Loading...
Decorative Concrete Repair AwardTHE CITY OF DUB ~ E MasEerpiece nn tFte Mississippi MEMORANDUM June 27, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Decorative Concrete Repair and Maintenance Project CIP 3001630 Sealed bids were received for the Decorative Concrete Repair and Maintenance Project. The low bid for all elements of the project was 21 % over the Engineer's Estimate. City Engineer Gus Psihoyos is recommending that some of the project elements be delayed for a future date and the bid on the remaining elements be awarded to the low bidder, Tschiggfrie Excavating in the amount of $227,449.45, which is within budget. I concur with the recommendation and respectfully request Mayor and City Council approval. ~1 ~'~ Michael C. Van Milligen ~ ~ -~-fi ~ MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer "I'H E Cl"I'Y OF DUB E MEMORANDUM Masterpiece on the Mississippi June 26, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Decorative Concrete Repair and Maintenance Project CIP 3001630 INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Decorative Concrete Repair and Maintenance Project. BACKGROUND The Decorative Concrete Repair and Maintenance Project will provide for minor repairs, joint sealing, and the removal of dirt, oils, stains and the application of a new protective sealer on the decorative concrete surface at the following locations: • Mississippi Riverwalk • River's Edge Plaza • Alliant Amphitheater • Ice Harbor Park • Ice Harbor West Road • Main Street, Town Clock Area • 4th Street Parking Ramp • City Hall • Washington Park • Flat Iron Park • Chamber Building Plaza Area • Peosta Channel Trail, Rest Areas • Pyatigorsk Park BID RESULTS Sealed bids were received on the project on June 21, 2007. Tschiggfrie Excavating, Inc. of Dubuque, Iowa submitted the low bid in the amount of $256,736.95. This amount is 21.5% over the engineer's estimate of probable cost. A summary of the bid proposals received are as follows: Contractor Name Bid Amount Tschiggfrie Excavating, Inc. $ 256,736.95 Portzen Construction, Inc. $ 269,622.10 Because this was the first time the City has developed a Decorative Concrete Repair and Maintenance Project and there was no local historical cost reference information for such specialized work, the City included terms in the Bid Proposal Form which stated that "the City reserves the right to ADD or DELETE any of the above Bid Items (1 - 57) based on available project funding, either at the time of awarding the Improvement Contract or at any time during the duration of the contract. The undersigned hereby acknowledges and agrees to the above terms for the ADD or DELETE Bid Items (1 - 57)". Based on the above terms, staff is recommending deleting the following Bid Items: Joint Sealing 50 River's Edge Plaza 51 Riverwalk 52 Riverwalk -Stair 1 53 Riverwalk -Stair 2 Pavement Replacement 54 8th Street at Grand Opera House, Alley Total Deduct A summary of the adjusted bid amounts are as follows: Contractor Name Tschiggfrie