Loading...
Asbury Road Lane WideningTHC CITY OF DUB E MEMORANDUM Mrrsterpicce ors the Mississippi September 24, 2007 TO: The Honorable Mayor and City Council Members FROM: Gus Psihoyos, City Engineer SUBJECT: Asbury Road Eastbound Lane Widening Project City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Asbury Road Eastbound Lane Widening Project, as completed -by Horsfield Construction, Inc., in the final contract amount of $208,337.38, which is a 14.3% decrease from the original contract in the amount of $243,054.80. It is further recommended that the City Council authorize payment to Horsfield Construction, Inc. in the amount of $208,337.38. Wal-Mart and the Plastic Center, Inc. will reimburse the City for Phase I ($141,808.82), while the City will absorb the entire cost of Phase II ($66,528.56) through the Right-Turn Lane Asbury -Northwest Arterial Capital Improvement Project (CIP 3001824). I concur with the recommendation and respectfully request Mayor and City Council approval. r~ u ,~ Mi hael C. Van Milligen Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece nn the Mississippi MEMORANDUM September 24, 2007 TO: Michael C. Van Milligen, City Mana er FROM: Gus Psihoyos, City Engineer SUBJECT: Asbury Road Eastbound Lane Widening Project INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Asbury Road Eastbound Lane Widening Project. BACKGROUND The Asbury Road Eastbound Lane Widening Project involved two phases: Phase 1 The east lane widening required the southerly curb line of Asbury Road east of the Northwest Arterial to be constructed within approximately one (1) foot from the existing right-of-way line along the Plastic Center Inc. property line. This phase is to be paid by Plastic Center Inc. and Wal-Mart (Sam's Club). Phase 1/ The Asbury Road Eastbound eastbound right-turn lane on Arterial. The existing right-t project is a City project and right-turn lane on Asbury Road provided two dedicated through traffic on Asbury Road. DISCUSSION Widening Project also include Road between Holliday Drive provided a second straight paid entirely with City funds. between Holliday Drive and the anes and a dedicated right-turn d the addition of an and the Northwest through lane. This The addition of the Northwest Arterial lane for eastbound The Asbury Road Eastbound Lane Widening Project was completed by Horsfield Construction, Inc. of Epworth, Iowa, in the final contract amount of $208,337.38, which is a 14.3% decrease from the original contract in the amount of $243,054.80. Lane Asbury urn lane will be RECOMMENDATION recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $208,337.38 to Horsfield Construction, Inc. for the Asbury Road Eastbound Lane Widening Project. BUDGET IMPACT The estimate of final costs for the Asbury Road Eastbound Lane Widening Project is summarized as follows: Phase I (Between the Northwest Arterial and the Sam's Club Entrance) Construction Cost Contingency Traffic Signal Controller Relocation Alliant Energy Utility Relocation Design Engineering -Buesing & Associates