Loading...
2015 Asbury Road Pavement Rehabilitation Project_Award Copyright 2014 City of Dubuque Action Items # 3. ITEM TITLE: 2015 Asbury Road Rehabilitation Project Award SUMMARY: City Manager recommending award of the construction contract to the low bidder, Iowa Erosion Control, Inc. RESOLUTION Awarding Public Improvement Contract for the 2015 Asbury Road Pavement Rehabilitation Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 2015 Asbury Road Pavement Rehabilitation Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions ❑ Bid Tab Supporting Documentation ❑ Construction Contract Award Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 Asbury Road Pavement Rehabilitation Project DATE: March 10, 2015 Sealed bids were received for the 2015 Asbury Road Pavement Rehabilitation Project. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Iowa Erosion Control, Inc., in the amount of $317,619.47, which was 5% under the estimate of probable cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E AN-AmecaCHY 11 1 ► Masterpiece ort the Mississippi 200"•2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2015 Asbury Road Pavement Rehabilitation Project CIP 3002482 DATE: March 9, 2015 INTRODUCTION The enclosed resolution authorizes the award of the construction contract for the 2015 Asbury Road Pavement Rehabilitation Project. DISCUSSION The 2015 Asbury Road Pavement Rehabilitation Project, from approximately 450' East of Mathew John Drive to John F. Kennedy Road will provide for the following improvements: • The placement of dowel bars at the transverse joints for traffic load transfer, which will extend the life of the pavement. • Diamond grind the existing concrete pavement which will provide a smoother ride. • Concrete panel replacement where needed. • Re-sealing the transverse and longitudinal joints which will extend the life of the pavement. • Storm sewer intake top reconstruction. BID RESULTS Sealed bids were received on the project on March 5, 2015. Iowa Erosion Control, Inc. of Victor, Iowa submitted the low bid in the amount of $317,619.47. This amount is 5% under the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name Bid Amount Iowa Erosion Control, Inc. $317,619.47 Eastern Iowa Excavating & Concrete, LLC $338,669.43 Tschiggrie Excavating, Co. $347,500.84 RECOMMENDATION I recommend that the contract be awarded to Iowa Erosion Control, Inc. in the amount of $317,619.47. BUDGETIMPACT The summary of project costs for the 2015 Asbury Road Pavement Rehabilitation is as follows: Estimate Award Construction Contract $334,510.30 $317,619.47 Contingency 33,451.03 33,451.03 Admin, Design, Construction Engineering & Inspection 55,194.20 55,194.20 Total Project Cost $423,155.53 $406.264.ZQ The project funding summary is as follows: CIP No. Fund Description Fund Amount 3002482 Asbury Road Grinding $406,264.70 Total Project Funding $406,264.70 The City has budgeted $450,000 (FY14, FY15) to make the improvement repairs on Asbury Road. Since the City received favorable bids, within budget, staff will evaluate the original scope of work recommended to determine if additional rehabilitation could be performed while remaining within the available budget. Additional work that may be recommended would include installing dowel bars in the center turn lane, diamond grinding the center turn lane, or additional concrete panel replacement where needed. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the 2015 Asbury Road Pavement Rehabilitation Project, to Iowa Erosion Control, Inc. in the amount of$317,619.47. Prepared by: Robert Schiesl, Assistant City Engineer Greg Doeden, Civil Engineer cc: Jenny Larson, Budget Director Don Vogt, Public Works John Klostermann, Public Works Jon Dienst, Civil Engineer FAPROJECTS\Asbury Road Dowel Bar Retrofit\Council and Staff Documents\Award RESOLUTION NO. 93-15 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2015 ASBURY ROAD PAVEMENT REHABILITATION PROJECT Whereas, sealed proposals have been submitted by contractors for the 2015 Asbury Road Pavement Rehabilitation Project (the Project) pursuant to Resolution No. 36- 15 and Notice to Bidders published in a newspaper published in the. City of Dubuque, Iowa on the 13th day of February, 2015. Whereas, said sealed proposals were opened and read on the 5th day of March, 2015 and it has been determined that Iowa Erosion Control, Inc. of Victor, Iowa, with a bid in the amount of $317,619.47, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Iowa Erosion Control, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 16th day of March, 2015. Attest: Trish Gleason, CMC, Asst. City Clerk oy D. Buol, Mayor Dus UE ������ ; Pp,�,.,� ,o,=�a�a.Ro�PA�ME�.aE���.A.o�Pao,E�. �0 0 0 =�,0 00 0000 00 00 00 83 s s s s s s s — — ��e.da� s � so ��e.aa� s �ooaoo ��e.a� s � oo ��.a� s ��,�000 ..