Loading...
Five Flags Sidewalk ReplacementTHE CITY OF ~`U~B E MEMORANDUM Masterpiece can the. Mississippi August 2, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Five Flags Sidewalk and Lighting Replacement Project CIP 1001179 -Five Flags Sidewalk Replacement CIP 1021608 -Downtown Street Light Replacement Sealed bids were received for the Five Flags Sidewalk and Lighting Replacement Project. City Engineer Gus Psihoyos recommends award of the contract to the low bidder, Portzen Construction, Inc., in the amount of $179,937.65, which includes $173,667.65 for the Base Bid and $6,270.00 for the Alternate Bid for Traffic Signal Installation. The project is $44,437.65 over budget. Additional funds will come from savings in Fiscal Year 2007 construction projects and the Fiscal Year 2008 street construction program. I concur with the recommendation and respectfully request Mayor and City Council approval. C- ,/, ~w. ~~ / ~~,.. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer ~rHe crrY or DUB E Masterpiece on the Mississippi MEMORANDUM August 1, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ~, SUBJECT: Five Flags Sidewalk and Lighting Replacement Project CIP 1001179 -Five Flags Sidewalk Replacement CIP 1021608 -Downtown Street Light Replacement INTRODUCTION The enclosed resolutions authorize the award of the construction contract for the Five Flags Sidewalk and Lighting Replacement Project. BACKGROUND The current sidewalks adjacent to the Five Flags Civic Center, along 4th Street, Stn Street and Locust Street are scheduled to be replaced. The Five Flags sidewalk along Main Street was replaced as part of the Historic Old Main Street -Lighting and Sidewalk Replacement Project. DISCUSSION This project provides for the complete reconstruction of the existing sidewalk and pedestrian access curb ramps with a standard gray-colored main walk section and a brick red stamped parkway area to match the historic downtown sidewalk streetscape standard along the curb. In conjunction with the sidewalk replacement, the project will also include the installation of historic street lighting along with the upgrade and replacement of traffic signalization poles and equipment at the 5th and Locust intersection. Due to the extended lead time required for ordering the historic street light and traffic related equipment, the City has purchased the new historic street light and traffic signalization equipment under a separate contract and the contractor shall provide a cost for the installation of the equipment. BID RESULTS Sealed bids were received on the project on July 31, 2007. Portzen Construction, Inc. of Dubuque, IA submitted the low base bid in the amount of $173,667.65. This amount is 9.5% over the revised estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Base Bid Portzen Construction, Inc. $173,667.65 Tschiggfrie Excavating, Inc. $207,286.55 Alternate 1 $6,270.00 $19,500.00 Total Bid $179,937.65 $226,786.55 During the development of the final plans and specifications the engineer's estimate needed to be revised to take into account recent bids for concrete sidewalk and additional electrical items. The