Excavating, Inc. Portzen Construction, Inc. RECOMMENDATION Tschiggfrie Portzen $ 13,225.00 $ 3,795.00 5,520.00 1,080.00 1,225.00 231.00 1,487.50 280.50 7,830.00 3,240.00 ~ 29,287.50 8 626.50 Bid Amount $ 227,449.45 $ 260,995.60 I recommend that the contract be awarded to Tschiggfrie Excavating, Inc. in the amount of $227,449.45. PROJECT COST -BUDGET IMPACT The estimate of probable costs for the Decorative Concrete Repair and Maintenance Project is summarized as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost Estimate Award $ 211,000 $ 227,449.45 21,100 21,100.00 23,210 23,210.00 255 310 $ 271,759.45 The project funding summary is as follows: CIP No. Fund Description 3001630 FY07 Decorative Concrete Maintenance 3001630 FY08 Decorative Concrete Maintenance 3001953 FY 2008 Street Construction Program Total Project Funding ACTION TO BE TAKEN Fund Amount $ 190,306.00 65,000.00 16,453.45 $ 271,759.45 I recommend that the City Council adopt the attached resolution awarding the Decorative Concrete Repair and Maintenance Project to Tschiggfrie Excavating, Inc. in the amount of $227,449.45. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director John Klostermann, Public Works Gil Spence, Leisure Services Tim Horsfield, Parking Division Chris Lyons, Engineering Technician RESOLUTION NO. 375-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE DECORATIVE CONCRETE REPAIR AND MAINTENANCE PROJECT Whereas, sealed proposals have been submitted by contractors for the Decorative Concrete Repair and Maintenance Project (the Project) pursuant to Resolution No2~5-0~ and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 25th day of May, 2007. Whereas, said sealed proposals were opened and read on the 21St day of June, 2007 and it has been determined that Tschiggfrie Excavating, Inc. of Dubuque, Iowa, with a bid in the amount of $227,449.45, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Tschiggfrie Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 2nd day of Ju17~ , 2007. Roy D. Buol, Mayor Attest: eanne F. Schneider, CMC, City Clerk CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: DECORATIVE CONCRETE REPAIR AND BID DATE: June 21, 2007 MAINTENANCE PROJECT I E E BID ITEM DESCRIPTION UNIT OUA D ITY UN T COST COST EXTRACTION CLEAN" & SEAL ,. 1 ALLIANTAMPHITHEATER SF 13,644.0 $ 0.65 $ 8,868.60 2 RIVERS EDGE PLAZA SF 13,941.0 $ 0.65 $ 9,061.65 3 RIVERS EDGE PLAZA-CASCADING STAIRS SF 1,100.0 $ 0.65 $ 715.00 4 5TH STREET & BELL STREET INTERSECTION SF 2,OW.0 $ 0.65 $ 1,3W.00 5 MAIN STREET 8 5TH STREET INTERSECTION SF 3,687.0 $ 0.65 $ 2,396.55 6 MAIN STREET & 6TH STREET INTERSECTION SF 1,746.0 $ 0.65 $ 1,134.90 7 MAIN STREET & 7TH STREET INTERSECTION SF 3,186.0 $ 0.65 $ 2,070.90 8 MAIN STREET 8 8TH STREET INTERSECTION SF 2,968.0 $ 0.65 $ 1,929.20 9 MAIN STREET 8 9TH STREET INTERSECTION SF 3,521.0 $ 0.65 $ 2,288.65 10 MAIN STREET, 5TH TO 9TH -PARKING AREAS SF 5,655.0 $ 0.65 $ 3,675.75 11 6TH STREET & LOCUST STREET INTERSECTION SF 2,996.0 $ 0.65 $ 1,947.40 12 7TH STREET & LOCUST