University Ave Culvert Extension AcceptanceTHE CTTY OF DUB E Masterpiece on the Mississippi MEMORANDUM September 6, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: University Avenue Culvert Extension (CIP 7201811) and University Avenue Sanitary Sewer Reconstruction (CIP 7101805) City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of $416,126.25, which is a 14.38% increase from the original contract in the amount of $363,808.28. The increase was mainly due to change orders to address issues discovered during construction. It is further recommended that the City Council authorize payment to Tschiggfrie Excavating Co. in the amount of $416,126.25. Additional funds are available from savings from other sanitary sewer projects. I concur with the recommendation and respectfully request Mayor and City Council approval. ~j, ~~~"~~ ~l ~ -~ Michael C. Van Mi igen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CTTY OF DUB E Masterpiece on tlTe Mississippi Engineering Department City Hall 50 W. 13th Street Dubuque,lowa 52001 563.589.4270 563.589.4205 (fax) www.cityofdubuque.org September 12, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: University Avenue Culvert Extension (CIP 7201811) and University Avenue Sanitary Sewer Reconstruction (CIP 7101805) INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project. BACKGROUND The University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project provided for the construction of a 12-foot by 12-foot box culvert under University Avenue, the extension of the box culvert constructed as part of the grading for the University Avenue Extension Project. The project also relocated the 24-inch diameter sanitary sewer necessary for the University Avenue (roadway) Extension Project. On June 5, 2006, the City Council awarded the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project to the low bidder, Tschiggfrie Excavating Co. of Dubuque, Iowa. DISCUSSION Tschiggfrie Excavating Co. has completed the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project in the final contract amount of $416,126.25, which is a 14.38% increase from the original contract in the amount of $363,808.28. The increase was mainly due to change orders to address issues discovered during construction. The major issues were: 1) During construction an old concrete bridge abutment was uncovered. Unfortunately, its removal was necessary for the construction of the culvert. This increased the project cost by $15,651.63. 2) An additional $9,267.94 was for a concrete encasement of the sanitary sewer near the creek. 3) An additional $8,800 was expended to excavate through rock. 4) The original $16,000 engineering estimate was based on design only. 11 should have included additional for engineering inspection during construction. This additional project cost was $37,276.25. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $416,126.25 to the contractor for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project. PROJECT COST -BUDGET IMPACT When the project was awarded, it was set to be funded with: University Avenue Culvert Extension Project (CIP 7201811) $ 225,000.00 University Avenue Sanitary Sewer Reconstruction Project CIP 7101805 $ 148,500.00 Fiscal Year 2008 Street Program (CIP 3001953) $ 17,224.00 Fiscal Year 2008 Storm Sewer General Repairs (CIP 7201008) $ 32,070.28 Fiscal Year 2008 Storm Sewer Improvements/Extension Pro~ect (CIP 7201008 $ 30,000.00 Total Project Funding $ 452,794.28 The project cost summary for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project is as follows: Bid Award Final Construction Contract $363,808.28 $416,126.25 Paving Change Order to Horsfield 37,375.00 30,586.33 Contingency 35,611.00 0 Engineering 16,000.00 53,276.25 $452,794.28 $499,988.83 The project will be funded by: University Avenue Culvert Extension Project (CIP 7201811) $ 225,000.00 FY07 Budget Amendment No. 2 (720 funds to 7201811) $ 32,133.00 University Avenue Sanitary Sewer Reconstruction Project CIP 7101805 $ 148,500.00 FY07 Budget Amendment No. 2 (710 funds to 7101805) $ 46,045.00 Fiscal Year 2008 Street Program (CIP 3001953) $ 17,224.00 Fiscal Year 2008 Storm Sewer Improvements/Extension Pro~ect CIP 7201008 $ 31,086.83 Total Project Funding $ 499,988.83 The $32,070.28 that was originally identified from the General Storm Sewer Repair fund was covered with savings from other stormwater management projects. The FY07 Budget Amendment No. 2 transferred $32,133.00 into the project fund. Additional funds for the project came from savings from other sanitary sewer projects. With the FY07 Budget Amendment No. 2, $46,045.00 was transferred to the project. This is reflected in the table above. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions to accept the improvements and to authorize the payment of the contract amount of $416,126.25 to the contractor for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE UNIVERSITY AVENUE CULVERT EXTENSION AND SANITARY SEWER RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $416,126.25. Dated this ~ day o ~~007. City Engineer Filed in the office of the City Clerk on the ~i~~'day o a~G~007. J anne F. Schneider, CMC, City Clerk RESOLUTION NO. 465-07 ACCEPTING THE UNIVERSITY AVENUE CULVERT EXTENSION AND SANITARY SEWER RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the University Avenue Culvert Extension and Sanitary Sewer Reconstruction Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Manager recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the University Avenue Culvert Extension, University Avenue Sanitary Sewer Reconstruction, Fiscal Year 2008 Street Program, and Fiscal Year 2008 Storm Sewer Improvements/Extensions, appropriations for the contract amount of $416,126.25 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 17th day of september, 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk _~ THEC:RY OF J FINAL PROJECT COST City of Dubuque DUB E Engineering 50. W. 13th Street Project Name: UNIVERSITY AVENUE CULVERT AND SANITARY SEWER EXTENSION Dubuque, IA 52001 Masterpiece un Nre Mississippf (563)589-4270 CIP Number: 