�_��,,....,=�my s s s s s s s s — — s s s s s s s s ��a��e�e��e°°°3 s s s s s s s s — — ��e.da� s � oo ��e.aa� s ,z3aa�o ��e.a� s � � ��.a� s ,,,a000 s s s s s s s s — — s s s s s s s s — — ��e.aa� s � oo ��e.aa� s s,a„moo ��e.a� s � oo ��.a� s s�000 �°���,a��R�;” s s s s s s s s — — ��e.aa� s zs,�oo ��e.aa� s a�aoo ��e.a� s � oo ��.a� s ,,,x�o s s s s s s s s — — , s s s s s s s o��R����, s s s s s s s s — a��R����� — s s s s s s s s s s s s s s s s — �o��P�a��� — s s s s s s s s — a a — , s s s s s s s s s s s s s s s — — , s s s s s s s °a"Mem s s s s s s s s — — ��e.aa� s �zz�� ��e.aa� s ,�3a3so ��e.a� s � oo ��.a� s z,z��o s s s s s s s s — — , s s s s s s s s s s s s s s s — — , s s s s s s s s s s s s s s s — — ��e.aa� s � ao ��e.aa� s „3�n ��e.a� s � ,a ��.a� s „z,a3, 83 s s s s s s s a a s — s s s s s s s s s s s s s s s s — — ��e.aa� s � so ��e.aa� s ,,,�aoo ��e.a� s � oo ��.a� s s,�oo s s s s s s s s — — ��e.aa� s ,moo ��e.aa� s n,�o ��e.a� s sono° ��.a� s 3, 00 s s s s s s s s s s s s s s s s — — ��e.aa� s ,0000 ��e.aa� s ,�aoo ��e.a� s ,moo ��.a� s �000 .a�E s .a�a, s .�,�a, s .a�a, s �o.e,�beF, s�� ,?,� 3aa� `HEiY OF City of Dubuque, Iowa DUB E Construction Contract Award Masterpiece on the Mississippi Daze 15-Mar-15 Pri Name: 2015 ASBURY ROAD PAVEMENT REHABILITATION PROJECT Contractor Name Iowa Erosion Control,Inc. Address 1106 Sod Street P O.Bos 0 Cil.Sta Zip Victor,IA.52347 Contract Award Amount $317 619 47 Pir eRCompletion Date 3-Jul-15 NNE REMNUNBER DESCRIPTION OOANTRY UNR UNIT PRICE TOTHL PRICE Division 1-General Provisions 1 1090 105 D Mobilization 1 LS $ 32,00000 $ 32,000.00 Sub Total $ 32,000.00 Division 2010-Eartfnvork,Subgrade,and Subbase 2 2010 108Y3 Topsoil,Off side 6 CY $ 11475 $ 68850 3 20101081-0 Subbase,Modified Subbase-Gadation14 100 TON $ 5300 $ 5,30000 4 20101081-0 Subbase,Coarse Agpapate Subbase-3"Breaker 100 TON $ 6400 $ 8,40000 Sub Total $ 12,388.50 Division 6010-StrucW res for Sanitary and Storm Sewers 5 6010108£-0 Manhole Adjustment Minor 2 EA $ 1,14025 $ 2,280.50 6 6010108£-0 Intake Adjustment Minor 4 EA $ 1,14025 $ 4,561.00 Sub Total $ 6 841.50 Division 7010-Portland Cernerrt Concr4e Pavernent 7 7010108£-0 Cut and Sudety 30 Width) 6 (Thickness) 85 LF $ 10000 $ 8,50000 Sub Total $ 8,500.00 Division 7040-Sidewalks,Shared Use Pazbs,and Driveways 8 7030108A-0 Removal of Sidewalk 25 SY $ 3300 $ 82500 9 7030108A0 Removal of Dnveway 16 SY $ 4675 $ 74800 10 7030108£-0 Sltlewalk,PCC,4"(Thiclkness) 20 SY $ 5925 $ 1,18500 11 7030 108£-0 Sltlewalk,PCC,6"(Thickness) 5 SY $ 157 50 $ 787 50 Sub Total $ 3,545.50 Division 7010-Pavement Rehabilitation 12 7040 108A 0 Full Dept,Patches PCC 206 SY $ 9325 $ 19,209 50 13 7040108A0 Full Dept,Patches HMA 507 SY $ 10200 $ 5,17140 14 70401080.0 Crack and Joint Cleaning and Fill, Hot Pour 19700 LF $ 225 $ 44,32500 15 7040108F 0 Diamond Gbndlnp 9535 SY $ 5.10 $ 48,628 50 16 70481081-0 RemovalCurb and Gudden 85 LF $ 845 $ 71825 17 OS-12018(New) Dowel Bar Potent 2275 EA $ 3575 $ 81,33125 Sub Total $ 199,383.90 IDOT Division 2527-Pavernent Mar ing 18 IDOT 2527W-A-1 Pointed Pavement Markings 8152 STA $ 5250 $ 4,27900 19 IDOT 2527 WA3 Removable Tape Markings 4 STA $ 17475 $ 75143 20 DOT 2527 CarA4Pointed Symbols and Depends 32 EA $ 8735 $ 2,79520 21 IDOT 2527 WA8 Pavement Markin,Removed 16 STA $ 4800 $ 74004 22 IDOT 2527WAR SVmbols and Depends Removed 32 EA $ 8735 $ 2,79520 Sub Total $ 11,352.57 IDOT Division 2528-Traffic Control 23 IDOT 252804A Traffic Control 1 ITS $ 37,25000 $ 37,250.00 24 DOT 2528 Car Portable Changeable Messape Sips 100 Has $ 1000 $ 1,00000 25 IDOT 2528 04 1 Flappers 70 EA $ 5000 $ 3,50000 Sub Total $ 41,750.00 Division 9020-Sodding 26 9020 108A 0 Sod 5 SO $ 105 50 $ 527 50 Sub Total $ 527.50 Division 9010-Erosion and SMime t Control 27 90481080.1 Filter Sod,,8" 80 LF $ 1150 $ 92000 28 90481080.2 FIIerSocks Removal 80 LF $ 500 $ 40000 Sub Total $ 1,320.00 Total Bid $ 317,61947