POD Recognition Wall AcceptanceTHE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM August 28, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Port of Dubuque Recognition Wall Project (CIP: 7001517 -Port of Dubuque Visitor Amenities) City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Port of Dubuque Recognition Wall Project, as completed by Tricon General Construction in the final contract amount of $155,880.55, which is a 5.3% increase from the original contract in the amount of $148,000.00. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~. ~~ :~~-- Mic ael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM August 27, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer . SUBJECT: Port of Dubuque Recognition Wall Project (CIP: 7001517 -Port of Dubuque Visitor Amenities) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract of the Port of Dubuque Recognition Wall Project. BACKGROUND The Port of Dubuque Recognition Wall Project is located on the landward side of the floodwall adjacent to the American Trust River's Edge Plaza and architecturally displays and recognizes the organizations and individuals who provided leadership and financial support to the America's River project. The Recognition Wall Project was created to recognize the donors and partners of those who have provided funding for the America's River projects. The architectural elements and construction materials used in the final design compliment the in-place directional monument at the intersection of Third and Bell Street. The architectural aluminum panels incorporate a panoramic digitally-generated river scene image. As one gets closer to the recognition wall, the names which will be digitally overlayed on the river scene image become more visible. The Riverwalk is directly adjacent to this section of existing floodwall which displays the Recognition Wall Project which will be viewed by those using the American Trust River's Edge Plaza as well as by those using the Riverwalk southerly landside access ramp. DISCUSSION The Port of Dubuque Recognition Wall Project has been completed by Tricon General Construction of Dubuque, Iowa, in the final contract amount of $155,880.55, which is a 5.3% increase from the original contract in the amount of $148,000.00. The reason for the cost increase was due to additional work to incorporate a concrete cap along the top of the floodwall which significantly improved the appearance of the wall by covering up the chipped and deteriorated top edge of the floodwall. Additional work was also required to relocate an existing sanitary sewer manhole. RECOMMENDATION I recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $155,880.55 to Tricon General Construction. BUDGET IMPACT The project cost summary for the Port of Dubuque Recognition Wall Project is as follows: Estimate Bid Award Final Construction Contract $142,200.00 $148,000.00 $155,880.55 Contingency 14,220.00 14,220.00 Construction Engineering & Inspection 17,770.00 17,770.00 11,273.78 Project Cost Sub-Total $174,190.00 $179,990.00 $167,154.33 Other Project Related Costs: Consultant -Architectural Services Design Photography McNamer Construction A&G Electric Nauman Nursery McDermott Excavating Manders Quality Concrete Total Project Cost The project funding summary is as follows: 4,231.20 1,110.52 11,755.00 1,109.72 1,851.20 1,704.16 14,694.00 $203,610.13 CIP No. Fund Description Amount 7001517 Port of Dubuque Visitor Amenities $180,000.00 Greater Downtown TIF 10,000.00 3001630 Decorative Concrete Maintenance Program 13,610.13 Total Project Funding $203,610.13 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $155,880.55 to Tricon General Construction. Prepared by Robert Schiesl, Assistant City Engineer cc: Cindy Steinhauser, Assistant City Manager Jenny Larson, Budget Director RESOLUTION NO. 445-07 ACCEPTING THE PORT OF DUBUQUE RECOGNITION WALL PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Port of Dubuque Recognition Wall Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Port of Dubuque Visitor Amenities Fund, the Decorative Concrete Maintenance Program Fund, and the Greater Downtown TIF Funds for the contract amount of $155,880.55 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of September 007. Roy D. Buol, Mayor Attest: anne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE PORT OF DUBUQUE RECOGNITION WALL PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Port of Dubuque Recognition Wall Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $203,610.13. Dated this 27th day of August , 2007. Gus Psihoyos City Engineer Filed in the office of the City Clerk on the 27th day of August , 2007 Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: January 30, 2007 PROJECT NAME: PORT OF DUBUQUE RECOGNITION WALL PROJECT CONTRACTOR: TRICON GENERAL CONSTRUCTION CONTRACT AMOUNT: $148,000.00 BID ITEM DESCRIPTION UNIT UN T OST (TO DATE AMOTO DATE NED BASE BID -GENERAL CONSTRUGT~N 1 For all labor, materials, egiupment and administration to furnish and install all work in accordance with the contract documents. BID ALTERNATE NO. 4 - LANDSGAPlNG' 2 For all labor, materials, egiupment and administration to furnish Lump Sum $ 148,000.00 1.00 $ 148,000.00 and install all work in accordance with the contract documents. Lump Sum DELETED TOTAL AMOUNT EARNED TO DATE -BASE BID ITEM(S ): $ 148,000.00 CHANGE ORDER - E)cTRA WORK fTEIiA(S) 3 Additional Concrete Cap Along Top of Floodwall, Riverside Lump Sum $ 5,180.97 1.00 $ 5,180.97 4 Sanitary Sewer Manhole Relocation Lump Sum $ 2,692.57 1.00 $ 2,692.57 5 Sanitary Sewer Manhole, Clean Sand Backfill Lump Sum $ 2,692.57 1.00 $ 1,138.16 6 Full Size Color Mock-Up of Digital Image Lump Sum $ 986.85 1.00 $ 986.85 7 Saw Cut Pavement, 6" PC Concrete Lump Sum $ 1,144.00 1.00 $ 1,144.00 8 Barricades 8 Safety Fencing Lump Sum $ 449.00 1.00 $ 449.00 9 Credit -Decorative Concrete Pavement Not Removed Lump Sum $ (1,745.00) 1.00 $ (1,745.00) 10 Credit -Temporary Pavement Surface Not Installed Lump Sum $ (1,966.00) 1.00 $ (1,966.00) TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 7,880.55 TOTAL AMOUNT EARNED TO DATE: 5 155,880.55 TOTAL DUE CONTRACTOR: Consultant -Architectural Design Services Design Photography McNamer Construction A8~G Electric Nauman Nursery McDermott Excavating Menders Quality Concrete Construction Engineering 8 Inspection TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: $ 155,880.55 $ 4,231.20 $ 1,110.52 $ 11,755.00 $ 1,109.72 $ 1,851.20 $ 1,704.16 $ 14,694.00 $ 11,273.78 5 203,610.13 APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa CERTIFICATE OF THE CITY APPROVED: 7`"-/ A Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, TRICON GENERAL CONSTRUCTION contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: TRICON GENERAL CONSTRUCTION BY: Y~ F TITLE: OWn~~ DATE: ~ • ~ O -07 City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: January 30, 2007 PROJECT NAME: PORT OF DUBUQUE RECOGNITION WALL PROJECT CONTRACTOR: TRICON GENERAL CONSTRUCTION CONTRACT AMOUNT: $148,000.00 BID ITEM DESCRIPTION UNIT UN T COST (TO DATE AMO O DATENED sAS~ sID - GENERAL coNSl`RUCTIOM 1 For all labor, materials, egiupment and administration to furnish and install all work in accordance with the contract documents. Lump Sum $ 148,000.00 1.00 $ 148,000.00 BID ALTERNATE NV: i - tANDSCAPINCa 2 For all labor, materials, egiupment and administration to furnish and install all work in accordance with the contract documents. Lump Sum DELETED TOTAL AMOUNT EARNED TO DATE -BASE BID ITEM(S ): $ 148,000.00 ... ..CHANGE QFtDER -EXTRA WORK ITEM(S) 3 Additional Concrete Cap Along Top of Floodwall, Riverside Lump Sum $ 5,180.97 1.00 $ 5,180.97 4 Sanitary Sewer Manhole Relocation Lump Sum $ 2,692.57 1.00 $ 2,692.57 5 Sanitary Sewer Manhole, Clean Sand Backfill Lump Sum $ 2,692.57 1.00 $ 1,138.16 6 Full Size Color Mock-Up of Digital Image Lump Sum $ 986.85 1.00 $ 986.85 7 Saw Cut Pavement, 6" PC Concrete Lump Sum $ 1,144.00 1.00 $ 1,144.00 8 Barricades 8 Safety Fencing Lump Sum $ 449.00 1.00 $ 449.00 9 Credit -Decorative Concrete Pavement Not Removed Lump Sum $ (1,745.00) 1.00 $ (1,745.00) 10 Credit -Temporary Pavement Surface Not Installed Lump Sum $ (1,966.00) 1.00 $ (1,966.00) TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 7,880.55 TOTAL AMOUNT EARNED TO DATE: $ 155,880.55 TOTAL DUE CONTRACTOR: Consultant -Architectural Design Services Design Photography McNamer Construction A8G Electric Nauman Nursery McDermott Excavating Menders Quality Concrete Construction Engineering 8, Inspection TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa CERTIFICATE OF THE CITY APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: $ 155,880.55 $ 4,231.20 $ 1,110.52 $ 11,755.00 $ 1,109.72 $ 1,851.20 $ 1,704.16 $ 14,694.00 $ 11,273.78 $ 203,610.13 The undersigned, TRICON GENERAL CONSTRUCTION contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: TRICON GENERAL CONSTRUCTION BY: ~` TITLE: ~ DATE: ~ , ~O . t77