7201611 s 7toleos Project Contract Amount: $363,eoa.2e Project Com letion Date: Jw 3, zoo? Contractor Name: Tschi Erie Exravatin Co COntraCtOr Addre55: 425 Julien Dubu ue Drive Clty, State, Zlp: Dubu ue, IA 52003 Contractor Tele hone: 563-557-7450 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT QUANTITY TOTAL COMPLETE TOTAL Over /Under 1 Cleadn and Grvbbin 1 LS $ 5 500.00 1 $ 5,500.00 100.00 % $ - 2 To soil Furnish and S read 490 CY $ 11.65 490 $ 5 708.50 100.00 % $ - 3 Removal of Existin Structure 1 LS $ 5,980.80 1 $ 5 980.80 100.00 % $ - 4 Removal of Pavement 806 SY $ 2.00 806 $ t 612.00 100.00 % $ - 5 Structural Concrete RCB Culvert 284.3 CY $ 432.25 292 $ 126,217.00 102.71 % $ 3,328.33 6 Reinforcin Steel 43413 LBS $ 0.65 47838 $ 31 094.70 110.19 % $ 2,876.25 7 Subdrain Lon itudinal 41n. Dia. 354 LF $ 6.05 354 $ 2,141.70 100.00% $ - 8 Remove Salva a and Reinstall of Guardrail 77 LF $ 12.75 37 $ 471.75 48.05 % $ (510.00) 9 En ineenn Fabric 209 SY $ 3.10 558 $ 1,729.80 266.99% $ 1,081.90 10 Revetment ClassE 164 TON $ 17.35 346.23 $ 6,007.09 211.12% $ 3,761.69 11 Erosion Stone 89 TON $ 17.35 116.02 $ 2 012.95 130.36 % $ 468.80 12 Plu Existin Culven 1 LS $ 92.15 t $ 92.15 100.00 % $ - 13 24" MJ OI - Plu 1 EA $ 1 103.10 1 $ 1 103.10 100.00 % $ - 14 Limestone Backfill 5700 TON $ 7.15 5306.27 $ 37 939.83 93.09 % $ (2,815.17) 15 Sanity Sewer Manhole Base 48" ID 5 EA $ 758.00 5 $ 3 790.00 100.00 % $ - 16 Sanity Sewer Manhole Base 72" ID 1 EA $ 1,408.45 1 $ 1,408.45 100.00 % $ - 17 Sanity Sewer Manhole Sidewall 48" ID w/ ste 5 50 VF $ 129.05 52 $ 6 710.60 104.00 % $ 258.10 18 Sanity Sewer Manhole Sidewall 72" ID w/ste s 10 LF $ 262.30 10 $ 2 623.00 100.00 % $ - 19 Sanifa Sewer Manhole Rin /Cover 48" ID 5 EA $ 330.35 5 $ 1,651.75 100.00 % $ - 20 Sanity Sewer Manhole Flat To w/ Rin !Cover 72" ID 1 EA $ 707.75 1 $ 707.75 100.00 % $ - 21 12" DIP Class 51 36 LF $ 54.60 36 $ 1,965.60 100.00 % $ - 22 18" DIP Class 51 50 LF $ 70.60 50 $ 3 530.00 100.00 % $ - 23 24" DIP Class 51 457 LF $ 113.05 457 $ 51,663.85 100.00 % $ - 24 24" x 12" DIP WYE 1 EA $ 6 873.45 1 $ 6 873.45 100.00 % $ - 25 12" DIP - 22 1/2° Bend 1 EA $ 250.55 2 $ 501.10 200.00 % $ 250.55 26 12" DIP - 11 1/4° Bentl 1 EA $ 250.55 1 $ 250.55 100.00 % $ - 27 Connect to Existin Sanifa S stem 3 EA $ 2 269.35 3 $ 6,808.05 100.00 % $ - 28 Plu Abandoned Sanity Sewer 18" 24" 3 EA $ 333.45 3 $ 1,000.35 100.00 % $ - 29 Remove Plu /FiIVExistin Manhole 2 EA $ 381.00 2 $ 722.00 100.00% $ - 30 Connect to Existin Water Main 3 EA $ 590.90 3 $ 1 772.70 100.00 % $ - 31 Remove Waterrnain 80 LF $ 9.85 80 $ 788.00 100.00% $ - 32 8" DIP Watermain Class 52 80 LF $ 29.25 80 $ 2 340.00 100.00 % $ - 33 8" Valve and Sleeve/Cou tin 1 EA $ 1 505.90 1 $ 1 505.90 100.00 % $ - 34 Seed Fertilize and Mulch 2980 SY $ 1.00 3750 $ 3 750.00 125.84 % $ 770.00 35 Silt Fence Install and Remove 625 LF $ 2.00 464 $ 928.00 74.24 % $ (322.00) 36 Erosion Control 1 LS $ 1940.75 1 $ 1940.75 100.00% $ - 37 Fiber Conduit Falsework Su ort 1 LS $ 3 134.50 1 $ 3 134.50 100.00 % $ - 38 Construction Stakin 