Construction Staking -Buesing & Associates Construction Engineering & Inspection Total Project - Phase I Cost The Phase I funding summary is as follows: Fund Description Wal-Mart Funds Plastic Center Inc. Funds Total Project - Phase I Funding Phase II (Asbury Road Right Turn Lane Project between Holliday Drive and the Northwest Arterial) Construction Cost Contingency Property Acquisition Design Engineering -Buesing & Associates Construction Staking -Buesing & Associates Construction Engineering & Inspection Total Project -Phase II Cost Bid Award Final $ 153,481.00 $ 141,808.82 18,000.00 35,000.00 44,314.35 125, 000.00 128,670.29 14,650.00 14,650.00 3,240.00 12,000.00 13,218.82 $ 358,130.00 $ 345,902.28 Amount 250,000.00 95,902.28 $ 345,902.28 Bid Award Final $89,574.00 66,528.56 11,400.00 8,800.00 9,063.00 14,150.00 14,150.00 2,360.00 10,000.00 9,684.23 $133,924.00 $101,785.79 This Phase II funding summary is as follows: CIP No. Fund Description Amount 3001824 Right Turn Lane Asbury - NW Arterial $101,785.79 Total Project -Phase II Cost $101,785.79 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $208,337.38 to Horsfield Construction, Inc. for the Asbury Road Eastbound Lane Widening Project. Prepared by Robert Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Dave Ness, Civil Engineer Deron Muehring, Civil Engineer RESOLUTION NO. 491-07 ACCEPTING THE ASBURY ROAD EASTBOUND LANE WIDENING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Asbury Road Eastbound Lane Widening Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Wal-Mart Funds, Plastic Center Inc. Funds and the Right-Turn Lane Asbury- Northwest Arterial Funds appropriation for the contract amount of $208,337.38 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 1st day of October 2007. (~ Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE ASBURY ROAD EASTEOUND LANE WIDENING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Asbury Road Eastbound Lane Widening Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $447,688.07. ~~ ~~~, Dated this ~ '~~~~ ~ day of ~~~ ~ , 2007. .m. . Assistant City Engineer Filed in the office of the City Clerk on th e ~ .,day of ~ ,~ ~~~.:,u~„ ~ ~'~,., , 2007,..,,, .°~,.~ ~/ , w .~ ~ .~ ~ .~- .. Deanne F. Schneider, CMC, City Clerk er . City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: ASBURY ROAD EASTBOUND LANE WIDENING PROJECT CONTRACTOR: Horsfield Construction, Inc. DATE: September 25, 2007 CONTRACT AMOUNT: $243,054.80 LOCATION: PHASE I - NW ARTERIAUASBURY ROAD INTERSECTION EAST TO NEW ACCESS SERVING SAM'S CLUB SITE BID ITEM DESCRIPTION UNIT UNIT COST QUANT TY FINEARNED NT .DEMOLITION & REMOVAL 1 Removal of Trees, Regardless of Size or Type LS $ 2,775.00 1.0 $ 2,775.00 2 Removal of Fence LS $ 500.00 1.0 $ 500.00 3 Removal of Existing Storm Sewer Inlets LS $ 500.00 1.0 $ 500.00 4 Sawcut, Regardless of Pavement Type LF $ 3.00 305.0 $ 915.00 4a Removal of Existing Curb & Gutter LF $ 2.00 929.0 $ 1,858.00 4b Removal of Existing Pavement, Regardless of Type SY $ 4.30 68.00 $ 292.40 EARTHWORK 8 GRADING 5 Grading- Excavation, Unclassified (Cut) CY $ 3.00 410.0 $ 1,230.00 6 Embankment Fill (In Place Quantity) CY $ 7.50 0.0 DELETE STONE 7 Subgrade Stabilization Stone (where needed) TON $ 14.25 0.0 (includes coring, disposal and new rock material, furnished 8 installed) 8 3" Crushed Stone Base TON $ 11.30 584.1 9 Granular Subbase TON $ 12.30 223.2 10 Backfill, Limestone (Storm Sewer) TON $ 7.00 102.8 PAVEMENT 11 PC Concrete Curb 8~ Gutter, 2.5', Construct LF $ 12.00 1057.0 12 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) TON $ 54.00 109.1 13 HMA Binder Course 6-1/2", 300K, I, 1/2" (PG 64-22) TON $ 53.00 285.5 STORM SEWER 14 Storm Sewer, Catch Basin Intake 105-B EACH $ 3,900.00 1.0 15 Storm Sewer, 24" RCP LF $ 48.00 90.0 16 Storm Sewer, 24" FES EACH $ 685.00 1.0 17 Storm Sewer, 42" RCP LF $ 85.00 32.0 18 Storm Sewer, Manhole EACH $ 1,500.00 1.0 19 Storm Sewer, Rip Rap TON $ 20.00 115.9 20 Abandon Stom Sewer MH LS $ 860.00 1.0 $ 6,600.78 $ 2,745.36 $ 719.67 $ 12,684.00 $ 5,889.78 $ 15,131.50 $ 3,900.00 $ 4,320.00 $ 685.00 $ 2,720.00 $ 1,500.00 $ 2,317.40 $ 860.00 1NATER MAtN 21 Relocate Fire Hydrant (Complete) LS $ 1,770.00 1.0 $ 1,770.00 LIGHTING ELECTRICAL 22 Relocate Light Pole (Complete) LS $ 1.00 1.0 $ 1.00 LANDSCAPING 23 Topsoil, Backfill (4") SY $ 2.55 4668.0 $ 11,903.40 24 Seed, Fertilize & Mulch SY $ 0.65 6000.0 $ 3,900.00 25 Watering MGAL $ 45.00 0.0 $ - Mt$C,ELLANEOUS 26 Sign Post, Removal & Installation EACH $ 200.00 4.0 $ 800.00 27 Dust Control Surface Treatment MGAL $ 64.00 0.0 $ - 28 Silt Fence LF $ 3.00 1180.0 $ 3,540.00 29 Erosion Control Plan - Operatin Proceedures (Complete) LS $ 500.00 1.0 $ 500.00 30 Pavement Markings (Striping & Directional) LS $ 3,500.00 1.0 $ 3,500.00 31 Traffic 8~ Safery Control LS $ 3,500.00 1.0 $ 3,500.00 r' 32 Mobilization LS $ 10,600.00 1.0 $ 10,600.00 TOTAL AMOUNT EARNED TO DATE -PHASE 1: 3 108,158.29 GRANGE ORLIERS C1 42" Flared End Section Each $ 641.70 1.0 $ 641.70 C2 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) TON $ 21.00 109.1 $ 2,290.47 C3 HMA Binder Course 6-1/2", 300K, I, 112" (PG 64-22) TON $ 22.00 285.5 $ 6,281.00 C4 Embankment Fill (In Place Quantity), Replace Item No. 6 CY $ 3.50 2941.0 $ 10,293.50 C5 Strip Topsoil CY $ 3.50 1600.0 $ 5,600.00 C6 Increase PCC Curb & Gutter from 6" to 8" LF $ 1.65 1057.0 $ 1,744.05 C7 Additional Pavement Striping Removal LF $ 0.69 2187.0 $ 1,509.03 C8 Additional Pavement Symbol Removal Each $ 172.50 3.0 $ 517.50 C9 Gravel Drive/PCC Sidewalk Around Traffic Cabinet LS $ 4,773.28 1.0 $ 4,773.28 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS -PHASE 1: $ 33,650.53 TOTAL AMOUNT EARNED TO DATE -PHASE 1: $ 141,808.82 LOCATION: PHASE II -ASBURY ROAD RIGHT TURN LANE, HOLIDAY DRIVE EAST TO NW ARTERIAL DEMOLITION & REMOVAL 33 Removal of PC Concrete Sidewalk LS $ 650.00 1.0 $ 650.00 34 Removal of Landscape Shrubs LS $ 250.00 0.0 $ - 35 Sawcut, Regardless of Pavement Type LF $ 3.00 421.0 $ 1,263.00 35a Removal of Existing Curb 8~ Gutter LF $ 2.00 291.0 $ 582.00 35b Removal of Existing Pavement, Regardless