reports: The Hazardous Materials Survey Report and the Phase I Environmental Site Assessment are available for review by bidders at City of Dubuque, City Hall, 50 West 13th Street, Dubuque, IA 52001. Pre Bid Meeting: 10:00 a.m., September 23, 2014 at the project site. Attendance is voluntary. A-2