STREET INTERSECTION SF 3,852.0 $ 0.65 $ 2,503.80 13 8TH STREET & LOCUST STREET INTERSECTION SF 4,025.0 $ 0.65 $ 2,616.25 14 8TH STREET & LOCUST STREET /ALLEY INTERSECTION SF 2,141.0 $ 0.65 $ 1,391.65 15 8TH STREET R IOWA STREET INTERSECTION SF 5,729.0 $ 0.65 $ 3,723.85 16 8TH STREET & IOWA STREET /ALLEY INTERSECTION SF 1,939.0 $ 0.65 $ 1,260.35 17 8TH STREET, LOCUST TO IOWA STREET -PARKING AREAS SF 1,989.0 $ 0.65 $ 1,292.85 CLEANi & SEAL _ _ 18 RIVERWALK-ALL SIDEWALK SF 39,775.0 $ 0.5U $ 19,887.50 19 RIVERWALK -STAIR 1 SF 958.0 $ 0.50 $ 479.00 20 RIVERWALK-STAIR2 SF 1,134.0 $ 0.50 $ 567.00 21 RIVERWALK-STAIR3 SF 1,481.0 $ 0.50 $ 740.50 22 RIVERWALK -SHADE STRUCTURE FOUNDATIONS SF 183.0 $ 0.50 $ 91.50 23 RIVERWALK -CASINO PORT SIDE BUILDING SF 36,636.0 $ 0.50 $ 18,318.00 24 RIVERWALK -ICE HARBOR PARK SF 14,941.0 $ 0.50 $ 7,470.50 25 RIVERWALK -ICE HARBOR WEST ROAD SF 7,9W.0 $ 0.50 $ 3,950.00 26 BELL STREET DECORATIVE SIDEWALK SF 21,238.0 $ 0.50 $ 10,619.00 27 5TH STREET DECORATIVE SIDEWALK SF 24,915.0 $ 0.50 $ 12,457.50 28 CHAMBER OF COMMERCE PATIO SF 3,400.0 $ 0.50 $ 1,700.00 29 4TH STREET PARKING RAMP DECORATIVE SIDEWALK SF 6,SW.0 $ 0.50 $ 3,250.00 30 MAIN STREET, 5TH TO 9TH -DECORATIVE SIDEWALK SF 45,OW.0 $ 0.50 $ 22,500.00 31 WASHINGTON PARK SF 20,110.0 $ 0.50 $ 10,055.00 32 CITY HALL SF 5,300.0 $ 0.50 $ 2,650.00 33 FLAT IRON PARK SF 4,600.0 $ 0.50 $ 2,3W.00 34 PEOSTA CHANNEL JAYCEE'S BIKE TRAIL SF 1,900.0 $ 0.50 $ 950.00 35 PYATIGORSK PARK SF 5,614.0 $ 0.50 $ 2,807.W RIVERS-:EDGE PLAZA =CASCADING STAIRS 36 STAIR RISER SURFACE PREP, SANDBLAST SF 400.0 $ 2.50 $ 1,OW.W 37 REPAIR AND RESURFACE, PASTE AND TEXTURE SF 400.0 $ 6.00 $ 3,2W.00 RNERWAIK STAIR 1,"REPAIR AND RESURFACE' 38 SURFACE PATCH REPAIRS, COMPLETE LUMP SUM 1.0 $ 2,500.00 $ 2,5W.00 39 RESURFACE COATING, COMPLETE LUMP SUM 1.0 $ 2,500.00 $ 2,5W.00 BIDDER: Tschiggfrle Excavating, inc. BIDDER: Portzen Construction, Inc. BID UNIT COST BID TOTAL COST $ 0.80 $10,915.20 $ 0.80 $11,152.80 $ 0.80 $880.00 $ 1.00 $2,000.00 $ 1.00 $3,687.00 $ 1.00 $1,746.00 $ 1.00 $3,186.W $ 1.00 $2,968.00 $ 1.00 $3,521.00 $ 1.00 $5,655.00 $ 1.00 $2,996.00 $ 1.00 $3,852.00 $ 1.OD $4,025.00 $ 1.00 $2,141.00 $ 1.00 $5,729.00 $ 1.00 $1,939.00 $ 1.00 $1,989.00 BID UNIT BID COST TOTAL COST $ 1.W $13,644.W $ 1.W $13,941.00 $ 1.W $1,100.00 $ $ 1.15 1.15 $2,300.00 $4,240.05 $ 1.15 $2,W7.90 $ $ 1.15 1.15 $3,663.90 $3,413.20 $ 1.15 $4,049.15 $ 1.15 $6,503.25 $ 1.15 $3,445.40 $ 1.15 $4,429,80 $ 1.15 $4,628.75 $ $ $ 1.15 1.15 1.15 $2,462.15 $6,588.35 $2,229.85 $ 1.15 $2,287.35 $ 0.45 $17,698.75 $ 0.45 $431.10 $ 0.45 $510.30 $ $ 0.45 0.45 $666.45 $82.35 $ 0.45 $16,486.20 $ 0.35 $5,229.35 $ 0.35 $2,765.00 $ 0.35 $7,433.30 $ 0.35 $8,720.25 $ 0.45 $1,530.00 $ 0.35 $2,275.00 $ 0.35 $15,750.W $ 0.35 $7,038.50 $ 0.45 $2,385.00 $ 0.35 $1,610.00 $ 0.35 $665.00 $ 0.35 $1,964.90 $ 15.00 $6,000.00 $ 15.00 $6,000.00 $ 4,500.00 $4,500.00 $ 3,800.W $3,800.00 $ $ $ 0.50__. 