Loading...
2015 SCADA Manhole Installation Project - Initiation Copyright 2014 City of Dubuque Items to be set for Public Hearing # 1. ITEM TITLE: SCADA Manhole Installation Project SUMMARY: City Manager recommending initiation of the public bidding process for the 2015 SCADA (flow metering stations) Manhole Installation Project, and further recommends that a public hearing be set for November 16, 2015. RESOLUTION Preliminary approval of plans, specifications, form of contract, and estimated cots; setting date of public hearing on plans, specifications, form of contract, and estimated cots; and ordering the advertisement for bids SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s), Set Public Hearing for 11/16/15 ATTACHMENTS: Description Type ❑ 2015 SCADA Manhole Installation Project-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 SCADA (flow metering stations) Manhole Installation Project CI P 7101335 DATE: October 28, 2015 Environmental Engineer Denise Ihrig recommends initiation of the public bidding process for the 2015 SCADA (flow metering stations) Manhole Installation Project, and further recommends that a public hearing be set for November 16, 2015. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Denise Ihrig, Environmental Engineer Gus Psihoyos, City Engineer THE CITY OF -- Du_ ub que DUB E All-AnWIcaCtly Masterpiece on the Mississippi 2012,201.4 TO: Michael C. Van Milligen, City Manager FROM: Denise Ihrig, Environmental Engineer OPT- SUBJECT: 2015 SCADA(flow metering stations) Manhole Installation Project CIP 7101335 DATE: October 27, 2015 INTRODUCTION The enclosed resolution authorizes the public bidding procedure for the 2015 SCADA (flow metering stations) Manhole Installation Project. BACKGROUND The City of Dubuque, Iowa has entered into a Consent Decree in the case of The United States of America, and the State of Iowa v. The City of Dubuque, Iowa, Civil Action No. Case 2:11-cv- 01011-EMJ, Civil Action Number 2008V00041, DOJ Case Number 90-5-1-1-09339, United States District Court for the Northern District of Iowa. The provisions of the Consent Decree apply to and are binding upon the City and its officers, directors, employees, agents, servants, successors, assigns, and all persons, firms and corporations under contract with the City to perform the obligations of the Consent Decree. The City is required to perform collection system flow monitoring per a schedule established in the Consent Decree, the City is flow monitoring beyond the schedule using supervisory control and data acquisition (SCADA) system technology in sanitary sewer manholes. We are requesting several sanitary sewer manholes (flow metering stations) be replaced to provide the best conditions for permanent flow monitoring. DISCUSSION The Consent Decree identifies five sewersheds, that are required to be individually flow metered for specific periods over a five year schedule. While flow metering for short periods of time may result in locating inflow under one or two rain events, it will not capture how the sanitary sewer system will perform under different or changing rain patterns more commonly seen. Long term or permanent flow monitoring is a method used to continually meter the sanitary sewer system, so staff can observe changes in flow; document and measure how rain events impact the system; and provide valuable feedback on how capital improvements have or have not reduced inflow. The proposed permanent flow metering stations are designed to not only monitor and record flows, but also report them in real-time triggering an alarm if there are any changes in the system where a flow meter is in place. In the event of increased flows or water level changes, or a fouled meter sensor, the flow metering stations will report via the SCADA system to Public Works, the W&RRC, and the Engineering department for immediate response to reduce the possibility of sanitary sewer overflows. FAPROJECTS\Storm and Sanitary\Sanitary\SCADA Manholes\Council\INITIATE\Initiate Memo-2015 SCADA Manhole Installation Project.doc This project involves the replacement of four(4) sanitary sewer manholes and their conversion to permanent flow metering stations in Sewersheds 7 (a & b), 11, and 12, please see the following location map. ow &htfitt-ratioit Progrartt I $rnefaau SezrxrsF>.�<so�'�,'ns�xrtsr! A� . cCgyH!`(RO. KENNEDY RD f DERBY GRANGE RD ' W 32ND ST � '4-wcrsl wQ' a R4 sY c 61/15 KALIF MANN AVE 'IST ST o � Pit GUPST RD A K IXFf Rf9 X PENN$YLVANIAAVE e r I Ic pCHAVE"F tE RO y m (x y 'IV DAGIS (� The flow metering station for Sewershed 5 is installed and will be operational by November 11, 2015; and the metering station for Sewershed 10 will be delayed until the completion of Phase 2 of the Bee Branch project. Portions of some water mains may need to be relocated as part of this project due to the replacement of the manholes. PROJECT SCHEDULE The proposed schedule for the 2015 SCADA(flow metering stations) Manhole Installation Project Initiate Public Bidding Process November 2, 2015 Publish Notice to Bidders, Advertise for Bids November 6, 2015 Publish Public Hearing Notice on Plans & Specs November 6, 2015 Public Hearing on Plans & Specifications