Acceptance of Asphalt Overlay Access Ramp Project Two Copyright 2014 City of Dubuque Consent Items # 8. ITEM TITLE: Acceptance of Asphalt Overlay Access Ramp Project Two SUMMARY: City Manager recommending acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project Two as completed by Midwest Concrete, Inc. RESOLUTION Accepting the 2015 Asphalt Overlay Project Curb Access Ramps Project Two and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type ❑ 2015 Asphalt Overlay Project Two-MVM Memo City Manager Memo ❑ Staff Memo Staff Memo ❑ Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 Asphalt Overlay Access Ramp Project Two (CIP 30012277) DATE: November 29, 2015 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project Two, as completed by Midwest Concrete, Inc., in the final contract amount of$75,604.43, which is 10.05% over the contract amount of$68,697.40. It was determined an additional 70 linear feet of curb and gutter needed to be replaced in areas slated for asphalt, soil conditions required additional base stone for stabilization, additional sidewalk was poured to attain proper slopes, a storm water intake was replaced at Mullin & Asbury, and landscaping restoration required more topsoil and seeding due to the slopes of embankments at the back of sidewalk. These additions contributed to the increase in the final contract amount. However, the original total project cost with contingency and construction engineering and inspection was estimated at $86,902.21 and came in at $81,881.41 1 concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer TETE cI'TY OF r" Dttbitgtie DUB1� All-America City 11111.1 Masterpiece oii the Mississippi 14107.21112,71113 TO: Michael C. VanMilligen, City Manager. FROM: Gus Psiho os, City En ineer _�F�.-�-) SUBJECT: 2015 Asphalt Overlay Access Ramp Project Two (CIP 30012277) DATE: November 23, 2015 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2015 Asphalt Overlay Access Ramp Project Two. BACKGROUND The purpose of this project was to replace twenty-six non-compliant access ramps with twenty-six directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program and involved the intersections of: • Asbury Road & Mullin Road -- two single ramps • Hillcrest Road & Mullin Road -- two single ramps • Asbury Road & Ogilby Road —two single ramps • Valley View Road & Chaney Road —two single ramps • Asbury Road & Morning View Road -- two single ramps • Valley View Road & Morning View Road —four single ramps • Hillcrest Road & Morning View Road —two single ramps • Asbury Road & Broad Lawn Road —two single ramps • Valley View Road & Broad Lawn Road —four single ramps • Hillcrest Road & Broad Lawn Road —two single ramps. • Valley View Road & Avalon Road — two single ramps In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, the City solicited informal bids for the 2015 Asphalt Overlay Access Ramp Project Two. The City received one bid from Midwest Concrete, Inc. The bid was 4.26% below the Engineer's estimate of$71,753.63. Contractor Bid Results Midwest Concrete, Inc. $ 68,697.40 DISCUSSION The Asphalt Overlay Project - Curb Access Ramps Phase Two was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of $75,604.43 which is 10.05% over the contract amount of$68,697.40. It was determined an additional 70 linear feet of curb and gutter needed to be replaced in areas slated for asphalt, soil conditions required additional base stone for stabilization, additional sidewalk was poured to attain proper slopes, a storm water intake was replaced at Mullin & Asbury, and landscaping restoration required more topsoil and seeding due to the slopes of embankments at the back of sidewalk. These additions contributed to the increase in the final contract amount. The average cost per ramp was $3,149.29. Due to the topography of the area; all sidewalks were installed to the maximum limits in an effort to achieve the proper slopes mandated by PROWAG standards. BUDGETIMPACT The project cost summary for the 2015 Asphalt Overlay Access Ramp Project Two is as follows: Award Final Construction Contract $68,697.40 $75,604.43 Contingency $6,869.74 0.00 Construction Engineering & Inspection $11,335.07 6,276.98 Total Project Cost $86.902.21 -$a1,8-Q1.41 The funding summary for the project is as follows: CIP Fund Description Fund Amount 30012277 Asphalt Overlay Project Curb Access Ramps Phase $81 ,881.41 Three Total Project Funding $81,881.41 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the 2015 Asphalt Overlay Access Ramp Project Two. 2 Prepared By: Tom Kopp, Engineering Technician cc: Don Vogt, Public Warks Director John Klostermann, Public Works Supervisor Jenny Larson, Budget Director Jan Dienst, Civil Engineer 11 3 RESOLUTION NO. 406-15 ACCEPTING THE 2015 ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PROJECT TWO AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2015 Asphalt Overlay Project Curb Access Ramps Project Two (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the 2015 Asphalt Overlay Project Curb Access Ramps Project Two appropriations for the contract amount of $75,604.43, Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 7th day of December, 2015. , Kevin Firnstahl; (-M`C, City Clerk 'Lysin V. Sutton, Mayor Pro Tem CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2015 ASPHALT OVERLAY PROJECT CURB ACCESS RAMPS PROJECT TWO The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2015 Asphalt Overlay Project Curb Access Ramps Project Two, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $75,604.43. Dated this day of agaikr' , 2015. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 04 day of, 42015. Kevin Firnstahl,-(C C, City Clerk