original estimate was $140,000.00 (Base Bid plus Alternate Bid - Traffic Signal Installation). The revised engineer's estimate is $163,544.50 (Base Bid plus Alternate Bid -Traffic Signal Installation) which is $23,544.50 over the preliminary engineers estimate. RECOMMENDATION I recommend that the contract be awarded to Portzen Construction, Inc. in the amount of $179,937.65 -Base Bid of $173,667.65, plus Alternate Bid (Traffic Signal Installation) of $6,270.00 for the Five Flags Sidewalk and Lighting Replacement Project. PROJECT COST -BUDGET IMPACT The revised estimate of probable costs for the Five Flags Sidewalk and Lighting Replacement Project is summarized as follows: Construction Contract Base Bid (Sidewalks and Lighting) Bid Alternate (Traffic Signal Installation) Historic Street Light Fixtures (City Provided) Contingency Construction Engineering & Inspection Total Project Cost $135,000 $ 158,544.50 $5,000 5,000.00 $22,000 $13,500 $22,000 $197,500 22,000.00 15,000.00 25,000.00 Award (Base Bid + Alternate 1) $173,667.65 6,270.00 22,000.00 15,000.00 25,000.00 $225,544.50 $241,937.65 The project funding summary is as follows: Preliminary CIP No. Fund Description Funding 1001179 5-Flags Sidewalk Replacement $100,000 1001918 3rd Street Overpass Light Replacement Project -Savings $30,000 1021608 Downtown Street Light Replacement $25,000 2501615 Traffic Signal Intersection Reconstruction $19,500 1021609 Fiber Optic Conduit -Private Subdivisions & Misc. Projects $10,500 3001953 FY 2008 Street Construction Program $10,000 7201008 Storm Sewer Improvements $2,500 FY 2007 Sales Tax Construction -Savings Preliminary Revised Estimate Estimate Fund Amount 95,000.00 30, 000.00 26,302.69 29,003.51 6,431.39 20,516.59 34,683.47 Total Project Funding $197,500 $241,937.65 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolutions awarding the Five Flags Sidewalk and Lighting Replacement Project to Portzen Construction, Inc. in the amount of $179,937.65 (base bid plus Alternate 1 -Traffic Signal Installation). Prepared by Robert Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Gil Spence, Leisure Services Manager David Ness, Civil Engineer RESOLUTION NO. 422-07 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE FIVE FLAGS SIDEWALK AND LIGHTING REPLACEMENT PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Five Flags Sidewalk and Lighting Replacement Project, in the estimated amount $225,544.50, are hereby approved. Passed, adopted and approved this 6th day of August 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 423-07 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE FIVE FLAGS SIDEWALK AND LIGHTING REPLACEMENT PROJECT Whereas, sealed proposals have been submitted by contractors for the Five Flags Sidewalk and Lighting Replacement Project (the Project) pursuant to Resolution No. 393-07 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 16th and 20th days of July, 2007. Whereas, said sealed proposals were opened and read on the 31st day of July, 2007 and it has been determined that Portzen Construction, Inc. of Dubuque, Iowa, with a bid in the amount of $179,937.65 -Base Bid of $173,667.65, plus Alternate Bid (Traffic Signal Installation) of $6,270.00, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Portzen Construction, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 6th day of August , 2007. Roy D. Buol, Mayor Attest: Jeanne F, Schneider, CMC, City Clerk CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: Five Flags Sidewalks and Lighting Replacement Project BID DATE: July 31, 2007 BID ITEM DESCRIPTION UNIT QUANTITY UN TICOST ESCIOMATE BASE BID: ` DEMOt.1T10N 3'-REMOVAL` t PC Concrete Sidewalk, Remove & Dispose SF 9130 $1.00 $9,130.00 z PC Concrete Pavement Remove & Dispose SF 720 $1.00 $720.00 3 PC Concrete Curb and Gutter Remove 8 Dispose LF 360 $5.00 $1,800.00 a Existing Street Light Remove & Salvage Each 4 $500.00 $2,000.00 5 Traffic Signal Pole 8 Head Remove & Salvage Each 4 $500.00 $2,000.00 s Traffic Controller Remove 8 Salvage Each 1 $750.00 $750.00 7 Tree Removal Each 5 $500.00 $2,500.00 a Existing Tree Grates Remove 8 Salvage Each 9 $200.00 $1,800.00 EXCAVATION 8 STONE' s Backfill, Limestone Ton 300 $6.00 $1,800.00 70 Graded Stone Base. 3/4" Ton 225 $15.00 $3,375.00 PAVEMENT' _,.-.~ ~,M., t t HMA 300k Surface Course, 1/2" (PG 64-22) Ton 31 $150.00 $4,650.00 t2 PC Concrete Curb and Gutter, 2.5', Construct t3 PC Concrete Sidewalk, 4" Integral Brick Red, 4' Wide Stamped LF SF 360 920 $20.00 $7.50 $7,200.00 $6,900.00 to PC Concrete Sidewalk 4" Integral Brick Red 5' Wide Stamped SF 2035 $7.50 $15,262.50 t5 PC Concrete Sidewalk, 6" Integral Brick Red 5' Wide Stamped is PC Concrete Sidewalk, 4" Standard Grav Broom Finish SF SF 150 4919 $7.50 $5.50 $1,125.00 $27,054.50 t7 PC Concrete Sidewalk, 6" Standard Gray Broom Finish SF 644 $6.00 $3,864.00 to PC Concrete Driveway, 7" Standard Gray Broom Finish SF 462 $6.50 $3,003.00 is PC ConcreteACCess Ramp, Detectable Each 4 $200.00 $800.00 ELECTfIiiCAL - LiGHTiNG zo Historic Street Light Installation w/ Precast Concrete Foundation Each 6 $1,200.00 $7,200.00 2t Historic Intersection Street Light Installation w/ Precast Conc Found Each 2 $1,600.00 $3,200.00 22 Relocated Street Light Installation w/Precast Conc. Foundation Each 1 $1,200.00 $1,200.00 23 Lighting Cabinet Installation w/Precast Concrete Foundation Each 1 $1,200.00 $1,200.00 24 2" SCH 40 PVC, Trenched LF 850 $10.00 $8,500.00 zs Electrical Cable, #10 XHHW 2s Electrical Cable, #8 XHHW LF LF 1205 945 $0.70 $0.80 $843.50 $756.00 27 Electrical Cable, #6 XHHW 2e Pull Box, Standard Gray 11"x18" LF Each 2750 1 $1.10 $600.00 $3,025.00 $600.00 -TRAFFIC-SIGNAL'S zs Traffic Signal Pedestal -Precast Foundation New Each 3 $1,000 00 $3,000.00 3o Traffic Control Cabinet -Precast Concrete Foundation Each 1 $2,000.00 $2,000.00 3t 2" SCH 40 PVC, Trenched LF 50 $10.00 $500.00 32 2" HDPE Conduit, Bored 33 4" SCH 40 PVC, Trenched LF LF 215 56 $18.00 $22.00 $3,870.00 $1,232.00 34 4" HDPE Conduit, Bored LF 108 $30.00 $3,240.00 35 Pull Box, Standard Gray, 11"x18" Each 1 $600.00 $600.00 38 Pull Box, Standard Gray 17"x30" Each 1 $700.00 $700.00 BIDDER: Portzen Construction BID BID UNIT COST COST $ 1.25 $ 11,412.50 $ 1.00 $ 720.00 $ 2.00 $ 720.00 $ 600.00 $ 2,400.00 $ 600.00 $ 2,400.00 $ 1,200.00 $ 1,200.00 $ 200.00 $ 1,000.00 $ 800.00 $ 7,200.00 i $ 7.50 $ 2,250.00 S 15.00 $ 3,375.00 $ 110.00 $ 3,410.00 $ $ 25.00 10.50 $ $ 9,000.00 9,660.00 $ 10.50 $ 21,367.50 $ 10.75 $ 1,612.50 $ 6.40 $ 31,481.60 $ 6.75 $ 4,347.00 $ 6.95 $ 3,210.90 $ 275.00 $ 1,100.00 $ 925.00 $ 5,550.00 $ 1, 050.00 $ 2,100.00 $ 1,100.00 $ 1,100.00 $ 1,1zs.oo $ 1,1zs.oo $ 7.25 $ 6,162.50 $ 1.30 $ 1,566.50 $ 1-60 $ 1,512.00 $ 1.50 $ 4,125.00 $ 525.00 $ 525.00 $ 825.00 $ 2,475.00 $ 1,250.00 $ 1,250.00 $ 9.00 $ 450.00 $ 17.00 $ 3,655.00 $ 9.80 $ 548.80 $ 25.00 $ 2,700.00 $ 525.00 $ 525.00 $ 650.00 $ 650.00 BIDDER: Tschigafrie Excavating BID BID UNIT COST COST $ 3.50 $ 31,955.00 $ 5.25 $ 3,780.00 $ 3.00 $ 1,080.00 $ 450.00 $ 1, 800.00 $ 300.00 $ 1,200.00 $ 350.00 $ 350.00 $ 425.00 $ 2,125.00 $ 150.00 $ 1,350.00 S 7-30 $ 2,1 ~_ =r~_ _$ 13.35 $ -- - $ 142.00 $ 4,402.OU $ 19.20 $ 6,912.00 $ 10.95 $ 10,074.00 $ 10.95 $ 22,283.25 $ 11.25 $ 1,687.50 $ 6.60 $ 32,465.40 $ 6.95 $ 4,475.80 $ 7.10 $ 3,280.20 $ 263.00 $ 1,052.00 $ 1383.x0 $ 8,1u8.u0 $ 1,810.00 $ 3,620.00 $ 1,726.00 $ 1,726.00 $ 1,314.00 $ 1,314.00 $ 7.20 $ 6,120.00 $ 1.35 $ 1,626.75 $ 1.70 $ 1,606.50 $ 1.55 $ 4,262.50 $ 528.00 $ 528.00 $ 1,478A0 $ 4,434.00 $ 1,601.00 $ 1,601.00 $ 8.80 $ 440.00 $ 20.90 $ 4,493.50 $ 10.65 $ 596.40 $ 25.15 $ 2,716.20 $ 528.00 $ 528.00 $ 678.00 $ 678.00 Bitl Tabulation Sheet 1 of 2 CITY OF DUBUQUE -ENGINEERING DIVISION -BID TABULATION SHEET BID TABULATION FOR: Five Flags Sidewalks and Lighting Replacement Project BID DATE: July 31, 2007 BIDDER: Portzen Construction BIDDER: Tschiaafrie Excavating UNIT I TE E BID ITEM DESCRIPTION QUANTITY UNT COST COST UNIBCOST COST I UNIT COST COST -FIBER OPTICS 37 4" SCH 40 PVC, Trenched LF 277 $22 $6,094.00 $ 9.80 $ 2,714.60 $ 10.65 $ 2,950.05 3s 4" HDPE Conduit, Bored LF 45 $32 $1,440.00 $ 34.25 $ 1,541.25 $ 24.55 $ 1,104.75 39 Pull Box, Standard Gray, 17"x30" Each 1 $700 $700.00 $ 650.00 $ 650.00 $ 678.00 $ 678.00 MISCELLANEOUS ao Sawcut,Pavement-Regardless of Type LF 360 $3.50 $1,260.00 $ 5.00 $ 1,800.00 $ 4.15 $ 1,494.00 at Parking Meter Past, Remove & Install Each 12 $150.00 $1,800.00 $ 125.00 $ 1,500.00 $ 160.00 $ 1,920.00 sz Sign Post, Remove & Install Each 9 $150.00 $1,350.00 $ 175.00 $ 1,575.00 $ 140.00 $ 1,260.00 a3 Tree Preservation Measures LS 1 $500.00 $500.00 $ 500.00 $ 500.00 $ 1,200.00 $ 1,200.00 as Erosion Control LS 1 $1,000.00 $1,000.00 $ 1,500.00 $ 1,500.00 $ 1,700.00 $ 1,700.00 as Traffic Control & Safety Control LS 1 $2,000.00 $2,000.00 $ 2,000.00 $ 2,000.00 $ 1,850.00 $ 1,850.00 as Mobilization LS 1 $5,000.00 $5,000.00 $ 6,000.00 $ 6,000.00 $ 13,075.00 $ 13,075.00 Bid Sub-Total 5158,544.50 Contingency $15,854.45 Construction Engineering & Inspection $26,159.84 Total Construction Estimate: $200,558.79 BASE BID (%) OVER /UNDER (-): BiD ALTERNATE 1 -TRAFFIC SIGNALS ' tr Traffic~nal Equipment Installation LS 1 $ 5,000.00 $5,000.00 ALTERNATE NO. 1 TOTAL: 55,000.00 ALTERNATE BID (%) OVER /UNDER (-): Bid sub-total 5173,667.65 era s~~roral $207,286.55 9.5% I % Under/Over 30.7% $6,270.00 $6,270.00 $19,500.00 $19,500.00 Deduct-Total 56,270.00 519,500.00 25.4% 290.0 Bid Tabulation Sheet 2 of 2