1 LS $ 2 930.00 1 $ 2 930.00 100.00 % $ - 39 Remove and Install Field Fence 75 LF $ 3.50 75 $ 262.50 100.00 % $ - 40 Safe Closure 2 EA $ 300.00 2 $ 600.00 100.00% $ - 47 Fence Chain Link 72 in. Hei ht On Wall 95 LF $ 45.00 95 $ 4 275.00 100.00 % $ - 42 4" HDPE Trenched with 4-1" HDPE inside 695 LF $ 27.00 695 $ 18,765.00 100.00 % $ - 43 Fiber O tics Junction Vault Precast Concrete 5 EA $ 2 309.30 5 $ 11 546.50 100.00 % $ - Pa ment Totals $ 372,356.72 $ 8,548.44 NO. DATE CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT PERCENT 5-Od-O6 Rock Exgvation $ 6,800.00 100.00 5-Oci-06 Concrete Encasement $ 9,267.94 100.00 5-Od-O6 Seal Manhole $ 1,447.50 100.00% 5-Oct-06 Abutment Removal $ 13,297.13 100.00 15-Dec-O6 Removal of Rubble from Existing Abutment Removal $ 2,354.50 100.00 1 SDec-O6 Fiber Vault No. S Installation $ 1.945.25 100.00 15-Dec-O6 Water Main Test $ 204.02 100.00 15-Dec-O6 Install New Guard2il $ 4,400.00 100.00 15-Dec-O6 Plowable Mortar $ 2,053.19 100.00% Total han a Order Work Performed to Date: 43,769.53 There was a typing ertor in Change Order No. 1 for the total cost for Concrete Encasement. The total on the change order was $9,267.96. The pay requests reflect the correct unit costs and total. ~ PROJECT COST SUMMARY ~ Contract Work Performed to Date: Change Order W ork Pertortned to Date: Contract and Change Order Work Due Contractor: miscellaneous Project Costs: Engineedng Work Performed: Land Acquisition andlor Easement Costs: $ 372,356.72 $ 43,769.53 I S 416.126.251 I hereby certify that the above statement shows, in detail, the cortect amount of all work required to complete the above improvement. APPROVED: Michael illigen, City Ma ager dy of Dubuque, Iowa '1 Gus Psihoyos. City Engineer City of Dubuque, Iowa The Undersigned, ' ~ ~~ c~~' ~ `~' ,contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims For said improvement. ~ APPROVED:: ISC~~9tq~~~- ~XG6~4~"19 ~~ T~ THECRY OF FINAL PROJECT COST City of Dubuque -- Engineering E DUB 50. W. 13th Street Project Name: UNIVERSITY AVENUE CULVERT AND SANITARY SEWER EXTENSION DUbUQUe, IA 52001 Mnstcrpiece on the Mississippi (563)589-4270 CIP Number: 7zot611 a 71o1ao5 Project Contract Amount: $363,aoe.2s Project Com letion Date: Jul 3, 2007 Contractor Name: Tschi trie Excavatin Co Contractor Address: 425 Julien Dubu ue Drive City, State, Zip: Dubu ue, IA 52003 Contractor Tele hone: 563-557-7450 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT QUANTITY TOTAL COMPLETE TOTAL Over I Under 1 Cleadn and Grubbin 1 LS $ 5,500.00 1 $ 5,500.00 100.00 % $ - 2 To soil Furnish and S read 490 CY $ 11.65 490 $ 5,708.50 100.00 % $ - 3 Removal of Existin Structure 1 LS $ 5,980.80 1 $ 5,980.80 100.00 % $ - 4 Removal of Pavement 806 SY $ 2.00 806 $ 1 612.00 100.00 % $ - 5 Structural Concrete RCB Culvert 284.3 CY $ 432.25 292 $ 126,217.00 102.71 % $ 3,328.33 6 Reinforcin Steel 43413 LBS $ 0.65 47838 $ 31 094.70 110.19 % $ 2,876.25 7 Subdraln Lon itudinal 41n. Dia. 354 LF $ 6.05 354 $ 2,141.70 100.00% $ - 8 Remove Salva a and Reinstall of Guardrail 77 LF $ 12.75 