Loading...
Eagle Point Park Collectors Building AcceptanceTHE CTTY OF DUB E Masterpiece on the Mississippi MEMORANDUM September 8, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Park Fee Collector's Building Project, #1759 Leisure Services Manager Gil Spence is recommending acceptance of the Eagle Point Park Fee Collector's Building Project, as completed by Klauer Construction Company, in the final contract amount of $271,856, which was $42,052 over the bid amount. The addition was due to eight change orders, with the majority of this expense covering unexpected storm sewer repair, an additional retaining wall and replacement of unsuitable soils. I concur with the recommendation and respectfully request Mayor and City Council approval. ~~y ~~ ~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gil D. Spence, Leisure Services Manager THE CITY OF ' DUB E Masterpiece on the Mississippi MEMORANDUM September 7, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manag SUBJECT: Eagle Point Park Fee Collector's Building Project, #1759 INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Eagle Point Park Fee Collector's Building Project. DISCUSSION The Eagle Point Park Fee Collector's Building Project has been completed by Klauer Construction Company in the final contract amount of $271,856. A summary of the project costs is as follows: Bid Amount Final Cost Construction contract $ 229,804 $ 229,804 Contingency 15,000 - Change order #1 - 575 Change order #2 - 2,552 Change order #3 - 12,125 Change order #4 - 500 Change order #5 - 12,755 Change order #6 - 10,257 Change order #7 - 1,117 Change order #8 - 2,171 TOTAL $ 244,804 $ 271,856 continued Eagle Point fee collector's building page two A summary of the change orders is as follows: Change order #1. Provided for extra tree removal, $575. Change order #2. Additional time and effort to excavate for water main and sanitary sewer pipe lateral not identified on the plans, $2,562. Change order #3. Labor, material, and equipment for storm sewer repair discovered during road construction, $12,125. Change order #4. Install clean stone under building slab in lieu of limestone, $500. Change order#5. Construct additional retaining wall, north side of driveway, $12,755. Change order #6. Remove unsuitable soils at driveway and replace with stone, $10,257. Change order #7. Install PVC conduit from building to island and under drive to southeast, $1,117. Change order #8. Add 50 sq. ft. to south retaining wall, $2,171. The C.I.P. budget contains $150,000 for this project. The following is a summary of the project costs: Construction contract Contingency Design fees TOTAL Estimated $ 158,000 15,000 16,425 $ 189,425 Actual $ 229,804 42,052 25,201 $ 297,057 This project is $147,057 over budget with the overrun coming from the following projects: • Flora Park Storm Sewer Project $ 50,000 • Heron Pond Tree Removal Project $ 30,000 • Eagle Point Park Stone Work Project $ 31,229 • Schmitt Island Master Plan $ 35,828 ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvement and setting the final cost. GDS:et attachments Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: 5563) 589-4263 RESOLUTION NO. 476-07 ACCEPTING IMPROVEMENT WHEREAS, the contract for the Eagle Point Park Fee Collector's Building Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 17th day of September 2007 Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk PK Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 477-07 FINAL ESTIMATE WHEREAS, the contract for the Eagle Point Park Fee Collector's Building Project has been completed and the Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $271,856, and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of September , 2007. Roy D. Buol, Mayor Attest: eanne F. Schneider, City Clerk PK