of Type SY $ 4.30 98.0 $ 421.40 EARTHWORK 8 GRADING 36 Site Grading LS $ 5,000.00 1.0 $ 5,000.00 STONE 37 Subgrade Stabilization Stone (where needed) TON $ 14.25 0.0 $ - (includes coring, disposal and new rock material, furnished & installed) 38 3" Crushed Stone Base TON $ 11.30 0.0 $ - 39 Granular Subbase TON $ 12.30 94.8 $ 1,166.41 ..PAVEMENT 40 PC Concrete Curb 8~ Gutter, 2.5', Construct LF $ 12.00 421.0 $ 5,052.00 41 PC Concrete Pavement, 8", Class "C" SY $ 38.00 360.0 $ 13,680.00 42 PC Concrete Sidewalk, 4", Construct SF $ 3.40 1536.5 $ 5,224.10 43 PC Concrete Access Ramp Detectable EACH $ 200.00 1.0 $ 200.00 44 HMA Surtace Course 2", 300K, S, 112" (PG 70-28) TON $ 54.00 32.0 $ 1,728.54 45 HMA Binder Course 8", 300K, I, 112" (PG 64-22) TON $ 53.00 45.0 $ 2,385.00 LANDSCAPING 46 Topsoil, Backfill (4") SY $ 2.55 335.0 $ 854.25 47 Sod SY $ 5.50 335.0 $ 1,842.50 48 Seed, Fertilize & Mulch SY $ 0.65 150.0 $ 97.50 49 Watering MGAL $ 45.00 2.0 $ 90.00 MISCELLANEOUS 50 Segmental Retaining Wall w/ PC Concrete Leveling Pad (Match Exist) SF $ 27.00 500.0 $ 13,500.00 51 Sign Post, Removal & Installation EACH $ 200.00 4.0 $ 800.00 52 Dust Control Surface Treatment MGAL $ 64.00 0.0 $ - 53 Silt Fence LF $ 3.00 170.0 $ 510.00 54 Erosion Control Plan - Operatin Proceedures (Complete) LS $ 250.00 1.0 $ 250.00 55 Pavement Markings (Striping & Directional) LS $ 2,000.00 1.0 $ 2,000.00 56 Traffic & Safety Control LS $ 2,800.00 1.0 $ 2,800.00 57 Mobilization LS $ 3,500.00 1.0 $ 3,500.00 TOTAL AMOUNT EARNED TO DATE -PHASE II: $ 63,596.70 CHANGE ORDERS C1 Cost differential curb LF $ 1.65 421.0 $ 694.65 C2 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) TON $ 21.00 32.0 $ 672.21 C3 HMA Binder Course 6-1/2", 300K, I, 1/2" (PG 64-22) TON $ 22.00 45.0 $ 990.00 C4 Additional Lane Closure on NW Arterial LS $ 575.00 1.0 $ 575.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS -PHASE II: $ 2,931.86 TOTAL AMOUNT EARNED TO DATE -PHASE II: $ 66,528.56 TOTAL AMOUNT EARNED TO DATE: $ 208,337.38 TOTAL DUE CONTRACTOR: Property Acquisition Consultant -Engineering Design Services Consultant -Construction Staking Services Traffic Signal Equipment Relocation Alliant Energy Utility Relocation Construction Engineering 8~ Inspection TOTAL IMPROVEMENT COST: CERTIFICATE OF THE CITY MANAGER: $ 208,337.38 $ 9,063.00 $ 28,800.00 $ 5,600.00 $ 44,314.35 $ 128,670.29 $ 22,903.05 $ 447,688.07 APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa CERTIFICATE OF THE APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Horsfield Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Horsfield Construction, Inc. BY: j~%' / ' r TITLE: DATE: / -~ S _ ~ City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: September 25, 2007 PROJECT NAME: ASBURY ROAD EASTBOUND LANE WIDENING PROJECT CONTRACTOR: Horsfield Construction, Inc. CONTRACT AMOUNT: 5243,054.80 LOCATION: PHASE I - NW ARTERIALIASBURY ROAD INTERSECTION EAST TO NEW ACCESS SERVING SAM'S CLUB SITE BID ITEM DESCRIPTION UNIT UNIT COST QUANTITY FINEARN ODUNT DEMOLITION $ REMOVAL , 1 Removal