37 $ 471.75 48.05 % $ (510.00) 9 En ineedn Fabric 209 SY $ 3.10 558 $ 1,729.80 266.99% $ 1,081.90 10 Revetment ClassE 164 TON $ 17.35 346.23 $ 6,007.09 211.12% $ 3,161.69 11 Erosion Stone 89 TON $ 17.35 116.02 $ 2 012.95 130.36 % $ 468.80 12 Plu Existin Culvert 1 LS $ 92.15 1 $ 92.15 100.00 % $ - 13 24" MJ DI - Plu 1 EA $ 1,103.10 1 $ 1 103.10 100.00 % $ - 14 limestone Backfill 5700 TON $ 7.15 5306.27 $ 37 939.83 93.09% $ (2,815.17) 15 Sanity Sewer Manhole Base 48" ID 5 EA $ 758.00 5 $ 3,790.00 100.00 % $ - 16 Sanity Sewer Manhole Base 72" ID 1 EA $ 1 408.45 1 $ 1,408.45 100.00 % $ - 17 Sanity Sewer Manhole Sidewall 48" ID w/ ste s 50 VF $ 129.05 52 $ 6 710.60 104.00 % $ 258.10 18 Sanity Sewer Manhole Sidewall 72' ID w/sle s 10 LF $ 262.30 10 $ 2 623.00 100.00 % $ - 19 Sanity Sewer Manhole Rin !Cover 48" ID 5 EA $ 330.35 5 $ 1,651.75 100.00 % $ - 20 Sanity Sewer Manhole Flat To w/ Rin /Cover 72" ID 1 EA $ 707.75 1 $ 707.75 100.00 % $ - 21 12" DIP Class 51 36 LF $ 54.60 36 $ 1,965.60 100.00 % $ - 22 18" DIP Class 51 50 LF $ 70.60 50 $ 3,530.00 100.00 % $ - 23 24" DIP Class 51 457 LF $ 113.05 457 $ 51,663.85 100.00 % $ - 24 24" x 12" DIP WYE 1 EA $ 6,873.45 1 $ 6 873.45 100.00 % $ - 25 12" DIP - 22 1 /2° Bend 1 EA $ 250.55 2 $ 501.10 200.00 % $ 250.55 26 12" DIP - 11 1/4° Bend 1 EA $ 250.55 1 $ 250.55 100.00 % $ - 27 Connect to Existin Sanity S stem 3 EA $ 2,269.35 3 $ 6,808.05 100.00 % $ - 28 Plu Abandoned Sanity Sewer 18", 24" 3 EA $ 333.45 3 $ 1,000.35 100.00 % $ - 29 Remove Plu /Fill/6cistin Manhole 2 EA $ 361.00 2 $ 722.00 100.00 % $ - 30 Connect to Existin Water Main 3 EA $ 590.90 3 $ 1 772.70 100.00 % $ - 31 Remove Watennain 80 LF $ 9.65 80 $ 788.00 100.00% $ - 32 8" DIP Watermain Class 52 80 LF $ 29.25 80 $ 2,340.00 100.00 % $ - 33 8" Valve and Sleeve/Cou tin 1 EA $ 1 505.90 1 $ 1,505.90 100.00 % $ - 34 Seed Fertilize and Mulch 2980 SY $ 1.00 3750 $ 3,750.00 125.84 % $ 770.00 35 Silt Fence Install and Remove 625 LF $ 2.00 464 $ 926.00 74.24 % $ (322.00) 36 Erosion Control 1 LS $ 1,940.75 1 $ 1,940.75 100.00% $ - 37 Fiber Conduit Falsework Su ort 1 LS $ 3,134.50 1 $ 3,134.50 100.00% $ - 38 Construction Stakin 1 LS $ 2,930.00 1 $ 2,930.00 100.00 % $ - 39 Remove and Install Field Fence 75 LF $ 3.50 75 $ 262.50 100.00 % $ - 40 Safet Closure 2 EA $ 300.00 2 $ 600.00 100.00 % $ - 41 Fence, Chain Link 72 in. Hei hl On Wall 95 LF $ 45.00 95 $ 4,275.00 100.00 % $ - 42 4" HDPE Trenched with 4-1" HDPE inside 695 LF $ 27.00 695 $ 18,765.00 100.00 % $ - 43 Fiber O tics Junction Vault Precast Concrete 5 EA - $ 2 309.30 5 $ 11 546.50 100.00 % $ - Pa ment Totals $ 372,356.72 $ 8,548.44 NO. DATE CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT PERCENT 5-Oct-O6 Rock Excavation $ 8,800.00 100.00 5-Oct-O6 Concrete Encasement $ 9,267.94 100.00 5-Oct-O6 Seal Manhole $ 1,447.50 100.00 5-Ocl-O6 Abutment Removal $ 13,297 13 100.00 15-Dec-O6 Removal of Rubble from Existing Abutment Removal $ 2,354.50 100.00 15-Dec-06 Fiber Vault NO.5lnstallalion $ 1,945.25 100.00% 15-Dec-O6 Water Main Test $ 204.02 100.00 15-Dec-O6 Install