Eagle Point Clear Well Rehabilitation ProjectTHE CTTY OF DUB" CJE MEMORANDUM Masterpiece on the Mississippi August 2, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project CIP 7401828 Water Department Manager Bob Green is recommending approval of the plans, specifications, form of contract and the estimated cost of $1,037,421 for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. I concur with the recommendation and respectfully request Mayor and City Council approval. ~Z Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager THE CITY OF DUB ..°~ E Masterpiece on the Mississippi MEMORANDUM August 2, 2007 TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project - CIP 740 1828 INTRODUCTION The attached Resolution is in reference to the Public Hearing on the Plans and Specifications Form of Contract for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. BACKGROUND The Eagle Point Water Plant provides the City with its potable water. After the water is treated and filtered it is stored in two clear wells located at the Water Plant before being pumped into the Water Distribution System. The west clear well was constructed in 1880 and has a storage capacity of 650,000 gallons. This clear well was built using large lime stone blocks for the floor and walls. A concrete roof was added several years later. Since its construction, the interior has received gunite treatment and several leak repairs. The east clear well was built in 1939 and has a capacity of 1,100,000 gallons. This clear well was constructed with a poured concrete floor, walls and exterior interface sidewall. DISCUSSION The scope of this project consists of many repairs to the east and west clear wells. They are as follows: East clear well: Epoxy injected to walls and roof cracks; repair partial depth spalls in roof; full depth repair of roof expansion joints; clean and paint roof openings. West clear well: New EPDM roof membrane; roof beam and stub wall removal; repair gunite lining and columns; new concrete stub wall, new double tee roof and concrete topping; new roof openings; epoxy coating sealant to the inner walls of west clear well. Clean and disinfect both clear well reservoirs for service. The interior coating to the west tank will take place under a separate contract immediately following the completion of the construction work to the tank. BUDGET IMPACT The estimate of probable cost for the Clear Well Rehabilitation Project is as follows: Construction Contract $ 794,050 Contingency 171,100 Construction Engineering & Inspection 62,000 1 % Origination Fee (.01 x SRF Amount) 10,271 Total Estimated Project Cost $1,037,421 The project will be funded through the Iowa Finance Authority State Revolving Loan Fund (City Water Department CIP Fund Code 740 1.828). RECOMMENDATION I am recommending that the City Council adopt the Resolution approving the Plans, Specifications, Form of Contract and the Estimated Cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. ACTION TO BE TAKEN The City Council is requested to approve the Resolution adopting the Plans, Specifications, Form of Contract and the Estimated Cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. BG:ve Attachments cc: Jenny Larson, Budget Director Jeanne Schneider, City Clerk File RESOLUTION NO. 421-07 EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR REHABILITATION PROJECT APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR REHABILITATION PROJECT. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project, in the estimated amount of $1,037,421, are hereby approved. Passed, adopted and approved this 6th day of August , 2007. Roy D, Buol, Mayor Attest: Jeanne F. Schneider, City Clerk ~r1 c /~ / _i THE CITY OF > ~a g~~ ~'`-~~ DUB E MEMORANDUM Masterpiece on the Mississippi July 10, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project - C I P 7401828 Water Department Manager Bob Green is recommending initiation of the public bidding procedure for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project and that a public hearing be set for August 6, 2007. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM July 10, 2007 TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager ~~ SUBJECT: Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project - CIP 7401828 INTRODUCTION: The enclosed Resolutions authorize the public bidding procedure for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project. BACKGROUND: The Eagle Point Water Plant provides the City with its potable water. After the water is treated and filtered it is stored in two clear wells located at the Water Plant before being pumped into the water distribution system. The west clear well was constructed in 1880 and has a storage capacity of 650,000 gallons. This clear well was built using large lime stone blocks for the floor and walls. A concrete roof was added several years later. Since its construction, the interior has received gunite treatment and several leak repairs. The east clear well was built in 1939 and has a capacity of 1,100,000 gallons. This clear well was constructed with a poured concrete floor, walls and roof and exterior interface side wall. OBJECTIVE: The main objective of this project is the rehabilitation and improvements to both clear wells. The east clear well needs interior repairs for leaks in the floor, walls, roof and to the exterior interface roof/wall. The west clear well needs roof replacement and roof/walls interface repairs. Additional improvements will include interior coating of the west clear well immediately after the structure has been repaired and completion to its transmission pipes for improved flows for compliance