of Trees, Regardless of Size or Type LS $ 2,775.00 1.0 $ 2,775.00 2 Removal of Fence LS $ 500.00 1.0 $ 500.00 3 Removal of E>asting Storm Sewer Inlets LS $ 500.00 1.0 $ 500.00 4 Sawcut, Regardless of Pavement Type LF $ 3.00 305.0 $ 915.00 4a Removal of Existing Curb & Gutter LF $ 2.00 929.0 $ 1,858.00 4b Removal of Existing Pavement, Regardless of Type SY $ 4.30 68.00 $ 292.40 EARTHWORK 8 GRADING 5 Grading -Excavation, Unclassified (Cut) CY $ 3.00 410.0 $ 1,230.00 6 Embankment Fill (In Place Quantity) CY $ 7.50 0.0 DELETE STONE 7 Subgrade Stabilization Stone (where needed) TON $ 14.25 0.0 (includes coring, disposal and new rock material, furnished & installed) 8 3" Crushed Stone Base TON $ 11.30 9 Granular Subbase TON $ 12.30 10 Backfill, Limestone (Storm Sewer) TON $ 7.00 584.1 $ 6,600.78 223.2 $ 2,745.36 102.8 $ 719.67 PAVEMENT 11 PC Concrete Curb & Gutter, 2.5', Construct LF $ 12.00 1057.0 $ 12,684.00 12 HMA Surtace Course 2", 300K, S, 1/2" (PG 70-28) TON $ 54.00 109.1 $ 5,889.78 13 HMA Binder Course 6-112", 300K, I, 112" (PG 64-22) TON $ 53.00 285.5 $ 15,131.50 STORM SEWER 14 Storm Sewer, Catch Basin Intake 105-B EACH $ 3,900.00 1.0 $ 3,900.00 15 Storm Sewer, 24" RCP LF $ 48.00 90.0 $ 4,320.00 16 Storm Sewer, 24" FES EACH $ 685.00 1.0 $ 685.00 17 Storm Sewer, 42" RCP LF $ 85.00 32.0 $ 2,720.00 18 Storm Sewer, Manhole EACH $ 1,500.00 1.0 $ 1,500.00 19 Storm Sewer, Rip Rap TON $ 20.00 115.9 $ 2,317.40 20 Abandon Stom Sewer MH LS $ 860.00 1.0 $ 860.00 WATER MAIN 21 Relocate Fire Hydrant (Complete) LS $ 1,770.00 1.0 $ 1,770.00 LIGHTING ELECTRICAL 22 Relocate Light Pole (Complete) LS $ 1.00 1.0 $ 1.00 LANDSCAPING 23 Topsoil, Backfill (4") SY $ 2.55 4668.0 $ 11,903.40 24 Seed, Fertilize ~ Mulch SY $ 0.65 6000.0 $ 3,900.00 25 Watering MGAL $ 45.00 0.0 $ - MISCELLANEOUS 26 Sign Post, Removal & Installation EACH $ 200.00 4.0 $ 800.00 27 Dust Control Surface Treatment MGAL $ 64.00 0.0 $ - 28 Silt Fence LF $ 3.00 1180.0 $ 3,540.00 29 Erosion Control Plan -Operating Proceedures (Complete) LS $ 500.00 1.0 $ 500.00 30 Pavement Markings (Striping & Directional) LS $ 3,500.00 1.0 $ 3,500.00 31 Traffic & Safety Control LS $ 3,500.00 1.0 $ 3,500.00 32 Mobilization CHANGE ORDERS C1 42" Flared End Section C2 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) C3 HMA Binder Course 6-1/2", 300K, I, 1/2" (PG 64-22) C4 Embankment Fill (In Place Quantity), Replace Item No. 6 C5 Strip Topsoil C6 Increase PCC Curb 8~ Gutter from 6" to 8" C7 Additional Pavement Striping Removal C8 Additional Pavement Symbol Removal C9 Gravel Drive/PCC Sidewalk Around Traffic Cabinet LS $ 10,600.00 1.0 $ 10,600.00 TOTAL AMOUNT EARNED TO DATE -PHASE 1: $ 108,158.29 Each $ 641.70 1.0 $ 641.70 TON $ 21.00 109.1 $ 2,290.47 TON $ 22.00 285.5 $ 6,281.00 CY $ 3.50 2941.0 $ 10,293.50 CY $ 3.50 1600.0 $ 5,600.00 LF $ 1.65 1057.0 $ 1,744.05 LF $ 0.69 2187.0 $ 1,509.03 Each $ 172.50 3.0 $ 517.50 LS $ 4,773.28 1.0 $ 4,773.28 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS -PHASE 1: $ 33,650.53 TOTAL AMOUNT EARNED TO DATE -PHASE 1: $ 141,808.82 