TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Highway 20 Landscaping Project, Phase II, #1114
DATE: December 13, 2007
Leisure Services Manager Gil Spence is recommending acceptance of the Highway 20
Landscaping Project, Phase II, as completed by Smith Seeding, Inc. in the final contract
amount of $231,417.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
,~v
~' /tom / ~'~~~
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gil D. Spence, Leisure Services Manager
THE CTTY OF
DUB E
Masterpiece on the Mississippi
MEMORANDUM
December 11, 2007
TO: Michael C. Van Milligen, City Manager
FROM: Gil D. Spence, Leisure Services Ma
SUBJECT: Highway 20 Landscaping Project, Phase II, #1114
INTRODUCTION
The purpose of this memorandum is to recommend that the City Council accept the
Highway 20 Landscaping Project, Phase II.
DISCUSSION
The Highway 20 Landscaping Project, Phase II has been completed by Smith Seeding,
Inc. in the final contract amount of $231,417. A summary of the project costs is as
follows:
Bid Amount Final Cost
construction contract $ 240,657 $ 231,417
The difference in the final cost from the bid is because the quantity of mulch and
planting soils was less than the plans called for. Silt fence ($1,200) was not needed
and reflects on the reduced price.
The FY 2006 C.I.P. budget contains $245,000 for this project, $144,842 from the TE
grant and $100,000 of IDOT funds from the Living Roadway Trust Fund.
A summary of total project costs are as follows:
construction contract $ 231,417
design/inspection 15,000
TOTAL $ 246,417
Highway 20, Phase II, page two
The final inspection bill has not been received so the $15,000 design/inspection number
is an estimate. Any budget overrun will come from savings from the Murphy Park
Tennis Court Parking Lot Paving Project.
ACTION STEP
The action requested is that the City Council adopt the attached resolutions accepting
the improvement and setting the final cost.
GDS:et
attachments
Preparer: Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263
RESOLUTION NO. 589-07
ACCEPTING IMPROVEMENT
WHEREAS, the contract for the Highway 20 Landscaping Project, Phase II has
been completed and the City Manager has examined the work and filed his certificate
stating that the same has been completed according to the terms of the contract, plans and
specifications and recommends its acceptance.
NOW; THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
1. That the recommendation of the City Manager be approved and that said
improvement be and the same is hereby accepted.
BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed
to pay to the contractor from the General Fund in amount equal to the amount of his
contract, less any retained percentage provided for therein.
Passed, approved and adopted this 17th day of December , 2007.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, City Clerk
Preparers Gil D. Spence Address: 2200 Bunker Hill Rd Phone: (563) 589-4263
RESOLUTION NO. 590-07
FINAL ESTIMATE
WHEREAS, the contract for the Highway 20 Landscaping Project, Phase II has
been completed and the Engineer has submitted his final estimate showing the cost
thereof including the cost of estimates, notices and inspection and all miscellaneous costs;
NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. That the cost of said improvement is hereby determined to be $231,417,
and the said amount shall be paid from the General Fund of the City of Dubuque, Iowa.
Passed, approved and adopted this 17th day of December , 2007.
Roy D. Buol, Mayor
Attest:
Jeanne F. Schneider, City Clerk
THE CITY OF
DUB E
Masterpiece on the Mississippi
MEMORANDUM
December 11, 2007
TO: Michael C. Van Milligen, City Manager
FROM: Gil D. Spence, Leisure Services Manager
SUBJECT: Highway 20 Landscaping Project, Phase II, #1114
INTRODUCTION
The purpose of this memorandum is to recommend that the City Council accept the
Highway 20 Landscaping Project, Phase II.
DISCUSSION
The Highway 20 Landscaping Project, Phase II has been completed by Smith Seeding,
Inc. in the final contract amount of $231,417. A summary of the project costs is as
follows:
Bid Amount Final Cost
construction contract $ 240,657 $ 231,417
The difference in the final cost from the bid is because the quantity of mulch and
planting soils was less than the plans called for. Silt fence ($1,200) was not needed
and reflects on the reduced price.
The FY 2006 C.I.P. budget contains $245,000 for this project, $144,842 from the TE
grant and $100,000 of IDOT funds from the Living Roadway Trust Fund.
A summary of total project costs are as follows:
construction contract $ 231,417
design/inspection 15,000
TOTAL $ 246,417
Highway 20, Phase II, page two
The final inspection bill has not been received so the $15,000 design/inspection number
is an estimate. Any budget overrun will come from savings from the Murphy Park
Tennis Court Parking Lot Paving Project.
ACTION STEP
The action requested is that the City Council adopt the attached resolutions accepting
the improvement and setting the final cost.
GDS:et
attachments