New Guardrail $ 4,400.00 100.00 15-Dec-06 Plowable Mortar $ 2,053.19 100.00 Total Change Order Work Performed to Date: $ 43,769.53 There was a typing enor in Change Order No. 1 for the total cost for Concrete Encasement. The total on the change order was $9,267.96. The pay requests reflect the correct unit costs and total. PROJECT COST SUMMARY Total Contract Work Performed to Date: $ 372,356.72 Total Change Order Work Performed to Date: $ 43,769.53 Contract and Change Order Work Due Contractor: ~ $ 416.'126.25 miscellaneous Project Costs: Engineering Work Performed: Land Acquisition antllor Easement Costs: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: an tgen~City Manager r~~, ~) City of Dubuque, Iowa Gus Psihoyos, City Engineer City of Dubuque. Iowa The Undersigned, Scan ~ e. ,contractor for the above improvement, does hereby accept t e above 'Total Due Contractor", as full settlement for all cl(a~ims fors{aid improvement. .[~_ /' APPROVED: SG- `~ SS / , `~ i"`~ ~r/~t r'^( t-J THE CITY OF FINAL PROJECT COST City of Dubuque !` Engineering E DuB 50. W. 13th Street PFOjeCt Name: UNIVERSITY AVENUE CULVERT AND SANITARY SEWER EXTENSION DUbUQUe, IA 52001 Mrrsterpiece un the Mississippi (563)589-4270 CIP Number: 7201811 & 7101605 Project Contract Amount: $363,808.28 Pf0-ect COm letion Date: Jul 3, 2007 Contractor Name: Tschi fde Excavatin Co Contractor Address: 425 Julien Dubu ue Drive city, State, Zip: Dubu ue, IA 52003 Contractor Tele hone: 563-557-7450 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT OUANTITY TOTAL COMPLETE TOTAL Over I Under 1 Cleadn and Grubbin 1 LS $ 5,500.00 1 $ 5,500.00 100.00% $ - 2 To soil Furnish and S read 490 CY $ 11.65 490 $ 5 708.50 100.00 % $ - 3 Removal of 6cistin Structure 1 LS $ 5,980.80 1 $ 5 980.80 100.00 % $ - 4 Removal of Pavement 806 SY $ 2.00 806 $ 1 612.00 100.00 % $ - 5 Structural Concrete RCB Culven 284.3 CY $ 432.25 292 $ 126,217.00 102.71 % $ 3,328.33 6 Reinforoin Steel 43413 LBS $ 0.65 47838 $ 31094.70 110.19% $ 2,676.25 7 Subdrain Lon itutlinal 41n. Dia. 354 LF $ 6.05 354 $ 2,141.70 100.00% $ - 8 Remove Salva a and Reinstall of Guardrail 77 LF $ 12.75 37 $ 471.75 48.05 % $ (510.00) 9 En ineertn Fabdc 209 SY $ 3.10 558 $ 1 729.80 266.99% $ 1,061.90 10 Revetment Class E 164 TON $ 17.35 346.23 $ 6,007.09 211.12 % $ 3,161.69 11 Erosion Stone 89 TON $ 17.35 116.02 $ 2 012.95 130.36 % $ 468.80 12 Plu Existin Culvert 1 LS $ 92.15 1 $ 92.15 100.00 % $ - 13 24" MJ DI - Plu 1 EA $ 1 103.10 1 $ 1 103.10 100.00 % $ - 14 Limestone Backfill 5700 TON $ 7.15 5306.27 $ 37,939.63 93.09% $ (2,815.17) 15 Sanity Sewer Manhole Base 48" ID 5 EA $ 758.00 5 $ 3,790.00 100.00 % $ - 16 Sanity Sewer Manhole Base 72"ID 1 EA $ 1,408.45 1 $ 1,408.45 100.00% $ - 17 Sanity Sewer Manhole Sidewall 48" ID w/ ste s 50 VF $ 129.05 52 $ 6,710.60 104.00 % $ 258.10 18 Sanity Sewer Manhole Sidewall 72" ID wlste s 10 LF $ 262.30 10 $ 2,623.00 100.00 % $ - 19 Sanity Sewer Manhole Rin /Cover 48" ID 5 EA $ 330.35 5 $ 1,651.75 100.00 % $ - 20 Sanity Sewer Manhole, Flat To w/ Rin /Cover 72" ID 1 EA $ 