Loading...
SRF Green Alley Project_Bid Set 2 - Year 2 AwardTHE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 2 - Year 2 (CIP 7102450, 7201008, 7101289, 7401405) DATE: September 8, 2014 Dubuque band AI -America City r 2007 • 2012 • 2013 Sealed bids were received for the SRF Green Alley Bid Set 2 — Year 2 Project. City Engineer Gus Psihoyos recommends award of the contract to the only bidder, Drew Cook and Sons Excavating, in the amount of $1,006,608.30, which is 4.02% over the revised estimate of probable cost. This project was originally scheduled to be awarded at the September 2, 2014 City Council meeting. Fehr -Graham, the City's consulting engineer on this project, revised their estimate of probable cost significantly after the project was initiated with the City Council. Engineering received one bid from Drew Cook and Sons Excavating. Engineering requested the project award be delayed so the proposed project costs could be discussed with the contractor and engineer. Special assessments for residents will be held at the preliminary assessment average of $1,316. I concur with the recommendation and respectfully request Mayor and City Council approval. 7.- Mic ael C. Van Milligen bc./1144 0/4 MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer DATE: September 4, 2014 Michael C. Van Milligen, City Manager SUBJECT: SRF Green Alley Bid Set 2 — Year 2 (CIP 7102450, 7201008, 7101289, 7401405) INTRODUCTION Dubuque kribi AN•Americaeity 11111! 2007 • 2012 • 2013 The enclosed resolution authorizes the award of the construction contract for the SRF Green Alley Bid Set 2 — Year 2 Project. BACKGROUND This project was originally scheduled to be awarded at the September 2, 2014 City Council meeting. Fehr -Graham, the City's consulting engineer on this project, revised their estimate of probable cost significantly after the project was initiated with the City Council. Engineering received one bid from Drew Cook and Sons Excavating. Engineering requested the project award be delayed so the proposed project costs could be discussed with the contractor and engineer. DISCUSSION Bid Set 2 — Year 2 will involve the reconstruction of eight (8) alleys in the Bee Branch Watershed. The alley locations are as follows: • Alley from Loras Blvd. to Fillmore St between Adair Street and North Grandview Avenue • Alley from Fillmore Street to Decorah Street between Adair Street and North Grandview Avenue • Alley from Decorah Street to Delaware Street between Adair Street and North Grandview Avenue • Alley from Custer Street to Loras Blvd. between North Grandview Avenue and Atlantic Street (This alley includes water main that will be replaced) • Alley from Loras Blvd. to Fillmore Street between North Grandview Avenue and Atlantic Street • Alley from Fillmore Street to Decorah Street between North Grandview Avenue and Atlantic Street • Alley from Decorah Street to Delaware Street between North Grandview Avenue and Atlantic Street • Alley from Poplar Street to Bunker Hill Road between Asbury Road and Finley Street This project will reconstruct the second bid set of green alleys slated for year 2 in the Bee Branch Watershed. Currently, there are 28 alleys under contract. Of these 28 alleys, 12 alleys are complete and currently being used by the abutting property owners. The remaining 16 alleys are under construction. Engineering has 20 additional alleys in the process of being designed. These 20 alleys will be brought to the City Council for consideration in the near future. The reconstruction of the alleys will include: — Removal of the existing alley pavement — Excavation of the subgrade to allow the placement of clean washed stone for a storage medium — Installation of a concrete border for the brick pavers — Installation of concrete headers at the alley intersection with the intersecting streets. — Reconstruction of the pavement surface with interlocking concrete pavers — Sanitary Sewer section repair — Installation of a water main in one alley This project will reconstruct the alleys into green alleys. These alleys allow rainwater to infiltrate into the pavement rather than runoff into the storm sewers. This infiltration allows for filtering of the water and recharge back into the aquifer. Monitoring wells are also planned to be installed so that water quality improvements can be documented. A water main is proposed in the alley from Custer Street to Loras Boulevard between North Grandview Avenue and Atlantic Street. Currently there are three houses that take service from a long copper service line. This public water main froze this past winter, a new water main will be installed at a greater depth to prevent the freezing in the future. Installing a new water main will improve the service to these properties by providing a water main loop, thus removing the dead end line and minimizing the potential for freezing. The project construction documents will follow the Statewide Urban Design and Specifications (SUDAS) in the development of the construction documents. The Iowa Department of Natural Resources (IDNR) have reviewed and approved the plans so that the City cost can be covered with SRF funds. The Water Department will be funding the water main costs in one of the alleys. There are no private water services being replaced and assessed. This project will have special assessments. 