0.50 0.50 $19,887.50 $479.00 $567.00 $ $ 0.50 0.50 $740.50 $91.50 $ 0.50 $18,318.W $ 0.50 $7,470.50 $ 0.50 $3,950.00 $ 0.50 $10,619.W $ 0.50 $12,457.50 $ $ $ 0.50 0.50 0.50 $1,700.00 $3,250.00 $22,5W.W $ 0.50 $10,OSS.W $ 0.50 $2,650.00 $ 0.50 $2,300.00 $ 0.50 $950.00 $ 0.50 $2,807.00 $ 7.15 $z,fiso.oo $ 8.W $3,2W.00 $ 6,300.W $6 3W.W $ 3,400.W $3,4W.OD Page 1 of 2 CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: DECORATIVE CONCRETE REPAIR AND BID DATE: June 21, 2007 MAINTENANCE PROJECT D TE E BID ITEM DESCRIPTION UNIT TITY OUAN UNIT COST C ST R1VERINALKSTAIR2, REPAIR'-AND RESURFACE " BOTTOM LANDING, REMOVE 8 REPLACE 40 DECORATIVE CONCRETE SF 36.0 $ 75.00 $ 2,700.00 , COMPLETE 41 SURFACE PATCH REPAIRS LUMP SUM 1.0 $ 2,500.00 $ 2,500.00 , 42 RESURFACE COATING, COMPLETE LUMP SUM 1.0 $ 2,500.00 $ 2,500.00 RNERWA[:K-DECOFFATNECONCRE7EREPAIRS DECORATIVE CONCRETE -REMOVE 8 REPLACE 1 43 LIGHT BASE N0 SF 24.0 $ 42.00 $ 1,008.00 , . DECORATIVE CONCRETE -REMOVE 8 REPLACE 2 44 LIGHT BASE N0 SF 24.0 $ 42.00 $ 1,008.00 , . DECORATIVE CONCRETE -REMOVE & REPLACE 3 45 LIGHT BASE N0 SF 24.0 $ 42.00 $ 1,008.00 , . DECORATIVE CONCRETE -REMOVE & REPLACE 4 46 LIGHT BASE N0 SF 24.0 $ 42.00 $ 1,008.00 , . DECORATIVE CONCRETE -REMOVE & REPLACE 5 47 LIGHT BASE N0 SF 24.0 $ 42.00 $ 1,008.00 , . DECORATIVE CONCRETE -REMOVE & REPLACE 48 SIGN BASE SF 4.0 $ 125.00 $ 500.00 , 49 ICE HARBOR PARK, SURFACE PATCH REPAIR EACH 5.0 $ 100.00 $ 500.00 LF 150 0 1 $ [AO $ 2,300.00 50 RIVERS EDGE PLAZA, REMOVE & REPLACE . , 0 480 $ 50 1 $ 720.00 51 RIVERWALK, NEW LF LF . 70.0 $ . 1.50 $ 105.00 52 RIVERWALK- STAIR 1, NEW LF 85.0 $ 1.50 $ 127.50 53 RIVERWALK -STAIR 2, NEW DECORATIVE CONCRETE, 8'"PAVEMENT -.SECTION REPAIRS .:'., -"; 54 8TH STREET, GRAND OPERA HOUSE, REMOVE 8 REPLACE SF 180.0 $ 2o.uu $ 3,600.00 TOWN CLOCK PLAZA, REMOVE TRENCH GRATE, REPLACE 0 $ 00 $ 55 980.00 1 55 DECORATIVE CONCRETE SF 36. . , ,;:MISCELLANEOUS. _ _, - LUMP SUM 1.0 $ , ' , 8,000.00 $ . 8,000.00 56 MOBILIZATION LUMP SUM 0 1 $ 2,500.00 $ 2,500.00 57 TRAFFIC CONTROL & SAFETY CONTROL . Base Bid Total S 211,242.35 BASE BID (%) OVER /UNDER (-) Contingency $ 21,100.00 Construction Engineering R Inspection $ 23,210.00 Total Construction Estimate: $ 255,552.35 BIDDER: TschiggTrie Excavating, Inc. BIDDER: PoRzen Construction, Inc. BID UNIT BID COST TOTAL COST BID UNIT BID COST TOTAL COST $ 85.00 $3,060.00 $ 100.00 $3,600.00 $ 2,900.00 $2,900.00 $ 6,300.00 $6.300.00 $ 2,200.00 $2,200.00 $ 3,900.00 $3,900.00 `- I $ 100.00 $2,400.00 $ 40.00 $960.00 l $ 100.00 $2,400.00 $ 40.00 $960.00 $ 100.00 $2,400.00 $ 40.00 $960.00 $ 100.00 $2,400.00 $ 40.00 $960.00 $ 100.00 $2,400.00 $ 40.00 $960.00 $ 400.00 $1,600.00 $ 28.00 $112.00 $ 300 00 500.00 $1 $ 165.00 $825.00 . , l }~~. $ 11.50 $13,225.00 $ 3.30 $3,795.OU $ 11.50 $5,520.00 $ 2.25 $1,080.00 $ 17.50 $1,225.00 $ 3.30 $231.00 $ 50 17 487.50 $1 $ 3.30 $280.50 . , $ 50 43 830.00 $7 $ 1b.u0 $3,240.00 . , $ 43 50 00 566 $1 $ 27.00 $972.00 . . , $ 17,000.00 $17,000.00 I $ 16,000.00 $18,WU.UO $ 3,500.00 $3,500.00 $ 7,000.00 $7,000.00 Bid Total $256,736.95 21.5 % Bid Total $ 269,622.10 27.6% Page 2 of 2