Third Street Overpass Light Replacement AwardTHE CITY OF ,,,~ DUB" E MEMORANDUM Masterpiece cm the Mississippi June 19, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Third Street Overpass Light Replacement Project (CIP 1001918: 3rd Street Overpass Light Replacement Project) Sealed bids were received for the Third Street Overpass Light Replacement Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Giese Sheet Metal Co., Inc., in the amount of $39,474.60, which is 18.71 % over the engineer's revised estimate of probable cost. The bid overage was due to the uniqueness of the work around the Third Street Bridge traffic control and the protection of Highway 151/61. I concur with the recommendation and respectfully request Mayor and City Council approval. ~/Z Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF ~, DUB E Masterpiece on t1~e Mississippi MEMORANDUM June 18, 2007 TO: Michael C. Van Milligen, City Manage FROM: Gus Psihoyos, City Engineer t. SUBJECT: Third Street Overpass Light Replacement Project (CIP 1001918: 3`d Street Overpass Light Replacement Project) INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Third Street Overpass Light Replacement Project. BACKGROUND This project provides for the replacement of lights (poles and fixtures) on the Third Street overpass. There are 25 existing light locations along the Third Street Overpass that extends from Main Street to Bell Street. Twenty-four of the 25 lights will be replaced with new fixtures that will include receptacles for holiday lighting. One light at the southeast corner of Third and Main has already been replaced as part of the Main Street Lighting project currently under construction. The street lighting equipment has already been ordered due to a 12- to 14-month build time. BID RESULTS Sealed bids were received on the project on June 14, 2007. Giese Sheet Metal Co., Inc. of Dubuque, Iowa, submitted the low base bid in the amount of $39,474.60. This amount is 18.71 % over the engineer's revised estimate of probable cost. The bid overage was due to the uniqueness of the work around the Third Street Bridge traffic control and the protection of Highway 151/61. A summary of the bid proposals received is as follows: Contractor Name Giese Sheet Metal Co., Inc. $39,474.60 Westphal & Co., Inc. $42,198.97 Tschiggfrie Excavating Co. $58,829.00 RECOMMENDATION I recommend that the contract be awarded to Giese Sheet Metal Co., Inc. in the amount of $39,474.60. PROJECT COST -BUDGET IMPACT The revised estimate of probable costs for the Third Street Overpass Light Replacement Project is summarized as follows: Original Revised Cost Cost Estimate Estimate Bid Award Construction Contract $25,000.00 $33,252.50 $39,474.60 Contingency 2,500.00 3,325.25 3,325.25 Construction Engineering & Inspection 4,125.00 9,975.75 9,975.75 $31,625.00 $46,553.50 $52,775.60 * The engineer's estimate was revised during final design to include the current copper prices and the additional wiring needed to ensure all the lights on the bridge turn on simultaneously. The project funding summary is as follows: CIP No. Fund Description Fund Amount 1001918 3~d Street Overpass Light Replacement Project $80,660.00 Total Project Funding 80 660.00 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Third Street Overpass Light Replacement Project to Giese Sheet Metal Co., Inc. in the amount of $39,474.60. Prepared by: David Ness, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Operations & Maintenance Supervisor Bob Schiesl, Assistant City Engineer RESOLUTION NO. 363-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE THIRD STREET OVERPASS LIGHT REPLACEMENT PROJECT Whereas, sealed proposals have been submitted by contractors for the Third Street Overpass Light Replacement Project (the Project) pursuant to Resolution No. ~"D? and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 25th day of May, 2007. Whereas, said sealed proposals were opened and read on the 14th day of June, 2007 and it has been determined that Giese Sheet Metal Co., Inc. of Dubuque, Iowa, with a bid in the amount of $39,474.60, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Giese Sheet Metal Co., Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 2nd Attest: ,~ eanne F. Schneider, CMC, City Clerk day of J u 1 y , 2007. Roy D. Buol, Mayor CITY OF DUBUQUE -ENGINEERING DNISION -BID TABULATION SHEET BID TABULATION FOR: THIRD STREET OVERPASS LIGH7 BID DATE: June 14, 2007 REPLACEMENT PROJECT D ED ES BID ITEM DESCRIPTION UNIT pUAN TITV UNIT COST COST 1 Etdsting Lighting Control Equipment, Remove and Salvage LS 1 $ 500.00 $ 500.00 2 PC Conaete Sidewalk, 4" Remove and Constmct SF 50 E 12.00 $ 800.00 3 Historic Street Light Remove, Salvage and Replace Each 24 E 500.00 $ 12,000.00 4 3" Sch 40 PVC Conduit -Trenched LF 45 E 15.00 $ 675.00 5 Electrical Cable, #G XHHW LF 10950 $ 0.95 $ 10,402.50 8 Electrical Cable, #8 XHHW LF 5220 $ 0.75 $ 3,915.00 7 Electrical Cable, #8 Bare for Ground LF 800 E 0.70 $ 560.00 8 Elecrical Cabk, #10 XHHW LF 2000 E 0.50 E 1,000.00 9 Pull Box, 11"X18" Each 2 $ 300.00 E 600.00 10 Traffic Control B Safety Control LS 1 E 1,500.00 $ 1,500.00 11 Mobilization LS 1 E 1,500.00 E 1,500.00 Totel Bid S 33,252.50 Total Bid Construction f 3$,252.50 Contingency (10%) $3,325.25 Conslrud ion Engineering 8lnspec8on (15%) 59,975.75 Total Construction Estimate: S 46,553.50 BASE BID (%) OVER /UNDER (-) BIDDER: Giese Sheet Metal Ca. BIDDER: Westphal ~ Co. BIDDER: Tschggfie Extav. BIO BID UNIT COST TOTAL COST $ 850.00 E 850.00 E 10.00 E 500.00 $ 680.00 $ 16,320.00 $ 13.30 E 598.50 $ 1.05 S 11,497.50 E 0.76 E 4,071.60 $ 0.65 S 520.00 $ 0.62 E 1,240.00 $ 586.00 E 1,172.00 S 1,455.00 $ 1,455.00 $ 1,250.00 E 1,250.00 E 39 471.60 Base eM suo-7otal S 39,474.60 18.71% BID BID UNIT COST TOTAL COST $ 1,767.000 $ 1,767.00 $ 30.120 $ 1,506.00 $ 448.500 $ 10,764.00 E 29.111 $ 1,310.00 $ 1.013 S 11,092.35 $ 1.361 $ 7.1oa.a2 $ 0.614 E 491.20 $ 0.484 $ 968.00 $ e76.oo0 $ 1,752.oD $ 1,447.000 $ 1,447.00 E 3,997.000 E 3,997.00 $ 62,198.97 Oasa eia suo-iow S 42,198.97 26.90% BID BID UNIT COST TOTAL COST $ 925.00 $ 925.00 E 15.00 S 750.00 $ 1,150.00 $ 27,600.00 $ 20.00 E 800.00 E 1.30 E 14,235.00 $ 0.95 $ 4,959.00 $ 0.85 E 680.00 $ 0.75 E 1,500.00 $ 64g.oo $ 1,zao.oo E 750.00 $ 750.00 $ 5,250.00 E 5,250.00 E 58,829.00 aria ea suo-rowt f 68,629.00 76.92%