Loading...
Kaufmann Alley Storm Sewer Const. ProjectTHE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM November 13, 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Kaufmann Alley Storm Sewer Construction Project (CIP#7201667) City Engineer Gus Psihoyos is recommending acceptance of the Kaufmann Alley Storm Sewer Construction Project, as completed by Drew Cook & Sons Excavating, in the final contract amount of $30,576.37, which is an increase of $7,182.12 from the original contract of $23,394.25. To add value to the project, an additional $2,601.75 was spent to re-grade the area in the vicinity of the new sewer to augment the storm sewer's ability to capture Stormwater. An additional $1,576.19 was required to pave the alley with asphalt so that it too can carry Stormwater. The project required approximately 15% more in construction materials, such as lime backfill, bedding stone, and base stone. Finally, the removal and replacement of sidewalk was necessary due to complications near Kaufmann Avenue that were discovered through excavation. I concur with the recommendation and respectfully request Mayor and City Council approval. .~" (J v Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM November 9, 2007 TO: Michael C. Van Milligen, City Manag FROM: Gus Psihoyos, City Engineer _ SUBJECT: Kaufmann Alley Storm Sewer Construction Project (CIP#7201667) INTRODUCTION The enclosed resolution provides for the acceptance of the improvements for the Kaufmann Alley Storm Sewer Construction Project. BACKGROUND The Kaufmann Alley Storm Sewer Construction Project entailed the construction of approximately 350 feet of 24-inch diameter storm sewer from Kaufmann Avenue to the north in the alley just east of Kurt Street. The storm sewer will capture stormwater that originates on Primrose Court north of Kaufmann that flows to the alley. DISCUSSION The Kaufmann Alley Storm Sewer Construction Project was completed by Drew Cook & Sons Excavating of Dubuque, Iowa, in the final contract amount of $30,576.37, which is an increase of $7,182.12 from the original contract of $23,394.25. To add value to the project, an additional $2,601.75 was spent to re-grade the area in the vicinity of the new sewer to augment the storm sewer's ability to capture stormwater. An additional $1,576.19 was required to pave the alley with asphalt so that it too can carry stormwater. The project required approximately 15% more in construction materials such as lime backfill, bedding stone, & base stone. Finally, the removal and replacement of sidewalk was necessary due to complications near Kaufmann Avenue that were discovered through excavation. RECOMMENDATION recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $30,576.37 to the contractor for the Kaufmann Alley Storm Sewer Construction Project. BUDGET IMPACT The project cost summary for the Kaufmann Alley Storm Sewer Construction Project is summarized as follows: Award Construction Contract $23,394.25 Contingency 3,376.00 Engineering 5,570.00 $32,340.25 The project will be funded as follows: CIP CIP Name 7201667 FY2006 Kaufmann Alley 7201008 FY2008 Storm Sewer Improvements/Extensions