with EPA standards. PROJECT SCHEDULE: The schedule for the project is as follows: Initiate Public Bidding Process July 16, 2007 Publish Notice to Bidders, Advertise for Bids July 20, 2007 Publish Public Hearing Notice on Plans 8~ Specifications July 20, 2007 Public Hearing on Plans & Specifications August 6, 2007 Pre-bid Construction Conference August 10, 2007 Receipt of Bid Proposals (Bid letting) August 22, 2007 Award Construction Contract September 4, 2007 Project Completion Date May 23, 2008 RECOMMENDATION: It is recommended that the City Council give preliminary approval to the construction plans and specifications for the Eagle Point Water Plant Clear Well Reservoir - Rehabilitation Project, and to establish the date of August 6, 2007 for the public hearing and hereby authorize the City Clerk to advertise for bid proposals. BUDGET IMPACT: The estimate of probable cost for the Clear Well Rehabilitation project is summarized as follows: Estimate: Construction Contract $ 794,050 Contingency 171,000 Construction Engineering & Inspection 62,500 1 % origination fee (.01 x SRF amount) 10,271 Total Estimated Rehabilitation Cost Including Coating $1,037,421 The interior coating to the west tank will take place under a separate contract immediately following completion of the construction walls to this tank. The following summary is as follows: Funding for this project will be secured through the Iowa Finance Authority State Revolving Loan Fund. CIP NO. FUND DESCRIPTION FUND AMOUNT 7401828 Clear Well Rehabilitation Project $1,037,421 ACTION TO BE TAKEN: The City Council is requested to establish the date of the Public Hearing and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed Resolutions. Prepared by Bob Green, Water Department Manager cc: Jenny Larson, Budget Director Ken TeKippe, Finance Director File RESOLUTION NO. EAGLE POINT WATER PLANT CLEARWELL RESERVOIR REHABILITATION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Eagle Paint Water Plant Clear Well Rehabilitation Project, in the estimated amount $1,037,421, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. a public hearing will be held on the 6th day of August, 2007, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or againsf the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Eagle Point Water Plant Clear Well Rehabilitation Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 22nd day of August, 2007. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at the public hearing at 6:30 p.m. on the 4th day of September, 2007, in the Public Library Auditorium, 360 West 11th Street, Dubuque, Iowa. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project, CIP 7401828 The scope of this project consists of many repairs to the east and west clear wells. They are as follows: East clear well: Epoxy inject walls and roof cracks; repair partial depth spalls in~oof; full depth repair of roof expansion joints; clean and paint roof openings. West clear well: New EPDM roof membrane; roof beam and stub wall removal; repair gunite lining and columns; new concrete stub -wall, new double tee roof and concrete topping; new roof openings; epoxy coating sealant on the inner walls of west clear well. Clean and disinfect both clear well reservoirs for service. Pre-Bid Construction Conference. Each prospective bidder is encouraged to attend the Pre-Bid Construction Conference to be held at 2:00 PM on August 10, 2007, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, July 20, 2007. NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT EAGLE POINT WATER PLANT CLEAR WELL RESERVOIR REHABILITATION PROJECT Time and Place for Filin4 Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on August 22, 2007, in the Office of the City Clerk, City Hall -First Floor, 50 West 13t Street, Dubuque, Iowa. Time and Placed Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on August 22, 2007, at City Hall -Conference Room B, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on September 4, 2007. The City of Dubuque, Iowa, reserves the'right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by May 23, 2008. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10%) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state- chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the plans and specifications may be obtained from Veenstra and Kimm, Inc., 3000 Westown Parkway, West Des Moines, Iowa 50266, phone (515) 225-8000, upon deposit of $25.00 per set. No refund will be made. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE EAGLE POINT WATER PLANT CLEARWELL RESERVOIR REHABILITATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Eagle Point Water Plant Clear Well Reservoir Rehabilitation Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 16th day of July, 2007, in the Public Library Auditorium, 360 West 11th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The scope of this project consists of many repairs to the east and west clear wells. They are as follows: East clear well: Epoxy inject walls and roof cracks; repair partial depth spalls in roof; full depth repair of roof expansion joints; clean and paint roof openings. West clear well: New EPDM roof membrane; roof beam and stub wall removal; repair gunite lining and columns; new concrete stub wall, new double tee roof and concrete topping; new roof openings; epoxy coating sealant on the inner walls of west clear well. Clean and disinfect both clear well reservoirs for service. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the day of , 2007. Jeanne F. Schneider, CMC, City Clerk Passed, adopted and approved this day of , 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk