Loading...
Curb Access Ramps Phase 4 Acceptance Copyright 2014 City of Dubuque Consent Items # 10. ITEM TITLE: Curb Access Ramps Phase 4 Acceptance SUMMARY: City Manager recommending acceptance of the Asphalt Overlay Project — Curb Access Ramps Phase Four, as completed by Midwest Concrete, Inc. RESOLUTION Accepting the Asphalt Overlay Project Curb Access Ramps Phase Four and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ Acceptance of Curb Access Ramps Phase 4-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Asphalt Overlay Project - Curb Access Ramps Phase Four (CIP 30012277) DATE: December 8, 2014 City Engineer Gus Psihoyos is recommending acceptance of the Asphalt Overlay Project — Curb Access Ramps Phase Four, as completed by Midwest Concrete, Inc., in the final contract amount of$57,118.94, which was 8.34% over the contract amount of $54,214.00. The increased cost was due to the topography of the area. All sidewalks were installed to achieve the proper slopes mandated by the Public Right of Way Accessibilities Guidelines. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF r Dubuque DV L All•AmericaCitY 11111! Masterpiece on the Mississii 1p i TO: Michael C. VanMilligen, City Manager FROM: Gus Psihoyos, City Engineer X__ ;" SUBJECT: Asphalt Overlay Project - Curb Access Ramps Phase Four (CIP 30012277) DATE: December 8, 2014 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Asphalt Overlay Project - Curb Ramps Phase Four. BACKGROUND The purpose of this project was to replace twenty defective access ramps in conjunction with the Public Works Asphalt Overlay Program at three intersections plus offer better access where it was non-existent before: • Hill Street and West Third Street. • Burch Street and Hill Street. • The signalized crossing at 5t" Street. • Adding six new ramps at the islands where University Avenue and Hill Street converge. DISCUSSION The Asphalt Overlay Project - Curb Access Ramps Phase Four received one bid from Midwest Concrete, Inc. with a bid of$54,214.00. The bid was 7.8% higher than the Engineers estimate. The Asphalt Overlay Project - Curb Access Ramps Phase Four was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of $57,118.94 which is 8.34% over the contract amount of $54,214.00. The average cost per ramp was $3,198.45. The project cost increase was due to the topography of the area. All sidewalks were installed to achieve the proper slopes mandated by the Public Right of Way Accessibilities Guidelines (PROWAG) standards. All ramps were completed within the contract time and now offer ten additional access points along the Hill Street corridor. The W 3"' Street intersection now has dual ramps on all four corners and the intersection University Avenue and Hill Street has six new ramps through the islands where no ramps existed before, allowing new access to all citizens attempting to cross at University Avenue and Hill Street. BUDGETIMPACT The project cost summary for the Asphalt Overlay Project - Curb Access Ramps Phase Four is as follows: Award Final Construction Contract $54,214.00 $57,118.94 Contingency $5,421.40 0.00 Construction Engineering & Inspection $8,945.31 7,149.98 Total Project Cost 1L8,5Q0.71 4 2 The funding summary for the project is as follows: CIP Fund Description Fund Amount 30012277 Asphalt Overlay Project Curb Access Ramps Phase One $64,268.92 Total Project Funding $64.268.92 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the Asphalt Overlay Project - Curb Access Ramps Phase Four. Prepared By: Tom Kopp, Engineering Technician cc: Don Vogt, Public Works Director John Klostermann, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 RESOLUTION NO. 381-14 ACCEPTING THE ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PHASE FOUR AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Asphalt Overlay Project Curb Access Ramps Phase Four (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Asphalt Overlay Project Curb Access Ramps appropriations for the contract amount of $57,118.94, less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 15th day of December, 2 4. Attest: Trish L. Gleason, Assistant City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PHASE FOUR The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Asphalt Overlay Project Curb Access Ramps Phase Four, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $62,268.92. Dated this Jam"41-' day of .baca434-2014. Gus Psihoyos, City " gineer Filed in the office of the City Clerk on the I�j'" day of ..bar -..c...64,1-2014. Trish L. Gleason, Assistant City Clerk