Total Funding ACTION TO BE TAKEN Final $30,576.37 0 5,503.18 $36,079.55 Amount $30,000.00 $ 6,079.55 $36,079.55 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $30,576.37 to Drew Cook & Sons Excavating for the Kaufmann Alley Storm Sewer Construction Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 542-07 ACCEPTING THE KAUFMANN ALLEY STORM SEWER CONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Kaufmann .Alley Storm Sewer Construction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the FY2006 Kaufmann Alley Capital Improvement Project and FY2008 Storm Sewer Improvements/Extensions Capital Improvement Project appropriations for the contract amount of $30,576.37 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19th day of 2007. Patricia A. Cline, Mayor Pro Tem Attest: Kevin S. Firnstahl, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE KAUFMANN ALLEY STORM SEWER CONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Kaufmann Alley Storm Sewer Construction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $36,079.55. Dated this~~ day of , 2007. City Engineer Filed in the office of the City Clerk on the 14th day of November, 2007 Jeanne F. Schneider, CMC, City Clerk .~ PROJECT CLOSE OUT FORM THE CI TY O F T T ' p D E ' lJ LJ Pr ojeCt Name: ICAUFMANN ALLEY Masterpiece on the Mississippi STORM SEWER PROJECT CIP Number: CIP # : 7201667 roject Contract Amount: $23,394.25 Pro'ect Com letion Date: 1a-Sep-o7 City of Dubuque Contractor Name: Drew Cook a Sons Engineering 50. W. 13th Street Contractor Address: 10832 Timber Ridge Dubuque,lA 52001 City, State, Zip: Dubuque,lA 52001 (563) 589-4270 Contractor Tele hone: 563-582-9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT QUANTITY TOTAL COMPLETE TOTAL Over t Under 1 Topsoil Strip, Salvage, Stockpile and Spreading 1100 SF $ 0.30 1100.00 $ 330.00 100.00% $ - 2 RCP Storm Sewer 24" 322.9 LF $ 22.50 322.90 $ 7,265.25 100.00% $ - 3 Tap Existing Catch Basin 1 LS $ 500.00 1.00 $ 500.00 100.00 % $ - 4 48" Manhole, Complete 2 Each $ 1,505.00 2.00 $ 3,010.00 100.00% $ - 5 Catch Basin, Modified 101-C 1 Each $ 1,505.00 1.00 $ 1,505.00 100.00% $ - 6 Lime Backfill 333 Ton $ 6.00 383.52 $ 2,301.12 115.17 % $ 303.12 7 Bedding Stone, 1" Clean 110 Ton $ 13.00 128.77 $ 1,674.01 117.06% $ 244.01 8 ACC - 3" 36 Ton $ 89.00 53.71 $ 4,780.19 149.19 % $ 1,576.19 9 Base Stone 166 Ton $ 12.00 187.58 $ 2,250.96 113.00% $ 258.96 10 Berm R Sump Grading Around CB#1 1 LS $ 300.00 1.00 $ 300.00 100.00% $ - 11 4" PCC Sidewalk 60 SF $ 6.00 108.50 $ 651.00 180.83% $ 291.00 12 Landscape Restoration 1100 SF $ 1.00 3701.75 $ 3,701.75 336.52% $ 2,601.75 13 Traffic Control 1 LS $ 400.00 1.00 $ 400.00 100.00% $ Sub Total $ 28,669.28 Sub Total $ 5,275.03 7,182.12 ~ Payment Totals $ 28,669.28 ~ NO. DATE TOTAL CHANGE ORDE CHANGE ORDER DESCRIPTION AMOUNT PREVIOUS TOTAL AMOUNT CURRENT PAY PERIOD AMOUNT TOTAL AMOUNT TO DATE PERCENT 1 24-Sep-07 Rip Rap at the sump area - 30.84 tons ~ $20.00/ton $ 616.80 $ - $ 616.80 $ 616.80 2 24-Sep-07 Intake Top w/ Ring & Cover $ 650.00 $ - $ 650.00 $ 650.00 3 24-Sep-07 Top Soil - 21 CY @ $13/CY $ 273.00 $ - $ 273.00 $ 273.00 4 24-Sep-07 