Highway 20 Landscaping Project Phase II AcceptanceTx~ CITY a~ Dubuque V L ~ All-An~rica City t Masterpiece orr the Mississippi zoos TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Highway 20 Landscaping Project, Phase II, #1114 DATE: December 13, 2007 Leisure Services Manager Gil Spence is recommending acceptance of the Highway 20 Landscaping Project, Phase II, as completed by Smith Seeding, Inc. in the final contract amount of $231,417. I concur with the recommendation and respectfully request Mayor and City Council approval. ,~v ~' /tom / ~'~~~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gil D. Spence, Leisure Services Manager THE CTTY OF DUB E Masterpiece on the Mississippi MEMORANDUM December 11, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Ma SUBJECT: Highway 20 Landscaping Project, Phase II, #1114 INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Highway 20 Landscaping Project, Phase II. DISCUSSION The Highway 20 Landscaping Project, Phase II has been completed by Smith Seeding, Inc. in the final contract amount of $231,417. A summary of the project costs is as follows: Bid Amount Final Cost construction contract $ 240,657 $ 231,417 The difference in the final cost from the bid is because the quantity of mulch and planting soils was less than the plans called for. Silt fence ($1,200) was not needed and reflects on the reduced price. The FY 2006 C.I.P. budget contains $245,000 for this project, $144,842 from the TE grant and $100,000 of IDOT funds from the Living Roadway Trust Fund. A summary of total project costs are as follows: construction contract $ 231,417 design/inspection 15,000 TOTAL $ 246,417 Highway 20, Phase II, page two The final inspection bill has not been received so the $15,000 design/inspection number is an estimate. Any budget overrun will come from savings from the Murphy Park Tennis Court Parking Lot Paving Project. ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvement and setting the final cost. GDS:et attachments Preparer: Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 589-07 ACCEPTING IMPROVEMENT WHEREAS, the contract for the Highway 20 Landscaping Project, Phase II has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW; THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 17th day of December , 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263 RESOLUTION NO. 590-07 FINAL ESTIMATE WHEREAS, the contract for the Highway 20 Landscaping Project, Phase II has been completed and the Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $231,417, and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of December , 2007. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, City Clerk THE CITY OF DUB E Masterpiece on the Mississippi MEMORANDUM December 11, 2007 TO: Michael C. Van Milligen, City Manager FROM: Gil D. Spence, Leisure Services Manager SUBJECT: Highway 20 Landscaping Project, Phase II, #1114 INTRODUCTION The purpose of this memorandum is to recommend that the City Council accept the Highway 20 Landscaping Project, Phase II. DISCUSSION The Highway 20 Landscaping Project, Phase II has been completed by Smith Seeding, Inc. in the final contract amount of $231,417. A summary of the project costs is as follows: Bid Amount Final Cost construction contract $ 240,657 $ 231,417 The difference in the final cost from the bid is because the quantity of mulch and planting soils was less than the plans called for. Silt fence ($1,200) was not needed and reflects on the reduced price. The FY 2006 C.I.P. budget contains $245,000 for this project, $144,842 from the TE grant and $100,000 of IDOT funds from the Living Roadway Trust Fund. A summary of total project costs are as follows: construction contract $ 231,417 design/inspection 15,000 TOTAL $ 246,417 Highway 20, Phase II, page two The final inspection bill has not been received so the $15,000 design/inspection number is an estimate. Any budget overrun will come from savings from the Murphy Park Tennis Court Parking Lot Paving Project. ACTION STEP The action requested is that the City Council adopt the attached resolutions accepting the improvement and setting the final cost. GDS:et attachments