November 16, 2015 Receipt of Bid Proposals (Bid Letting) November 19, 2015 Award Construction Contract December 7, 2015 Project Completion Date April 29, 2016 2 RECOMMENDATION I request the City Council give preliminary approval to the construction plans and specifications, authorize the City Clerk to advertise for bids, and establish November 16, 2015, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the SCADA(flow metering stations) Manhole Installation Project 2015. BUDGETIMPACT The estimate of probable cost for the 2015 SCADA(flow metering stations) Manhole Installation Project: Estimate Construction Contract $ 105,000.00 Contingency $ 10,500.00 Construction Engineering & Inspection 1 15,750.00 Total Project Cost $ 131,250.00 The project funding summary is as follows: Available CIP No. Fund_Description Funding 7101335 Sanitary Sewer Manhole Replacement $ 267,000.00 REQUESTED ACTION I am requesting authorization to seek bids for the 2015 SCADA (flow metering stations) Manhole Installation Project through adoption of the enclosed resolutions. cc: Jenny Larson, Budget Director Gus Psihoyos, City Engineer Ken TeKippe, Finance Director Todd Irwin, Engineering Technician 3 RESOLUTION NO. 379-15 2015 SCADA (FLOW METERING STA -TIONS) MANHOLEINSTALLATIONPROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the 2015 SCADA(flow metering stations) Manhole Installation Project in the estimated construction amount $105,000.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 16th day of November 2015, at 6:30 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not Tess than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The 2015 SCADA(flow metering stations) Manhole Installation Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 19nd day of November 2015. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 7nd day of December 2015, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 2nd day of November, 2015. Attest: Kevf S TFirnstahl, '& 4'0 City Clerk Fl` Roy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2015 SCADA(FLOW METERING STATIONS) MANHOLE INSTALLATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 2015 SCADA(flow metering stations) Manhole Installation Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 16th day of November 2015, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: This project involves the replacement of four (4) sanitary sewer manholes and their conversion to permanent flow metering stations in Sewersheds 7 (a & b), 11 , and 12. Portions of some water mains may need to be relocated as part of this project due to the replacement of the manholes. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the _ day of 12015 Kevin S. Firnstahl, CMC, City Clerk NOTICE TO BIDDERS SECTION 00120 CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT 2015 SCADA (Flow Metering Stations) Manhole Installation Project 120.1 Time and Place for Filing Sealed Proposals Sealed Bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on November 19, 2015, in the Office of the City Clerk, City th Hall - First Floor, 50 West 13 Street, Dubuque, Iowa. 120.2 Time and Placed Sealed Proposals Will be Opened and Considered Sealed proposals will be opened and Bids tabulated at 2:00p.m. on November th 19, 2015, at City Hall - Conference Room C, 50 West 13 Street, Dubuque, Iowa, for consideration by the City Council at its meeting on December 7, 2015. The City of Dubuque, Iowa, reserves the right to reject any and all Bids. 120.3 Time for Commencement and Completion of Work Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued. All manholes must be installed by March 31, 2016 and be fully completed by June 30, 2016. 120.4 Bid Security Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier’s check or certified check drawn on a state- chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. 120.5 Contract Documents Copies of the Contract Documents may be obtained at the Engineering th Department, City Hall – Second Floor, 50 West 13 Street, Dubuque, Iowa 52001. The Contract Documents will also be available on the City’s website at www.cityofdubuque.org/bids.aspx. No plan deposit is required. 120.6 Preference for Iowa Products and Labor By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. 120.7 Sales Tax The Bidder should not include State of Iowa sales tax in its Bid. A sales tax exemption certificate will be available for all material purchased in Iowa for incorporation into the Project. 120.8 General Nature of Public Improvement Project 2015 SCADA (Flow Metering Stations) Manhole Installation Project, CIP # 7101335 This project will include the installation of; four manholes, associated piping, conduit, precast hand holes and vaults, and fiber hub cabinets. Conduit is both trenched and directionally drilled. This project does require a permitted confined space entry at one of the four locations. The SCADA manhole located at Fulton Elementary School will need to be coordinated with the Dubuque Community School District and be completed during the holiday break. The Davis-Bacon Federal Prevailing Wage Act is not applicable for this project. Published in the Telegraph Herald on November 6, 2015