6" PC Sidewalk-52.47 SF ~ $7.00 $ 367.29 $ - $ 367.29 $ 367.29 $ - $ - $ - Total Change Order Work Performed to Date: $ 1,907.09 s r PROJECT COST SUMMARY Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Contract and Change Order Work Due Contractor: Total miscellaneous Project Costs: Total Engineering Work Performed: Total land Acquisition and/or Easement Costs: TOTAL PROJECT COST: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa $ 28,669.28 $ 1,907.09 S 30,576.37 $ - $ 5,503.18 $ - E 36 079.55 The Undersigned, ,contractor for the above improvement, does hereby accept the above "Total Due ConVactor", as full settlement aims for sair\d imJp/rpv~emje~nt/ y/.- / ~~,/ / (//!\ APPROVED: l y'~ ~J(/t_J~` 1 ~(/~j ~i^'~,~ ~v PROJECT CLOSE OUT FORM THE CR Y OF ~ 7 D ~ E lJ Project Name: KAUFMANN ALLEY Masterpiece on the Mississippi STORM SEWER PROJECT CIP Number: CIP # : 7201667 roject Contract Amount: 523,39x.25 Pro act Com letion Date: 1a-Sep-07 City of Dubuque Contractor Name: Drew Cook 8 Sons Engineering 50. W. 13th Street Contractor Address: 10632 Timber Rid e Dubuque,lA 52001 City, State, Zip: Dubu ue,lA 52001 (563) 589-4270 Contractor Tele hone: 563-582-9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT QUANTITY TOTAL COMPLETE TOTAL Over /Under 1 Topsoil SVip, Salvage, Stockpile and Spreading 1100 SF S 0.30 1100.00 S 330.00 100.00% S - 2 RCP Storm Sewer 24' 322.9 LF S 22.50 322.90 S 7,265.25 100.00% S - 3 Tap Existing Catch Basin i LS S 500.00 1.00 S 500.00 100.00% S - 4 48' Manhole, Complete 2 Each S 1,505.00 2.00 S 3,010.00 100.00% S - 5 Catch Basin, Modified 101-C 1 Each S 1,505.00 1.00 S 1,505.00 100.00% S - 6 Lime Backfill 333 Ton S 6.00 383.52 S 2,301.12 115.17% S 303.12 7 Bedding Stone, 1" Clean 110 Ton S 13.00 128.77 S 1,674.01 117.06% S 244.01 8 ACC - 3" 36 Ton S 89.00 53.71 S 4,780.19 149.19% S 1,576.19 9 Base Stone 166 Ton S 12.00 187.58 S 2,250.96 113.00% S 258.96 10 Berm 8 Sump Grading Around CB#1 1 LS S 300.00 1.00 $ 300.00 100.00% S - 11 4" PCC Sidewalk 60 SF S 6.00 108.50 S 651.00 180.83% S 291.00 12 Landscape Restoration 1100 SF S 1.00 3701.75 S 3,701.75 336.52% S 2,601.75 13 Traffic ConVol 1 LS S 400.00 1.00 S 400.00 100.00% S Sub Total S 28,669.28 Sub Total S 5,275.03 iota[ ~ rayment totals S 28,669.28 i NO. DATE TOTAL CHANGE ORDE CHANGE ORDER DESCRIPTION AMOUNT PREVIOUS TOTAL AMOUNT CURRENT PAY PERIOD AMOUNT TOTAL AMOUNT TO DATE PERCENT 1 24-Sep-07 Rip Rap at the sump area - 30.84 tons {~ 520.00/ton S 616.80 $ - g 616.80 S 616.80 2 24-Sep-07 Intake Top w/ Ring & Cover S 650.00 S - s 650.00 S 650.00 3 24-Sep-07 Top Shc - 21 CY ~ S13/CY S 273.00 S - S 273.00 S 273.00 4 24-Sep-07 6' PC Sidewalk - 52.47 SF ~ 57.00 S 367.29 S - S 367.29 S 367.29 S - S - S - 3 - Total Change Order Work Performed to Date: S 1,907.09 PROJECT COST SUMMARY Total Contract Work Performed to Date: Total Change Order Wwk Performed to Date: Total Contract and Change Order Work Due Contractor: $ 28,669.28 a t,so7.os S 30 576.37 Total miscellaneous Project Costs: Total Engineering Wwk Pertwmed: Total Land Acquisition and/or Easement Costs: TOTAL PROJECT COST: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager Dubuque, Iowa •. ' -~ Gus Psihoyos, City Engineer Dubuque, bwa S - $ 5,503.18 S - S 36 079.55 Tho Undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor', as full settlement for(at~l claims for said imp/rove~ment. ~j /~ /~ .