LOCATION: PHASE II - ASBURY ROAD RIGHT TURN LANE, HOLIDAY DRIVE EAST TO NW ARTERIAL DEMOLITION & REMOVAL 33 Removal of PC Concrete Sidewalk LS $ 650.00 1.0 $ 650.00 34 Removal of Landscape Shrubs LS $ 250.00 0.0 $ - 35 Sawcut, Regardless of Pavement Type LF $ 3.00 421.0 $ 1,263.00 35a Removal of Existing Curb & Gutter LF $ 2.00 291.0 $ 582.00 35b Removal of Existing Pavement, Regardless of Type SY $ 4.30 98.0 $ 421.40 EARTHWORK 8 GRADING 36 Site Grading STONE 37 Subgrade Stabilization Stone (where needed (includes coring, disposal and new rock material furnished 8 installed) 38 3" Crushed Stone Base 39 Granular Subbase PAVEMENT 40 PC Concrete Curb & Gutter, 2.5', Construct 41 PC Concrete Pavement, 8", Class "C" 42 PC Concrete Sidewalk, 4", Construct 43 PC Concrete Access Ramp, Detectable 44 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) 45 HMA Binder Course 8", 300K, I, 1/2" (PG 64-22) LS $ 5,000.00 1.0 $ 5,000.00 TON $ 14.25 0.0 $ - TON $ 11.30 0.0 $ - TON $ 12.30 94.8 $ 1,166.41 LF $ 12.00 421.0 $ 5,052.00 SY $ 38.00 360.0 $ 13,680.00 SF $ 3.40 1536.5 $ 5,224.10 EACH $ 200.00 1.0 $ 200.00 TON $ 54.00 32.0 $ 1,728.54 TON $ 53.00 45.0 $ 2,385.00 LANDSCAPING 46 Topsoil, Backfill (4") SY $ 2.55 335.0 $ 854.25 47 Sod SY $ 5.50 335.0 $ 1,842.50 48 Seed, Fertilize & Mulch SY $ 0.65 150.0 $ 97.50 49 Watering MGAL $ 45.00 2.0 $ 90.00 ':,MISCELLANEOUS 50 Segmental Retaining Wall w/ PC Concrete Levelin Pad (Match Exist) SF $ 27.00 500.0 $ 13,500.00 51 Sign Post, Removal & Installation EACH $ 200.00 4.0 $ 800.00 52 Dust Control Surtace Treatment MGAL $ 64.00 0.0 $ - 53 Silt Fence LF $ 3.00 170.0 $ 510.00 54 Erosion Control Plan - Operatin Proceedures (Complete) LS $ 250.00 1.0 $ 250.00 55 Pavement Markings (Striping 8 Directional) LS $ 2,000.00 1.0 $ 2,000.00 56 Traffic 8 Safety Control LS $ 2,800.00 1.0 $ 2,800.00 57 Mobilization LS $ 3,500.00 1.0 $ 3,500.00 TOTAL AMOUNT EARNED TO DATE -PHASE 11: $ 83,596.70 CHANGE ORDERS C1 Cost differential curb LF $ 1.65 421.0 $ 694.65 C2 HMA Surface Course 2", 300K, S, 1/2" (PG 70-28) TON $ 21.00 32.0 $ 672.21 C3 HMA Binder Course 6-112", 300K, I, 1 /2" (PG 64-22) TON $ 22.00 45.0 $ 990.00 C4 Additional Lane Closure on NW Arterial LS $ 575.00 1.0 $ 575.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS -PHASE II: $ 2,931.88 TOTAL AMOUNT EARNED TO DATE -PHASE II: $ 66,528.58 TOTAL AMOUNT EARNED TO DATE: $ 208,337.38 TOTAL DUE CONTRACTOR: Property Acquisition Consultant -Engineering Design Services Consultant -Construction Staking Services Traf£c Signal Equipment Relocation Alliant Energy Utility Relocation Construction Engineering 8~ Inspection TOTAL IMPROVEMENT COST: CERTIFICATE OF THE CITY MANAGER: $ 208,337.38 $ 9,063.00 $ 28,800.00 $ 5,600.00 $ 44,314.35 $ 128,670.29 $ 22,903.05 $ 447,688.07 APPROVED: Michael Van Milligen, City Manager City of Dubuque, Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Horsfield Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all Gaims for said improvement. CONTRACTOR: Horsfield Construction, Inc. BY: TITLE: ~~( DATE: (-OZ S ~