Loading...
Reeder and Lois St Sewer Project AcceptTHE CITY OF DLTB E Masterpiece can the Mississippi MEMORANDUM July 10, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Reeder and Lois Street Sanitary Sewer Project CIP 7101290: Reeder and Lois Street Storm Sewer City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Reeder and Lois Street Sanitary Sewer Project, as completed by WC Stewart Construction, Inc., in the final contract amount of $39,978.84, which is a 6.56% decrease from the original contract. concur with the recommendation and respectfully request Mayor and City Council approval. v / / ~ ~ ~~s Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer "THE C1T'Y OF DuB E Masterpiece an the Mississippi MEMORANDUM July 9, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Reeder and Lois Street Sanitary Sewer Project CIP 7101290: Reeder and Lois Street Storm Sewer INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Reeder and Lois Street Sanitary Sewer Project. BACKGROUND The Reeder and Lois Street Sanitary Sewer Project completely separated the sanitary sewer system from the storm sewer system. It involved the installation of storm and sanitary structures, pipe, pavement, and associated surface restoration. DISCUSSION The Reeder and Lois Street Sanitary Sewer Project was completed by WC Stewart Construction, Inc. of Dubuque, Iowa, in the final contract amount of $39,978.84, which is a 6.56% decrease from the original contract in the amount of $42,602.02. The decrease was due to removing the street repaving from the contract. During construction, Engineering determined that by removing additional pavement and performing some minor grading, the drainage of the street could be drastically improved. This work was incorporated into the Street Program. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $39,978.84 to the contractor for the Reeder and Lois Street Sanitary Sewer Project. BUDGET IMPACT The project cost summary for the Reeder and Lois Street Sanitary Sewer Project is as follows: Bid Award Construction Contract Contingency Engineering $42,602.02 4,407.53 6,611.30 Final $39,978.84 0 11,255.50 Total Project Cost $53,620.85 $51,234.34 The project funding summary is as follows: CIP No. Fund Description Fund Amount 7101290 Reeder and Lois Street Storm Sewer $33,150.00 7101289 Sanitary Sewer General Repairs $18,084.34 Total Project Funding $51,234.34 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $39,978.84 to the contractor for the Reeder and Lois Street Sanitary Sewer Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II ~. a RESOLUTION NO. 377-07 ACCEPTING THE REEDER AND LOIS STREET SANITARY SEWER PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Reeder and Lois Street Sanitary Sewer Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Manager recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Reeder and Lois Street Storm Sewer Capital Improvement Project and Sanitary Sewer General Repairs Capital Improvement Project appropriations for the contract amount of $39,978.84 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 16th day of July 007. . ~~~ Roy D. Buol, Mayor Att st: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE REEDER AND LOIS STREET SANITARY SEWER PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Reeder and Lois Street Sanitary Sewer Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $51,234.34. Dated this III day of 7u~~1 , 2007. C. -1.... Ci Engineer Filed in the office of the City Clerk on the/~~day o ~~ , 2007. nne F. Schneider, CMC, City Clerk THG CITY OF PROJECT CLOSE OUT FORM City of Dubuque DUBS., Engineering 50. W. 13th Street Mastzrpizce wt the Mississippi Pro)ect Nam@: REEDER AND LOTS STREET Dubuque, IA 52001 TORM SEWER 8 SANITARY SEWER RECONSTRUCTION PROJEC (563) 589-4270 CIP Number: CIP NO. 7101290 Project Contract Amount: $42,602.02 Pro ect Com letion Date: of-Jum07 Contractor Name: W.C. Stewart Construct, Inc. Contractor Address: 221 E. 6th Street city, State, Zip: Dubu ue, IA 52001 Contractor Tele hone: 563-5B8-4496 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE FINAL QUANTITY TOTAL PERCENT COMPLETE SANITARY SEWER 1 Exploratory Excavation 1.00 LS $ 600.00 1.00 $ 600.00 100.00% 2 Remove Existing Manhole w/ Compacted Granular Backfill 1.00 LS $ 750.00 1.00 $ 750.00 100.00 3 4B" Dia. Manhole Base w/ Bedding 8 Compacted Granular Backfill 1.00 EA $ 425.00 1.00 $ 425.00 100.00 % 4 48" Dia. Manhole Sidewall w/ Compacted Granular Backfill 6.40 VF $ 67.50 6.40 $ 560.00 100.00% 5 48' Dia. Manhole Base w/ Bedding 1.00 EA $ 425.00 1.00 $ 425.00 100.00% 6 48" Dia. Manhole Sidewalt 8.00 VF $ 85.00 8.00 $ 680.00 100.00% 7 60" Dia. Manhole Base w/ Bedding 1.00 EA $ 635.53 1.00 $ 635.53 100.00 8 60" Dia. Manhole Sidewall w! Flal Top 7.34 VF $ 183.70 7.34 $ 1,348.36 100.00% 9 Manhole Frame and Cover 1.00 EA $ 300.00 1.00 $ 300.00 100.00% 10 Manhole Frame and Cover -Bolt Down 2.00 EA $ 375.00 2.00 $ 750.00 100.00 11 Core Drill Manhole Base w/ Press Seal PSX: Direct Drive Boot - B" pipe 4.00 EA $ 300.00 4.00 $ 1,200.00 100.00 12 Core Drill Manhole Base w/ Press Seal PSX: Direct Drive Bool - 4" pipe 1.00 EA $ 175.00 1.00 $ 175.00 100.00% 13 8" DIP CI 51 w/ Polywrap 8 Bedding 50.00 LF $ 38.78 42.67 $ 1,654.74 85.34 14 4" PVC SDR-26 Lateral w/ Initial Backfill 5.00 LF $ 24.80 4.00 $ 99.20 80.00% 15 Bypass Pumping 1.00 LS $ 500.00 1.00 $ 500.00 100.00% Sub Total $ 10,102.83 STORM SEWER 16 12" DIP w/ Bedding 8 Compacted Granular Backfill Storm Sewer 50.00 LF $ 51.20 50.00 $ 2,560.00 100.00% 17 , CL III w/ Bedding & Compacted Granular Backfill 18" RCP Storm Sewer 59.10 LF $ 38.29 50.00 $ 1,914.50 84.60 18 , , Rock Excavation 45.94 CY $ 60.00 2.00 $ 120.00 4.35 19 CL III w/ Bedding 18" RCP Storm Sewer 88.25 LF $ 38.29 88.25 $ 3,379.09 100.00% 20 , , Remove 8 Replace Intake 101-B w/ Bedding 8 Compacted Granular Bac 2.00 EA $ 1,250.00 2.00 $ 2,500.00 100.00 21 Manhole Base w/ Bedding 8 Compacted Granular Backfill 48" Dia 1.00 EA $ 427.10 1.00 $ 427.10 100.00% 22 . Manhole Sidewall Compacted Granular Backfill 48" Dia 5.60 VF $ 87.50 5.60 $ 490.00 100.00% 23 . 48" Dia. Manhole Base w/ Bedding 1.00 EA $ 417.35 1.00 $ 417.35 100.00 24 Manhole Sidewall 4B" Dia 8.25 VF $ 85.00 8.25 $ 701.25 100.00 25 . Manhole Frame and Cover 1.00 EA $ 300.00 1.00 $ 300.00 100.00 26 Manhole Frame and Cover -Bolt Down 1.00 EA $ 375.00 1.00 $ 375.00 100.00 27 Tie into Existing Structure 3.00 EA $ 761.00 4.00 $ 3,044.00 133.33 28 Abandon Existing Storm Sewer Pipe 14.00 CY $ 90.00 10.00 $ 900.00 71.43 29 Remove Existing Manhole 1.00 LS $ 625.00 1.00 $ 625.00 100.00 SURFACE RESTORATION Sub Total $ 17,753.29 30 Crushed Stone Base - 8' 78.30 Ton $ 12.75 96.83 $ 1,234.58 123.67% 31 Full Depth Pavement Saw Cut 290.00 LF $ 3.00 160.00 $ 480.00 55.17 32 Remove & Replace 2.5' PC Concrete Curb and Gutter 35.00 LF $ 13.00 82.00 $ 1,066.00 234.29 33 , , Pavement Repair -ACC Binder - 4" 40.50 Ton $ 95.90 0.00 $ - 0.00 34 Pavement Repair -ACC Surface - 2' 20.25 Tan $ 95.90 0.00 $ - 0.00 % 35 6" Topsoil -provide 8 Spread 485.00 SY $ 3.00 970.00 $ 2,910.00 200.00 36 Mulch &ferilize Seed 20.00 SY $ 2.25 803.00 $ 1,806.75 4015.00 37 , Erosion Mal w/ Staples 465.00 SY $ 2.75 336.00 $ 924.00 72.26 % 3B Traffic and Safety Control 1.00 LS $ 925.00 0.00 $ - 0.00% Sub Total $ 8,421.33 Payment Totals $ - $ - $ 36,277.46 NO. DATE CHANGE ORDER DESCRIPTION TOTAL HANGE ORDE AMOUNT PREVIOUS TOTAL AMOUNT CURRENT PAY PERIOD AMOUNT TOTAL AMOUNT TO DATE PERCENT 1.00 14-Mar-07 Relocate Sanitary Sewer Lateral $ 724.33 $ 724.33 $ 724.33 100.00 2.00 6-Mar-07 Storm Sewer, 18" RCP, CL III w/ Bedding 8 Compacted Granular Backfill (77.75 feel) $ 2,977.05 $ 2,977.05 $ 2,977.05 100.00 3.00 20-Mar-07 DELETE BID ITEM #33: Pavement Repair -ACC Binder - 4" 4.00 20-Mar-07 DELETE BIO ITEM #34: Pavement Repair -ACC Surface - 2" t ~ owi i"nange vruur rrurR rmwm a ~ r r PROJECT COST SUMMARY Total Contract Work Performed to Date: $ 36,277.46 otal Change Order Work Performed to Date: S 3,701.38 Total Contract and Change Order Work Due Contractor: S 39,978.84 Total miscellaneous ProjeM Costs: $ Total Engineering Work Performed: $ 11,255.50 Total Land Acquisition and/or Easement Costs: $ TOTAL PROJECT COST: $ 51,234.34 1 hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager _ iet[y 3T~buque, Iowa The Undersigned, .contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: ~~'~ BY: Gus Psihoyos, City Enginee City of Dubuque, Iowa