Loading...
Villa Street Retaining Wall Railing Project AcceptanceTHE ci-rY o~ ~T T ~ E V Dubuque AII-Arr~ri~a City Masterpiece an the Mississippi ,~ '; {~}~ 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Villa Street Retaining Wall -Ornamental Railing Project (CIP 3501432 -Steps, Railing, and Fence) DATE: November 26, 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Villa Street Retaining Wall -Ornamental Railing Project, as completed by Becker & Sons Stone Co., Inc., in the final contract amount of $94,861.15. I concur with the recommendation and respectfully request Mayor and City Council approval. / `~Z ~ r~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque '" DT T R ~ An-Ame~Ca City ~J LJ 1 Masterpiece an tl~e Mississippi t 2007 TO: Michael C. Van Milligen, City Mana er FROM: Gus Psihoyos, City Engineer SUBJECT: Villa Street Retaining Wall -Ornamental Railing Project (CIP 3501432 -Steps, Railing, and Fence) DATE: November 21, 2007 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract of the Villa Street Retaining Wall -Ornamental Railing Project. BACKGROUND In both 2000 and 2004, sections of the Villa Street retaining wall were reconstructed. As part of these wall repair projects, a majority of the existing limestone piers with cable guardrail, which extended the entire length of the wall top were removed and could not be salvaged. The cable guardrail that remained in place was not functionally adequate and several of the remaining piers were in poor condition and structurally deficient. The Villa Street Retaining Wall -Ornamental Railing all remaining piers and sub-standard cable guardrail and replication of the limestone piers along with the railing. The project extended from approximately Cleveland Park. DISCUSSION Project provided for the removal of and provided for the reconstruction installation of ornamental wall top 110 feet south of Rush Street to The Villa Street Retaining Wall -Ornamental Railing Project has been completed by Becker & Sons Stone Co., Inc. of Dubuque, Iowa, in the final contract amount of $94,861.15, which is a 9.40% decrease from the original contract amount of $104, 755.40. RECOMMENDATION recommend that the City Council accept the improvements and authorize the payment of the contract amount of $94,861.15 to Becker & Sons Stone Co., Inc. BUDGET IMPACT The project cost summary for the Villa Street Retaining Wall -Ornamental Railing Project is as follows: Construction Contract Award $104,755.40 Final $94,861.15 Contingency Construction Engineering & Inspection The project funding summary is as follows: CIP No. Fund Description 3501432 Steps, Railing and Fencing Total Project Funding ACTION TO BE TAKEN Fund Amount $101,253.43 $101,253.43 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $94,861.15 to Becker & Sons Stone Co., Inc. Prepared by Robert D. Schiesl, City Engineer cc: Jenny Larson, Budget Director Laura Carstens, Planning Services Manager Don Vogt, Public Works Director John Klostermann, Public Works 12,000.00 13,200.00 6,392.28 $129,955.40 $101,253.43 RESOLUTION NO. 569-07 ACCEPTING THE VILLA STREET RETAINING WALL - ORNAMENTAL RAILING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Villa Street Retaining Wall - Ornamental Railing Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Steps, Railing and Fencing Capital Improvement appropriation for the contract amount of $94,861.15 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 3rd day of December , 007. D. Buol, Mayor Attest Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE VILLA STREET RETAINING WALL -ORNAMENTAL RAILING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the. Villa Street Retaining Wall -Ornamental Railing Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $101,253.43. Dated this 21st day of November, 2007. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 28th day of November, 2007. Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL DATE: November 20, 2007 PROJECT NAME: VILLA STREET RETAINING WALL ORNAMENTAL RAILING PROJECT CONTRACTOR: Becker & Sons Stone Co CONTRACT AMOUNT: $104,755.40 BID ITEM DESCRIPTION UNIT UN T OST QUANTITY FINEARN ODUNT ~' ~~ASExB1D 1 Mobilization LS $ 200.00 1.0 $ 200.00 2 Excavation, Wall Stone /Concrete Removal SF $ 6.00 296.77 $ 1,780.62 3 Remove 8~ Dispose, Existing Limestone Piers EACH $ 100.00 21.0 $ 2,100.00 4 Remove & Dispose, Existing Cable Guardrail LS $ 100.00 1.0 $ 100.00 5 Remove & Dispose, Existing Fence & Posts LS $ 50.00 1.0 $ 50.00 6 Temporary Fencing LS $ 100.00 1.0 $ 100.00 7 Retaining Wall, Limestone -Complete SF $ 42.00 402.19 $ 16,891.98 8 Limestone Piers, Construct New-Complete EACH $ 1,100.00 33.0 $ 36,300.00 9 Standard Ornamental Hoop Railing, 42" Height LF $ 68.58 526.0 $ 36,073.08 10 Topsoil, 12" Backfill -Complete SF $ 2.00 330.0 $ 660.00 11 Seed, Fertilize & Mulch SF $ 0.45 $ - 12 Traffic & Safety Control LS $ 100.00 1.0 $ 100.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 94 355.68 .~ rCHA G ER "EX RA,WORK,.,~'. ~~ '' ~ ~ ;. ,. 13 Reset North End Cap Stone SF $ 21.50 6.21 $ 133.52 14 Reset Mid Section Cap Stone SF $ 21.50 17.30 $ 371.95 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 505.47 TOTAL AMOUNT EARNED TO DATE: $ 94 861.15 TOTAL DUE CONTRACTOR: $ 94,881.15 CONSTRUCTION ENGINEERING & INSPECTION: TOTAL IMPROVEMENT COST: $ 94 861.15 CERTIFICATE OF THE CITY MANAGER: APPROVED Michael Van Milligen, City Manager City of Dubuque, Iowa CERTIFICATE OF THE CITY E APPROVED: _~-~ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Becker 8 Sons Stone Co contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: Be er 8~ Sons Stone Co BY: TITLE: ---S~f6«~ DATE: ~~ ~02 D~D 7