Loading...
U.S. Federal Energy Regulatory Commission Copyright 2014 City of Dubuque Consent Items # 20. ITEM TITLE: U.S. Federal Energy Regulatory Commission SUMMARY: Notice from the U.S. Federal Energy Regulatory Commission of a preliminary permit application proposing to study the feasibility of a hydroelectric project at Lock and Dam No. 11 . SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Refer to City Manager ATTACHMENTS: Description Type 0 USFERC Notice Supporting Documentation "EDERAL ENERGY U.S.POSTAGE>>PITNEY BOWES ^WLATORY COMMISSION first Street NE �• 4 � ,?- "' Ipgton,DC 20426 Of p f 20001 02 1VV $ 000.485 RECEIVED /(=D � 0001371365AUG. 20. 2015. l AHII= OQ 15 AUG ZF City Clerk's Office Dubuque-, I� Docket No.: P-14687 Dubuque City Clerk City of Dubuque 50 W 13th Street . Dubuque, IA` 52001- I UNITED STATES OF AMERICA Project No. 14687-000 -2- FEDERAL ENERGY REGULATORY COMMISSION from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Energy Resources USA Inc. Project No. 14687-000 Please file comments,motions to intervene,notices of intent,and competing applications using the Commission's eFiling system at htip://www.ferc.gov/docs-filing/efiling.asp. NOTICE OF PRELIMINARY PERMIT APPLICATION ACCEPTED FOR FILING Commenters can submit brief comments up to 6,000 characters,without prior registration, AND SOLICITING COMMENTS,MOTIONS TO INTERVENE,AND COMPETING using the eComment system at http://www.ferc.gov/docs-filing/ecomment.as]). You must APPLICATIONS include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov,(866)208-3676 (August 20,2015) (toll free),or(202)502-8659(TTY). In lieu of electronic filing,please send a paper copy to: Secretary,Federal Energy Regulatory Commission,888 First Street,NE,Washington, On June 25,2015,the Energy Resources USA Inca filed an application fora preliminary permit under section 4(f)of the Federal Power Act proposing to study the DC 20426. The first page of any filing should include docket number P-14687-000. feasibility of the proposed Lock and Dam No.I l Hydroelectric Project No.14687-000,to More information about this project,including a copy of the application,can be be located at the existing Mississippi River Lock and Dam No. 11 on the Mississippi viewed or printed on the"eLibrary"link of Commission's website at River,near the City of Dubuque,in Grant County,Wisconsin. The Mississippi River http://www.ferc.-ov/docs-filina/elibrary.asp. Enter the docket number(P-14687)in the Lock and Dam No. 11 is owned by the United States government and operated by the docket number field to access the document. For assistance,contact FERC Online U.S.Army Corps of Engineers. Support at 1-866-208-3676. The sole purpose of a preliminary permit,if issued,is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter Kimberly D.Bose, upon lands or waters owned by others without the owners'express permission. Secretary. The proposed project would consist of: (1)a new 770-foot-long by 300-foot-wide earthen intake area;(2)a new 220-foot by 90-foot concrete powerhouse containing four 2.5-megawatt hydropower turbine-generators having a total combined generating capacity of 10 megawatts;(3)one new 1000-foot-long by.220-foot-wide tailrace;(4)a new intake retaining wall and new tailrace retaining wall each measurina 85-foot-long by 43-foot- high by 3-foot-thick;(5)a new 50-foot by 60-foot switchyard;(6)a new 1.52-mile-long, 69-kilovolt transmission line;and(7)appurtenant facilities. The project would have an estimated annual generation of 119,655 megawatt-hours. Applicant Contact: Mr.Ander Gonzalez,2655 Le Jeune Road,Suite 804,Coral Gables,Florida 33134;telephone+34 932523840. FERC Contact: Tyrone A.Williams,(202)502-6331. Deadline for filing comments,motions to intervene,competing applications (without notices of intent),or notices of intent to file competing applications: 60 days