~/ APPROVED: ~ /~f~~ ~S~J ~ IJ" U/~ I~j~{r C.IJ~j/~[. BY: ~~~ ~ ~ ~~. PROJECT CLOSE OUT FORM TH E CIT1( O F j ~ DuB ~ Project Name: KAUFMANN ALLEY Masterpiece un the Mississippi STORM SEWER PROJECT CIP Number: CIP # : 7201667 roject Contract Amount: $z3,3sa.25 Project Com letion Date: 1a-Sep-07 City of Dubuque Contractor Name: Drew Cook 8 Sans Engineering 50. W. 13th Street Contractor Address: 10832 Timber Rid e Dubuque, IA 52001 City, State, Zip: Dubu ue, U152001 (563) 589-4270 Contractor Tele hone: 563-see-92x2 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE TOTALS PERCENT QUANTITY TOTAL COMPLETE TOTAL Over I Under 1 Topsoil Strip, Salvage, Stockpile and Spreading 1100 SF $ 0.30 1100.00 $ 330.00 100.00% $ - 2 RCP Storm Sewer 24" 322.9 LF $ 22.50 322.90 $ 7,265.25 100.00% $ - 3 Tap Exisfing Catch Basin 1 LS S 500.00 1.00 $ 500.00 100.00% S - 4 48" Manhde, Complete 2 Each $ 1,505.00 2.00 $ 3,010.00 100.00% S - 5 Catch Basin, Modified 101-C 1 Each $ 1,505.00 1.00 $ 1,505.00 100.00% $ - 6 Lime Backfill 333 Ton $ 6.00 383.52 $ 2,301.12 115.17% $ 303.12 7 Bedding Stone, 1" Clean 110 Ton $ 13.00 128.77 $ 1,674.01 117.06% $ 244.01 8 ACC - 3" 36 Ton $ 89.00 53.71 S 4,780.19 149.19% $ 1 576.19 9 Base Stone 166 Ton $ 12.00 1!17.58 $ 2,250.96 113.00% , S 258.96 10 Berm & Sump Grading Around CB#1 1 LS $ 300.00 1.00 $ 300.00 100.00% $ - 11 4" PCC Sidewalk 60 SF $ 6.00 108.50 $ 651.00 180.83% $ 291.00 12 Landscape Restoration 1100 SF $ 1.00 3701.75 $ 3,701.75 336.52% $ 2 601.75 13 Traffic Control 1 LS $ 400.00 1.00 $ 400.00 100.00% , $ Sub Total $ 28,669.28 Sub Total $ 5,275.03 ~~~~~~ f raymen[ ~o[ais i 2tl,ti69.28 I NO. DATE TOTAL CHANGE ORDE CHANGE ORDER DESCRIPTION AMOUNT PREVIOUS TOTAL AMOUNT CURRENT PAY PERIOD AMOUNT TOTAL AMOUNT TO DATE PERCENT 1 24-Sep-07 Rip Rap at the sump area - 30.114 tons ~ $20.00/ton S 616.80 $ - $ 616.110 $ 616.80 2 24-Sep-07 Intake Top w/ Ring & Cover $ 650.00 $ - $ 650.00 $ 650.00 3 24-Sep-07 Top Soil - 21 CY ~ $13/CY $ 273.00 $ - E 273.00 $ 273.00 4 24-Sep-07 6" PC Sidewalk - 52.47 SF (~ $7.00 $ 367.29 S - $ 367.29 $ 367.29 $ - s - $ - $ - ~ Total Change Order Work Performed to Date: $ 1,907.09 PROJECT COST SUMMARY Total ConUact Work Performed to Date: Total Change Order Work Pertormed to Dale: Total Contract and Change Order Work Due ConVactor: Total miscellaneous Project Costs: Total Engineering Work Performed: Total Land Acquisition and/or Easement Costs: TOTAL PROJECT COST: I hereby certy that fhe above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Milligen, Ciry Manager Dubuque, Iowa [~ Gus Psihoyos, Ciry Engineer Dubuque, Iowa S 28,669.28 S 1,907.09 E 30,576.37 S S 5,503.18 S - S 36,079.55 The Undersigned,_ .contractor for the above improvement, does hereby accept the above 'Total Due Contractor", as full settlement for all claims for said improvement. ~~ \\ 1/ ` / ~(~ ~C..J APPROVED• 1 ~l Q~ J 1 ~ (~(,~ /~'~ - ~ ~ ~i/ `~-~ `•i+-V `~