Loading...
NW Arterial Hike/Bike Trail Phases 4 & 5 Copyright 2014 City of Dubuque Items to be set for Public Hearing # 1. ITEM TITLE: NW Arterial Hike/Bike Trail Phases 4 & 5 SUMMARY: City Manager recommending initiation of the public bidding procedure for the Iowa 32 Hike-Bike Trail-Phase 4 & 5 Project, and further recommends that a public hearing be set for August 3, 2015. RESOLUTION Preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s), Set Public Hearing for 8/3/15 ATTACHMENTS: Description Type ❑ Iowa 32 Hike-Bike Trail-Phase 4&5-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution and Public Notice Resolutions ❑ Notice to Bidders Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Iowa 32 Hike-Bike Trail — Phase 4 & 5 DATE: July 14, 2015 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the Iowa 32 Hike-Bike Trail-Phase 4 & 5 Project, and further recommends that a public hearing be set for August 3, 2015. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITTYTOF D�J L E nn-America 11111" Masterpiece on the Mississippi 2012 TO: Michael C. Van Milligen, City Manager,,,---) FROM: Gus Psihoyos, City Engineer SUBJECT: Iowa 32 Hike-Bike Trail - Phase 4 & 5 DATE: July 13, 2015 INTRODUCTION The enclosed resolution authorize the public bidding procedure for the Iowa 32 Hike- Bike Trail — Phase 4 & 5 Project. BACKGROUND Previously, the Iowa 32 Hike-Bike Trail has been constructed from US 52 to Holliday Drive near McDonalds. In 2014 and 2015 the City of Dubuque received two Iowa Department of Natural Resources REAP (Resource Enhancement and Protection) grants totaling $400,000. The City budgeted $50,000 to be used toward the project in FY 2015. DISCUSSION The Iowa 32 Hike-Bike Trail — Phase 4 & 5 Project will include the construction of a 4400 foot long 10 foot wide asphalt trail from Holliday Drive to Chavanelle Drive. The project will also include on street pavement markings and associated signage along Chavanelle Drive to direct bicyclists to the trail access near Bergfeld Pond. Additionally, a sidewalk and associated retaining wall will be constructed to allow access to the east side of the bridge near the pond. This will allow the bridge to be accessed from both ends. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process July 20, 2015 Publish Notice to Bidders, Advertise for Bids July 24, 2015 Publish Public Hearing Notice on Plans & Specs July 24, 2015 Public Hearing on Plans & Specs, August 3, 2015 Receipt of Bid Proposals (Bid-Letting) August 6, 2015 Award Construction Contract August 17, 2015 Project Completion Date November 15, 2015 RECOMMENDATION I recommend that the City Council give preliminary approval to the construction plans and specifications and establish August 3, 2015, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the Iowa 32 Hike-Bike Trail — Phase 4 & 5 Project. BUDGET IMPACT The estimate of probable cost for the Iowa 32 Hike-Bike Trail - Phase 4 & 5 Project is as follows: Estimate Construction Contract $ 389,450.00 Contingency 30,000.00 Construction Engineering & Inspection 30,550.00 Total Project Cost $450,000.00 The project funding summary is as follows: CIP No. Fund Description Fund Amount FY 2014 REAP Grant $ 200,000.00 FY 2015 REAP Grant 200,000.00 3502430 Trails/Complete Streets 47,000.00 3001425 City Owned Sidewalks 3,000.00 Total Project Funding $450,000.00 REQUESTED ACTION The City Council is requested to establish the date of the public hearing, and authorize the City Clerk to advertise for bid proposals through the adoption of the enclosed resolutions for the Iowa 32 Hike-Bike Trail — Phase 4 & 5 Project. cc: Marie Ware, Leisure Services Manager Laura Carstens, City Planning Manager RESOLUTION NO. 252-15 IOWA 32 HIKE -BIKE TRAIL PHASE 4 AND 5 PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Iowa 32 Hike -Bike Trail Phase 4 and 5 Project in the estimated amount $450,000.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 3rd day of August, 2015, at 6:30 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Iowa 32 Hike -Bike Trail Phase 4 and 5 Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids forthe construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 6th day of August, 2015. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 17t" day of August, 2015, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 20th day of July, 2015. Attest: Kevin S. Firnstahl, CMC, City Clerk Roy D. Buol, Mayor CITY OF DUBUQUE OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE IOWA 32 HIKE-BIKE TRAIL PHASE 4 AND 5 PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Iowa 32 Hike-Bike Trail Phase 4 And 5 Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 3rd day of August, 2015, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: • This project will include the construction of a 4400 foot long asphalt trail which is 10 feet wide between Holliday Drive and Chavanelle Drive along the west side of IA 32. The trail will be constructed in Iowa DOT ROW. The construction will include 4" thick HMA pavement with 8" thick granular stone base. 3" breaker stone has been estimated for 25% of the trail to be used for additional stability. The trail will be graded to a width of 12' wide to allow for the stone base and paving operations. Additionally, 66 bike sharrows will be painted on Chavanelle Road from the trail at IA 32 to the bike trail east of Bergfeld Pond. • A small 250 SF Versalok or approved equal retaining wall will be constructed at Bergfeld pond to allow for construction of ADA accessible sidewalk to the east side of the bridge. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 20th day of July, 2015. Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT IA 32 HIKE-BIKE TRAIL PHASE 4 AND 5 PROJECT 120.1 Time and Place for Filing Sealed Proposals Sealed Bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on August 6tn, 2015 in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. 120.2 Time and Placed Sealed Proposals Will be Opened and Considered Sealed proposals will be opened and Bids tabulated at 2:00p.m. on August 6cn 2015, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council at its meeting on August 17th, 2015. The City of Dubuque, Iowa, reserves the right to reject any and all Bids. 120.3 Time for Commencement and Completion of Work Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued and shall be fully completed by November 15th, 2016. 120.4 Bid Security Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state- chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. 120.5 Contract Documents Copies of the Contract Documents may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001 . The Contract Documents will also be available on the City's website at www.citvofdubuque.org/bids.aspx. No plan deposit is required. 120.6 Preference for Iowa Products and Labor By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. 120.7 Sales Tax The Bidder should not include State of Iowa sales tax in its Bid. A sales tax exemption certificate will be available for all material purchased in Iowa for incorporation into the Project. 120.8 General Nature of Public Improvement Project IA 32 Hike-Bike Trail phase 4 and 5 Project CIP # 3502430 This project will include the construction of a 4400 foot long asphalt trail which is 10 feet wide between Holliday Drive and Chavanelle Drive along the west side of IA 32. The trail will be constructed in Iowa DOT ROW. The construction will include 4" thick HMA pavement with 8" thick granular stone base. 3" breaker stone has been estimated for 25% of the trail to be used for additional stability. The trail will be graded to a width of 12' wide to allow for the stone base and paving operations. Additionally, 66 bike sharrows will be painted on Chavanelle Road from the trail at IA 32 to the bike trail east of Bergfeld Pond. A small 250 SF Versalok or approved equal retaining wall will be constructed at Bergfeld pond to allow for construction of ADA accessible sidewalk to the east side of the bridge. Published in the Telegraph Herald on July 24, 2015