Loading...
US 52 Storm Sewer Improvement AcceptanceDubuque THE. CITY OF ~~• ~T T~ L, All-An~ricaCity Masterpiece orr the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: US 52 North Storm Sewer Improvement Project (CIP 7201810 &CIP 1001122) DATE: November 26, 2007 City Engineer Gus Psihoyos is recommending acceptance of the improvements for the US 52 North Storm Sewer Improvement Project, as completed by McClain Excavating Company, in the final contract amount of $178,150.63. I concur with the recommendation and respectfully request Mayor and City Council approval. V~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DT TT1 ~ All-AmericaCity V j,~ Masterpiece or7. the Mississippi 2007 TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer SUBJECT: US52 North Storm Sewer Improvement Project (CIP 7201810 &CIP 1001122) DATE: November 21, 2007 INTRODUCTION The enclosed resolution provides for the acceptance of the improvements for the US52 North Storm Sewer Improvement Project. BACKGROUND The US52 North Storm Sewer Improvement Project entailed the replacement of 24-inch diameter storm sewer with a 48-inch diameter storm sewer from the Flexsteel pumping station to US 52 and the replacement of two catch basins located at the low spot (sump) in US52 north of Olympic Heights and south of the Shooting Club drive. With jurisdiction over US52, the Iowa Department of Transportation (Iowa DOT) also had an interest in adequate stormwater drainage of the highway. As a result, the Iowa DOT indicated that the project is eligible for Iowa DOT cost-sharing. DISCUSSION The US52 North Storm Sewer Improvement Project was completed by McClain Excavating Company, Inc. of Peosta, Iowa, in the final contract amount of $178,150.63, which is a 6.1 % decrease from the original contract of $189,712. The primary reason for the decreased project cost is that only 28% of the estimated lime backfill was necessary. This was a savings of $11,490.84. RECOMMENDATION recommend that the City Council accept the improvements and to authorize the payment of the contract amount of $178,150.63 to McClain Excavating Company for the US52 North Storm Sewer Improvement Project. BUDGET IMPACT The project cost summary for the US52 North Storm Sewer Improvement Project is summarized as follows: Award Final Construction Contract $189,712.00 $178,150.63 Contingency 24,314.00 Engineering 40,119.00 41,899.15 Right-of-Way/Easement 3,072.00 3,049.50 $257,217.00 $223,099.28 According to the guidelines provided by the Iowa DOT, they will contribute $39,565.64 in project costs as part of an interagency agreement. This revenue will be applied toward the project. The project will be funded as follows: CIP CIP Name Amount 1001122 Jackson & Aquin Drainage $165,560.00 7201810 US52 Storm Sewer 57.539.28 Total Funding $223,099.28 The remaining balance of US 52 Storm Sewer CIP budget will be reserved for additional storm sewer improvements to be done in conjunction with the Iowa DOT resurfacing of US52 North in FY2009. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $178,150.63 to McClain Excavating Company for the US52 North Storm Sewer Improvement Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II RESOLUTION NO. 566-07 ACCEPTING THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the US52 North Storm Sewer Improvement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Jackson & Aquin Drainage Capital Improvement Project ($165,560.00) and US52 Storm Sewer Capital Improvement Project ($12,590.63) appropriation for the contract amount of $178,150.63 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such rtainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 3rd day of December 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE US52 NORTH STORM SEWER IMPROVEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the US52 North Storm Sewer Improvement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $223,099.28. Dated this 28th day of November, 2007. City Engineer Filed in the office of the City Clerk on the 29th day of November, 2007. Jeanne F. Schneider, CMC, City Clerk Project Name: uS52 NORTH PROJECT CLOSE OUT FORM STORM SEWER IMPROVEMENT CIP Number: CIP # : 1001122 & 7201810 rxe cmr of City of Dubuque Project Contract Amount: $189,712.00 Engineering DT T T Project Com letion Date: 12-Oct-o7 ~ B lJ 1. 