Acceptance of Asphalt Overlay Access Ramp Project One Copyright 2014 City of Dubuque Consent Items # 7. ITEM TITLE: Acceptance of Asphalt Overlay Access Ramp Project One SUMMARY: City Manager recommending acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project One as completed by Midwest Concrete, Inc. RESOLUTION Accepting the 2015 Asphalt Overlay Project Curb Access Ramps Project One and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 2015 Asphalt Overlay Access Ramp Project One-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 Asphalt Overlay Access Ramp Project One (CIP 30012277) DATE: November 29, 2015 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project One, as completed by Midwest Concrete, Inc., in the final contract amount of$50,153.54, which is 4.91% under the contract amount of$52,743. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer TI-j1 C � F s„r' _ Uque —'_ 11111 11 L)Ut y _TAll-AmedcaClty DttJ;B _--�..Y�— 1 1 1 Masterpiece oti the Mississippi 2007.2012,2013 TO: Michael C. VanMilligen, City Manager FROM: Gus Psihoyos, City Engineer TSG SUBJECT: 2015 Asphalt Overlay Access Ramp Project One (CIP 30012277) DATE: November 25, 2015 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project One. BACKGROUND The purpose of this project was to replace fourteen non-compliant access ramps with twenty-two directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program and involved the intersections of: • Spires Drive & Clarke Crest Drive – one double ramp and one single ramp • Clarke Crest Court & Clarke Crest Drive - one double ramp and one single ramp • Dunham Drive & Clarke Crest Drive—One double ramp and two additional ramps • Farrell Court & Clarke Crest Drive – One double ramp and two single ramps • Lacey Court & Clarke Crest Drive - two single ramps • Kuhn Lane & Clarke Crest Drive - two single ramps • Ravenwood Court & Clarke Crest Drive – one double ramp and two single ramps In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, the City solicited informal bids for the 2015 Asphalt Overlay Access Ramp Project One. The City received two bids from the following contractors: Contractor Bid Results Midwest Concrete, Inc. $ 52,743.00 Reuter Mechanical Inc. DBA East Iowa Construction $ 57,578.00 Midwest Concrete, Inc. of Peosta, Iowa, submitted the low bid in the amount of $52,743.00. The low bid was 4.43% below the Engineer's estimate of $55,185.00. DISCUSSION The Asphalt Overlay Project - Curb Access Ramps Phase One was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of$50,153.54 which is 4.91% under the contract amount of$52,743.00. The average cost per ramp was $2,565.02. Due to the topography of the area; all sidewalks were installed to the maximum limits in an effort to achieve the proper slopes mandated by Public Right of Way Accessibilities Guidelines (PROWAG) standards. BUDGETIMPACT The project cost summary for the 2015 Asphalt Overlay Access Ramp Project One is as follows: Award Final Construction Contract $52,743.00 $50,153.54 Contingency $5,274.30 0.00 Construction Engineering & Inspection $8,702.60 6,276.98 Total Project Cost SBL719.90 S56,430.52 The funding summary for the project is as follows: CIP Fund Description Fund Amount 30012277 Asphalt Overlay Project Curb Access Ramps Phase $56,430.52 Three Total Project Funding $56,430.52 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the 2015 Asphalt Overlay Access Ramp Project One. Prepared By: Tom Kopp, Engineering Technician cc: Don Vogt, Public Works Director John Klostermann, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 RESOLUTION NO. 405-15 ACCEPTING THE 2015 ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PROJECT ONE AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2015 Asphalt Overlay Project Curb Access Ramps Project One (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 2015 Asphalt Overlay Project Curb Access Ramps appropriations for the contract amount of $50,153.54, less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 7th day of December, 2015. Attest: Kevin Firnstahl, CM'E, City Clerk Ly/fin V. Sutton, Mayor Pro Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2015 ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2015 Asphalt Overlay Project Curb Access Ramps Project One, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $50,153.54. Dated this day of 2015. Filed in the office of the City Clerk on the Gus Psihoyos, City Engineer irnstahi, _ C, City Clerk