2 BID RESULTS The City of Dubuque received the following bids for the SRF Green Alley Project - Bid Set 2 Year 2 on August 21, 2014: Contractor Drew Cook and Sons Excavating Bid Results $ 1,006,608.30 Drew Cook and Sons Excavating of Dubuque, Iowa, submitted the only bid in the amount of $1,006,608.30. This amount is 4.02% over the revised estimate of probable cost. REVISED COST ESTIMATE In the development of the construction documents, Fehr -Graham had an original construction estimate of $751,989.00 for the project. After the City started to receive the recent bids for green alleys, Fehr -Graham reviewed those bids, revisited their estimate, added additional bid items, revised quantities and revised some estimated unit prices. The revised estimate added $215,676.50 to the project. New Items — Here is a list of the new items that were added. These items add $64,698 to the estimate of cost. Added Item Cost Below Grade Excavation (core out) $13,350 Subgrade Preparation $13,240 Sub -base, Special backfill — Gradation 30 $900 Rigid Insulation Board $2,560 Sanitary Sewer Service Pipe, 6" $12,996 Storm Sewer Gravity main, 24" RCP $3,800 Removal of Storm Sewer, under 36" dia. $2,910 Concrete Collar Connection $800 Pipe Lining, CIPP, 8" $7,040 Fittings, Mega Lug, 6" $2,000 Connection to Existing Intakes $1,000 Sidewalk, PCC 4" Thickness $2,352 Driveway, Granular $1,750 TOTAL $64,698 3 Revised Quantities — Here is a list of the bid items with a revision to their original estimated quantity by more than 20 percent. These revised item quantities added $137,573 to the estimate of cost. Revised Item Excavation Subbase, Granular 3" Breaker Porous Agg. Grad. 3 Curb and Gutter Full Depth Patch, HMA Brick Pavement, Type 2 Geotextile Fabric Revised Unit Prices — Original Quantity 4300 CY 423 Ton 503 Ton 835 Ton 725 LF 60 SY 2410 SF 3896 SY Revised Quantity 6050 CY 1040 Ton 890 Ton 2015 Ton 1205 LF 808 SY 3890 SF 8400 SY TOTAL Price Difference $21,000 $11,106 $9,675 $24,780 $12,000 $33,660 $11,840 $13,512 $137,573 Here is a list of the bid items with a revised unit price from the original estimate to the revised estimate. These revised unit prices added $13,405.50 to the estimate of cost. Revised Item Original Unit Price Revised Unit Price Mobilization $18,400/LS $24,000/LS Water Service $100/LF $120/LF Relocation, Copper Full Depth Patches, $45/SY HMA SWPPP Qualifying $100/EA Rainfall Event Unit Price Difference $5,600 $20/LF $85/SY $40/SY $400/EA $300/EA Engineering Department staff met with the contractor, Drew Cook and Sons Excavating, their pervious paving contractor, Nauman Nursery and also with the engineer on the project, Fehr -Graham to discuss the bid prices and the project as a whole. Based on these discussions, the Engineering staff agrees the revised estimate is more appropriate for this project. These alleys are located toward the west end of the Bee Branch Watershed. The sub- surface conditions (clay soils) of these alleys require more drain tile and stone to accommodate the design storms versus the alleys downtown which are on top of sand. These alleys are also in more construction constrained areas versus the flatter and more open alleys downtown. These constraints include rolling topography, tree conflicts, and retaining walls. Due to the topography constraints, the paved section of the alley is narrower in some cases. In terms of constructability, the contractor will need to pour the concrete collar on one side of the alley using a redi-mix truck and pour the other side of 4 the alley with motorized buggies. The additional labor required due to these constraints causes the overall cost of the alleys to increase in price. Even though the City received only one bid for this project, the bid prices appear to be in line with the revised estimate of costs. Drew Cook and Sons Excavating has historically been the low bidder on the alleys bid thus far. As a result, special assessments for residents will be held at the preliminary assessment average of $1,316.00, including engineering and contingency. RECOMMENDATION I recommend that the contract for the SRF Green Alley Bid Set 2 — Year 2 Project be awarded to Drew Cook and Sons Excavating of Dubuque, Iowa in the amount of $1,006,608.30 which is 4.02% over the engineer's revised estimate of probable cost. The IDNR has reviewed the bid tab and concurs with the award of the contract. BUDGET IMPACT The estimate of probable cost for the SRF Green Alley Bid Set 2 -- Year 2 Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost Orig. Estimate Revised Estimate $751,989.00 75,198.90 124,078.19 $951,266.09 The project funding summary is as follows: $967,665.50 96,766.55 124,078.19 1,188.510.24 Award $1,006,608.30 100,660.83 124,078.19 $1,231,347.32 Fund CIP No. Fund Description Amount 7102450 SRF Green Alley Project $777,165.40 Special Assessment - Alley Improvement, Residential 97,418.92 Special Assessment — Alley Improvement, Commercial 0.00 Special Assessment Residential Deficiency 0.00 7201008 Storm Sewer Improvements/Extensions 10,580.46 7101289 General Sanitary Sewer 2,277.00 7401405 Water Main Replacements 63824.31 Total Project Funding $951,266.09 5 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding for the SRF Green Alley Project Bid Set 2 — Year 2 to Drew Cook and Sons Excavating, Inc. in the amount of $1,006,60830. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Deron Muehring, Civil Engineer II Denise Ihrig, Environmental Engineer Casey Stickfort, Fehr -Graham Ryan Wicks, Fehr -Graham 6 RESOLUTION NO. 299-14 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE SRF GREEN ALLEY BID SET 2 — YEAR 2 PROJECT Whereas, sealed proposals have been submitted by contractors for the SRF Green Alley Bid Set 2 — Year 2 Project (the Project) pursuant to Resolution No. 217-14 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 25th day of July, 2014. Whereas, said sealed proposals were opened and read on the 21st day of August, 2014, and it has been determined that Drew Cook and Sons Excavating, Inc. of Dubuque, Iowa, with a bid in the amount of $1,006,608.30, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Drew Cook and Sons Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 15th day of September, 2014. Attest: S. Firnstahl, CM oy D. Buol, Mayor