50. W. 13th Street - Dubuque, IA 52001 Masterpiece on the Mississiyyi Contractor Name: McClain Excavatin Co., Inc. (563) 589-4270 Contractor Address: P.O. Box 77 City, State, Zip: Peosta, IA 52068-0077 Contractor Tele hone: 563-556-2348 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTrrY TOTAL PERCENT COMPLETE TOTAL Over /Under 1 Clearing & Grubbing 25860 SF $ 0.10 25860.00 $ 2,586.00 100.00% $ - 2 Topsoil Strip, Salvage, Stockpile and Spreading 94 CY $ 10.00 94.00 $ 940.00 100.00% $ - 3 Lime Backfill 2650 Ton $ 6.00 734.86 $ 4,409.16 27.73% $ (11,490.84) 4 Subbase (Patches) 241 SY $ 10.00 214.03 $ 2,140.30 88.81% $ (269.70) 5 Granular Surfacing 190 Tan $ 12.00 120.86 $ 1,450.32 63.61% $ (829.68) 6 Bedding Stone, 1" Clean 700 Ton $ 10.50 1077.08 $ 11,309.34 153.87% $ 3,959.34 7 Hot Mix Asphalt (Composite Section) 35 Ton $ 217.00 40.21 $ 8,725.57 114.89% $ 1,130.57 8 Patches, Full Depth Finish, By Count 8 Each $ 5.00 8.00 $ 40.00 100.00% $ - 9 Patches, Full Depth Finish, By Area 224 SY $ 65.00 214.03 $ 13,911.95 95.55% $ (648.05) 10 Plowable Mortar 17 CY $ 145.00 3.50 $ 507.50 20.59% $ (1,957.50) 11 RCP Storm Sewer 15" 6 LF $ 36.00 8.00 $ 288.00 133.33% $ 72.00 12 RCP Storrs Sewer 18" 6 LF $ 37.50 8.00 $ 300.00 133.33% $ 75.00 13 RCP Storm Sewer 24" 60 LF $ 130.00 55.00 $ 7,150.00 91.67% $ (650.00) 14 RCP Storm Sewer 36" 6 LF $ 57.00 8.00 $ 456.00 133.33% $ 114.00 15 RCP Stone Sewer 42" 75 LF $ 58.00 80.00 $ 4,640.00 106.67% $ 290.00 16 RCP Stone Sewer 48" 923 LF $ 67.50 914.50 $ 61,728.75 99.08% $ (573.75) 17 Stone Sewer, Manhole Type "M-A" 84" 3 Each $ 5,000.00 3.00 $ 15,000.00 100.00% $ - 18 Stone Sewer, Manhole Type "M-A" 108" 1 Each $ 6,960.00 1.00 $ 6,960.00 100.00% $ - 19 RCP Aprons Stone Sewer 48" 1 Each $ 800.00 1.00 $ 800.00 100.00% $ - 20 Stone Sewer, Intake RA-43 2 Each $ 2,950.00 2.00 $ 5,900.00 100.00% $ - 21 Storm Sewer, Intake RA-62 Modified 2 Each $ 2,570.00 2.00 $ 5,140.00 100.00% $ - 22 Removal of Intakes 2 Each $ 750.00 2.00 $ 1,500.00 100.00% $ - 23 Removal of Manholes 3 Each $ 750.00 3.00 $ 2,250.00 100.00% $ - 24 Storm Sewer Pipe, 24" HDPE 34 LF $ 40.00 34.00 $ 1,360.00 100.00% $ - 25 Seeding, Fertilizing & Mulching 2721 SY $ 1.00 2721.00 $ 2,721.00 100.00% $ - 26 Soil Erosion, Silt fences for ditch checks 90 LF $ 3.00 0.00 $ - 0.00% $ (270.00) 27 Soil Erosion, Silt fence 1050 LF $ 1.50 0.00 $ - 0.00% $ (1,575.00) 28 Stone Revetment Class C (Rip Rap) 50 Ton $ 22.00 13.77 $ 302.94 27.54% $ (797.06) 29 Revetment, Fabric, Engineering 92 SY $ 1.50 0.00 $ - 0.00% $ (138.00) 30 Fence, Remove & Replace Chain link 91 LF $ 1.50 262.00 $ 393.00 287.91% $ 256.50 31 Traffic Control 1 LS $ 8,500.00 1.00 $ 8,500.00 100.00% $ - 32 Mobilization 1 LS $ 5,000.00 1.00 $ 5,000.00 100.00% $ - Sub Total $ 176,409.83 $ (13,302.17) . ~ ~ - CHANGE ORDERS No. Date Description 1 16-Jul-07 Add drain file around storm sewerjunction boxes and manholes TOTAL 2 26-Jul-07 . Excavate Fiber and cut pipe to span gas main. $480.C 3 6-Nov-07 Delete Item 26, Soil Erosion, Sik Fence for ditch checks -due to terrain, not required $1,260.8 4 6-Nov-07 . Delete Item 27, Soil Erosion, Silt Fence -due to terrain, not required. $0 0 5 6-Nov-07 Delete Item 29, Revetment, Fabric, Engineering -due to terrain, not reauimd $0.0 Sub Total ~ $1 PROJECT COST SUMMARY Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Contract and Change Order Work Due Contractor: Total miscellaneous Project Costs: Total Engineering Work Pertormed: Total Land Acquiskion and/or Easement Costs: TOTAL PROJECT COST: I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. Gus Psihoyos, City Engineer Dubuque, Iowa APPROVED: DATE Michael Van Milligen, City Manager Dubuque,lowa __... _ ~~ ~ L- _ - ,~ Li-~'t~~ DATE / ~ ~Z~l " $ 176,409.83 $1,740.80 $178,150.63 $ - $ 41,899.15 $ 3,049.50 $217,000.28 The Undersigned,~CLCu1~1lCA~tatWC~c~ un,contractorfortheabove improvement, does hereby accept the above "Total Due Contractor", as full settlement fora ims f r said imp ement. APPROVED: DATE BY: