Loading...
Fiber Optics Conduit System Phase ITHE CITY OF DLTB CTE Masterpiece can the Mississippi MEMORANDUM August 14, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fiber Optic Conduit System -Phase I (Municipal Services Center, Fire Stations, Transit, and Housing) (CIP 540815/2901537: Municipal Services Center Fiber Optic Conduit) (CIP 010A06/1001063: Fiber Optic System for Fire Stations) (CIP 050217/6001218: Fiber Optic Connections for Transit) (CIP 010285/1001017: Fiber Optic Conduit Project) City Engineer Gus Psihoyos is recommending acceptance of the Fiber Optic Conduit System - Phase I Project, as completed by Volkens Excavating, Inc., in the final contract amount of $219,666.25. I concur with the recommendation and respectfully request Mayor and City Council approval. Vie,, ~ ;~' Mi hael C. Va Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM August 14, 2007 TO: Michael C. Van Milligen, City Manage~r~ FROM: Gus Psihoyos, City Engineer ~~~, -J' SUBJECT: Fiber Optic Conduit System -Phase I (Municipal Services Center, Fire Stations, Transit, and Housing) (CIP 540815/2901537: Municipal Services Center Fiber Optic Conduit) (CIP 010A06/1001063: Fiber Optic System for Fire Stations) (CIP 050217/6001218: Fiber Optic Connections for Transit) (CIP 010285/1001017: Fiber Optic Conduit Project) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Fiber Optic Conduit System - Phase I Project. BACKGROUND This project linked the City Annex to the Municipal Services Center with a fiber optic conduit. It also tied Fire Station #3 (32"d and Central), Fire Station #4 (University at Grandview), Transit (24th and Central), and Housing (18th and Central) into the City's fiber optic network. DISCUSSION The Fiber Optic Conduit System - Phase I Project was completed by Volkens Excavating, Inc. of Dyersville, Iowa, in the final contract amount of $219,666.25, which is a 0.84% decrease from the original contract in the amount of $221,531.00. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $219,666.25 to Volkens Excavating, Inc. for the Fiber Optic Conduit System - Phase I Project. BUDGET IMPACT The project cost summary for the Fiber Optic Conduit System - Phase I Project is as follows: Award Final Construction Contract $221,531.00 $219,666.25 Contingency 23,087.45 0 Construction Engineering & Inspection 38,094.29 9,988.25 Total Project Cost $282,712.74 $229,654.50 This project funding can be broken down into four distinct categories: 1. CIP 540815/2901537: Municipal Services Center Fiber Optic Conduit. Award Final Construction $115,206.00 $114,341.25 Contingency 12,789.55 0 Engineering 21,102.76 5,239.42 Total Project Cost $149,098.31 $119,580.67 The project will be funded from the remainder of Fiscal Year 2003 CIP 540815/2901537 budget appropriation for the Municipal Services Center Fiber Optics in the amount of $64,894. The remaining $54,686.67 will be financed from the Fiscal Year 2004-2005 CIP 010285/1001017, Fiber Optic Conduit Project. 2. CIP 010A06/1001063: Fiber Optic System for Fire Stations. Award Final Construction $65,968.00 $65,968.00 Contingency 6,532.40 0 Engineering 10,778.46 2,974.32 Total Project Cost $84,278.86 $68,942.32 The project will be funded from the remainder of Fiscal Year 2004-2005 CIP 010A06/1001063 budget appropriation for Fiber Optic System for Fire Stations in the amount of $42,033.51. The remaining $26,908.81 will be financed from Fiscal Year 2004-2005 CIP 010285/1001017 Fiber Optic Conduit Project. 3. CIP 050217/6001218: Fiber Optic Connections for Transit. Award Final Construction $23,221.50 $23,221.50 Contingency 2,220.25 0 Engineering 3,663.41 1,047.00 Total Project Cost $29,105.16 $24,268.50 The project will be funded from the Fiscal Year 2004 CIP 050217/6001218 budget appropriation (City match dollars) for Fiber Optic Connections -Transit Office in the amount of $20,680.00 The remaining $3,588.50 will be financed from Fiscal Year 2004-2005 CIP 010285/1001017 Fiber Optic Conduit Project. 4. CIP 010285/1001017: Fiber Optic Conduit Connection to Housing Dept. Award Construction Contingency Engineering Total Project Cost $16,135.50 1, 545.25 2,549.66 $20,231.41 Final $16,135.50 0 727.51 $16,863.01 The project will be funded from the Fiscal Year 2004-2005 CIP 010285/1001017 Fiber Optic Conduit Project in the amount of $16,863.01. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $219,666.25 to Volkens Excavating, Inc. for the Fiber Optic Conduit System -Phase 1 Project. Prepared by David Ness, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director David Harris, Housing & Community Development Director Chris Kohlmann, Information Services Manager Jon Rodocker, Transit Manager Dan Brown, Fire Chief David Ness, PE RESOLUTION NO. 431-07 ACCEPTING THE FIBER OPTIC CONDUIT SYSTEM - PHASE I PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Fiber Optic Conduit System - Phase (Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Manager recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the CIP 540815/2901537: Municipal Services Center Fiber Optic Conduit, CIP 010A06/1001063: Fiber Optic System for Fire Stations, CIP 050217/6001218: Fiber Optic Connections for Transit, and CIP 010285/1001017: Fiber Optic Conduit Project appropriation for the contract amount of $219,666.25 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 20th day of August, 2007. Atte . Roy D. Buol, Mayor Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FIBER OPTIC CONDUIT SYSTEM - PHASE I PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Fiber Optic Conduit System - Phase I Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $229,654.50. Dated thisG~ day of , 2007. Gus Psihoyos City Engineer Jeane F. Schneider, CMC, City Clerk City of Dubuque -Council Final Project Name: Fiber Optic Conduh System Phase 1 Date: 8N4/2007 CIP #1140-tilli,010.A00,060-217,010-086 Contractor : Corttractor: Volkens Inc Contract Amount: $221,531.00 hem # hem Unh Bld Unh Quanthy Cost 1 4" HDPE Bored (with 4-1" HDPE inside) + 2" HDPE Bored to LF 307 321.00 2 4" HDPE Bored (with 4-1" HDPE inside) LF b594 51a.so 3 4" HDPE Trenched (with 4-1"HDPE inside) + p"HDPE LF tz2 515.00 4 4" HDPE Trenched (with 4-1" HDPE inside) LF 454 Sto.oo 5 Type 2 Hand-hole Installed Each 15 51,000.00 6 Fiber Vault Installed Each a 52,500.00 7 Rail Crossing LF 99 S25.o0 8 PCC Sidewalk, 4", Remove and Construct SF tsoo 67.so 9 Traffic Control LS.. 1 Sf.ooo.oa Total QTY Amount Eamed QTY Amount Eamed ThIa Period ThIs Period To Date To Date 0.00 50.00 491.00 510,311.00 0.00 j0.00 8,199.00 5151,661.50 a.oo So.oo o.oo So.oo 0.00 Eo.00 460.00 54,600.00 o.oo So.oo 15.00 515,000.00 0.00 60.00 7.00 517,500.00 0.00 50.00 145.00 53,625.00 0.00 50.00 2,126.50 515,948.75 o.oo o.o0 1.00 61,000.00 So.oo $219666.2 TOTAL AMOUNT DUE CONTRACTOR $219 886.2 ENGINEERING: =9,888.2 TOTAL CONSTRUCTION COST $229,654.b CERTIFICATE OF THE CITY MANAGER: APPROVED: Michael Vary~ill' n, City onager City of pgbt~ ,Iowa APPROVED:~.J/J~ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Volkens Excavating Inc contractor for the above improvement, does hereby accept the above 'Total Due Contractor', as full settlement for all claims for said improvement. CONTRACTOR: Volkens Excavatin I BY: TITLE: i .t DATE: ~ '~ ~- O City of Dubuque -Council Final Project Name: Fiber Optic Conduk Syatem Phase 1 CIP M540-815,010•A08,050-217,010-085 Contractor : Contractor: Volkens Inc ttem S kem Unk Bid Unk quantity Coat 1 4" HDPE Bared (with 4-1"HDPE inside) + 2" HDPE Bored to LF 307 521 00 2 4"HDPE Bored (with 4-1"HDPE inside) LF 85s4 . Sta so 3 4" HDPE Trenched (with 4-1"HDPE inside) + 2"HDPE LF 122 . S15 oo 4 4"HDPE Trenched (with 4-1"HDPE inside) LF a54 . Sto oo 5 Type 2 Hand-hole Installed Each 1s . 51 oao oo 6 Fiber Vault Installed Each s , . Sz soo a6 7 6 Rail Crossing " LF 99 , . 525.00 PCC Sidewalk, 4 , Remove and Construct SF tsoo 57 50 9 Traffic Control LS _ 1 St.ooO.oo Total Date: 8!14/2007 Contract Amount: 5221,531.00 QTY Amount Eamed OTY Amount Eamed Thia Period Thia Period To Date To Date o.oo so.oo 491.00 51o,3tt.oo 0.00 50.00 8,199.00 5151,681.50 a.oo So.oo 0.09 so.oo 0.00 $0.00 460.00 54,600.00 0.00 50.00 15.00 515,000.00 0.00 50.00 7.00 517,500.00 0.00 50.00 115.00 33,625.00 0.00 50.00 2,126.50 515,948.75 o.oo o.o0 1.0o St,ooo.oa So.oo $219666.2 TOTAL AMOUNT DUE CONTRACTOR S219 886.2 ENGINEERING: :9,988.2 TOTAL CONSTRUCTION COST 5229,654.5 CERTIFICATE OF THE CITY MANAGER: APPROVED: Michael Van Mill' Manager CRy of , e, Iowa APPROVED: , /' Gus Psihoyos, Cky Engineer , City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Volkens Excavating Inc contractor for the above improvement, does hereby accept the above 'Total Due Contractof', as full settlement far all claims for said improvement. CONTRACTOR: Volkens Excav in BY: TITLE: ~ /` ~ DATE: c7 '"~ ~ -C~ 7 City of Dubuque -Council Final Project Name: Fiber Optic Conduit System Phase 1 Date: 8/74/2007 CIP #640-816,010-A06,060-217,010-085 Contractor :Contractor: Volkens Inc Contract Amount: 5221,b31.00 hem # hem Unh Bid Unh Quantity Coat 1 4" HDPE Bored (with 4-1" HDPE inside) + 2" HDPE Bored to LF 307 S2t oa 2 4" HDPE Bored (with 4-1" HDPE inside) LF 8594 . 518 50 3 4"HDPE Trenched (with 4-1"HDPE inside) + 2" HDPE LF t22 . fts oo 4 4"HDPE Trenched (with 4-1" HDPE inside) LF 454 . Sto oo 5 Type 2 Hand-hole Installed Each is . St 000 aO 6 Fiber Vault Installed Each a , . 52 500 00 7 Rail Crossing LF 99 , . 5zs oo 8 PCC Sidewalk, 4", Remove and Construct SF tsoo . 57 50 9 Traffic Control LS t . St.oao.oo Total pTY Amount Eamed pTY Amount Eamed This Period Thls Period To Date To Date 0.00 50.00 491.00 $10,311.00 0.00 So.00 ~ 8,199.00 5151,681.50 0.00 50.00 0.00 50.00 o.oo So.oo 460.00 f4,6oo.00 0.00 50.00 15.00 515,000.00 0.00 50.00 7.00 (17,500.00 o.aa So.o9 t4s.oo 53,62s.oo 0.00 50.00 2,126.50 515,948.75 a.9o o.oo t.oa St,9ao.oo 30.00 $219666.2 TOTAL AMOUNT DUE CONTRACTOR $218 888.2 ENGINEERING: $9988.2 TOTAL CONSTRUCTION COST $229 864.b CERTIFICATE OF THE CITY MANAGER: APPROVED: Michael Van Milligen, pager City of Dubu e,f APPROVED: ~~ Gus Psihoycs, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Volkens Excavatinu Inc contractor for the above improvement, does hereby accept the above "Total Due ConVactot", as full settlement for all claims for said improvement. CONTRACTOR: Volkens Excavatin Inc. BY: TITLE: !~ DATE: ~-/~-C~