707.75 1 $ 707.75 100.00 % $ - 21 12" DIP Class 51 36 LF $ 54.60 36 $ 1,965.60 100.00 % $ - 22 18" DIP Class 51 50 LF $ 70.60 50 $ 3,530.00 100.00 % $ - 23 24' DIP Class 51 457 LF $ 113.05 457 $ 51,663.85 100.00 % $ - 24 24" x 12" DIP WYE 1 EA $ 6,873.45 1 $ 6,873.45 100.00 % $ - 25 12" DIP - 22 1/2° Bend 1 EA $ 250.55 2 $ 501.10 200.00% $ 250.55 26 12" DIP - 11 1/4° Bend 1 EA $ 250.55 1 $ 250.55 100.00 % $ - 27 Connect to Exislin Sanity S stem 3 EA $ 2 269.35 3 $ 6,808.05 100.00 % $ - 28 Plu Abandoned Sanity Sewer l8" 24" 3 EA $ 333.45 3 $ 1,000.35 100.00% $ - 29 Remove Plu /FiIVExistin Manhole 2 EA $ 361.00 2 $ 722.00 100.00% $ - 30 Connect to Existin Water Main 3 EA $ 590.90 3 $ 1772.70 100.00% $ - 31 Remove Watermain 80 LF $ 9.85 80 $ 788.00 100.00% $ - 32 8" DIP Watennain Class 52 80 LF $ 29.25 80 $ 2,340.00 100.00 % $ - 33 8" Valve and Sleeve/Cou tin 1 EA $ 1 505.90 1 $ 1 505.90 100.00 % $ - 34 Seed Fertilize and Mulch 2980 SY $ 1.00 3750 $ 3,750.00 125.84 % $ 770.00 35 Silt Fence Install and Remove 625 LF $ 2.00 464 $ 928.00 74.24 % $ (322.00) 36 Erosion Control 1 LS $ 1,940.75 1 $ 1,940.75 100.00% $ - 37 Fiber Conduit Falsework Su ort 1 LS $ 3 134.50 1 $ 3 134.50 100.00 % $ - 36 Construction Slakin 1 LS $ 2,930.00 1 $ 2,930.00 100.00% $ - 39 Remove and Install Field Fence 75 LF $ 3.50 75 $ 262.50 100.00 % $ - 40 Safe Closure 2 EA $ 300.00 2 $ 600.00 100.00% $ - 41 Fence Chain Link, 72 in. Hei ht, On Wall 95 LF $ 45.00 95 $ 4,275.00 100.00% $ - 42 4" HDPE Trenched with 4-1" HDPE inside 695 LF $ 27.00 695 $ 18,765.00 100.00 % $ - 43 Fiber O tics Junction Vault Precast Concrete 5 EA $ 2 309.30 5 $ 11 546.50 100.00 % $ - Pa ment Totals $ 372,356.72 $ 8,548.44 NO. DATE CHANGE ORDER DESCRIPTION TOTAL CHANGE ORDER AMOUNT PERCENT 5-Oct-06 Rock Excavation $ 8,800.00 100.00% 5-Oct-O6 Concrete Encasement $ 9 267 94 100 00 5-Oct-O6 Seal Manhole , . $ 1,447.50 . % 100.00 5-Oct-06 Abutment Removal $ 13 297 13 100 00 16Dec-O6 Removal of Rubble from Existing Abutment Removal , . $ 2 354 5 . % 15-Dec-06 Fiber Vault No. 5 Installation , . 0 $ 1 945 5 100.00 15-Dec-06 Water Main Test , .2 $ 204 02 100.00 15-Dec-O6 Install New Guardrail . $ 4 400 00 100.00 15-Dec-O6 Plowable Mortar , . $ 100.00 2,053.19 100.00 __ Total Change Order Work Pertormed to Date: A as 7ftg s~ There was a typing error in Change Order No. 1 for the total cost for Concrete Encasement. The total on the change order was $9,267.96. The pay requests reflect the correct unit costs antl total. PROJECT COST SUMMARY Total Contract Work Performed to Date: $ 372,356.72 Total Change Order Work Performed to Date: $ 43,769.53 Contract and Change Order Work Due Contractor: miscellaneous Project Costs: Engineering Work Performed: Lantl Acquisition antl/or Easement Costs: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael V igen, City ger ~~ ~~`~ y of Dubuque, Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa The Undersigned, 1~ t$~x ,'~ ,contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claim id improvement. /~ APPROVED: SG~ L /~ ~ ~~avq, .-+ CJ BY: